| Copyright © 2009. National Academy of Sciences. All rights reserved. Terms of Use and Privacy Statement |
Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 141
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
Appendix E
Spreadsheet Data from Hydrogen Supply Chain Cost Analyses
INTRODUCTION
Following are the hydrogen production spreadsheets that are the basis for Chapter 5 in this report. As noted there, these charts are for different combinations of feedstock, status of technology (current versus possible future), and whether or not sequestration of carbon dioxide is required at facilities processing hydrocarbon feedstock. A modified version of Table 5-2, with additional pathways, is included here as Table E-1 for convenience in following the charts. This table lists the code for each pathway as used for identification in the charts.
The first spreadsheets are for the central station pathways, starting with a summary of the results in Table E-2. For each pathway, the hydrogen cost to the end user is listed as the sum of the production, distribution, and dispensing costs. The capital investment requirements and carbon dioxide emissions are also listed. Table E-3 is a summary of the design basis inputs for central plants. The central plants considered here can produce 1,200,000 kilograms of hydrogen per day (90 percent of the year), which will fuel more than 2 million fuel cell vehicles via four main transmission lines of 150 kilometers and 438 dispensing stations. The details for each pathway are then shown in Tables E-4 through E-12: first for natural gas, then coal, and nuclear. Finally, the associated transmission and dispensing analyses are shown in Tables E-13 through E-16.
To illustrate the detailed production spreadsheets, take CS NG-C (Table E-4) as an example. The size of the plant (1,102,041 kg/day of hydrogen) and annual load factor (98 percent) are entered at the top. In the top right corner, the spreadsheet calculates the vehicles that this plant could fuel for the assumed fleet (2,135,250 vehicles equivalent to 65 miles-per-gallon hybrids). Then characteristics of the natural gas and electricity inputs are entered (the latter to calculate overall carbon dioxide emissions). Capital costs are calculated on a unit basis and then multiplied by the capacity assumed, for a total of $453 million. Finally, the hydrogen costs are calculated for the assumed fuel, other variable, and capital costs. The final figure is $1.03/kg at the plant, not including any charge for carbon emissions. Delivering the hydrogen to the filling station would add $0.42 (Table E-13), and the costs of the filling station itself would add another $0.54 (Table E-15) for a total of $1.99. The assumed charge for carbon emissions at the production plant and indirectly from electric power generation would add $0.13, for a grand total of $2.11 (“total H2 costs” for “CS NG-C” in Table E-2).
Midsize plants are next, starting with the summary and design basis inputs in Tables E-17 and E-18. Natural gas and electrolysis plants are included here, unlike in Chapter 5. The analyses are shown in Tables E-19 to E-28. Also included is the distribution cost via tanker truck and dispensing costs, in Tables E-29 to E-32.
Distributed plants start with a summary and design basis inputs (Tables E-33 and E-34), then natural gas (Tables E-35 and E-36) and grid-based electrolysis (Tables E-37 to E-39) Included under the latter is a combination of natural-gas-assisted steam electrolysis case, for future technology only. Wind and photovoltaics are shown for both stand-alone units (Tables E-40 to E-43) and in combination with the power grid (Tables E-44 to E-47). Tables E-48 and E-49 show the detailed buildup of the cost of electricity from photovoltaics, which is an input to the electrolysis calculations.
OCR for page 142
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-1
Hydrogen Supply Chain Pathways Examined
Primary Energy Source
Scale
Natural Gas
Coal
Nuclear
Biomass
Grid-Based Electricity (from any source)
Wind
Photovoltaics
Central station
CN: CS NG-C
CN: CS Coal-C
FN: CS NG-F
FN: CS Coal-F
F: CS Nu-F
CY: CS NG-C-Seq
CY: CS Coal-C-Seq
FY: CS NG-F-Seq
FY: CS Coal-F-Seq
Midsize
CN: MS Bio-C
FN: MS Bio-F
CY: MS Bio-C-Seq
FY: MS Bio-F-Seq
Distributed
C: Dist NG-C
C: Dist Elec-C
C: Dist WT-Gr Elec-C
C: Dist PV-Gr Elec-C
F: Dist NG-F
F: Dist Elec-F
F: Dist WT-Gr Elec-F
F: Dist PV-Gr-Elec-F
NOTES: C= current technology; Y= sequestration (hydrocarbon feedstock in central station and midsize plants only); F= future technology; N= no sequestration. The abbreviations for the hydrogen supply chain pathways (e.g., CS NG-C) are from the detailed spreadsheets that follow.
OCR for page 143
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-2
Central Plant Summary of Results
Pathway
CS NG-C
CS NG-F
CS NG-C-Seq
CS NG-F- Seq
CS Coal-C
CS Coal-F
CS Coal-C-Seq
CS Coal-F-Seq
CS Nu-F
Table E-
4
5
6
7
8
9
10
11
12
Capital investment, milion $
H2 production
453.39
326.85
623.75
425.54
1,151.92
868.18
1,177.33
889.97
2,468.19
Distribution
724.75
532.98
724.75
532.98
724.75
532.98
724.75
532.98
532.98
Dispensing
714.51
507.42
714.51
507.42
714.51
507.42
714.51
507.42
507.42
Total Capital Investment
1,892.66
1,367.25
2,063.01
1,465.95
2,591.18
1,908.58
2,616.59
1,930.38
3,508.59
Production costs, $/kg H2
Variable costs
Feed
0.75
0.71
0.79
0.73
0.21
0.19
0.21
0.19
0.20
Electricity
0.03
0.03
0.08
0.06
0.11
0.04
0.17
0.08
Decommission fund
0.06
Non-fuel O&M, 1%/yr of capital
0.01
0.01
0.02
0.01
0.03
0.02
0.03
0.02
0.06
Total variable costs
0.79
0.74
0.89
0.80
0.35
0.25
0.41
0.30
0.32
Fixed costs, 5%/yr of capital
0.06
0.04
0.08
0.05
0.15
0.11
0.15
0.11
0.31
Capital charges, 18%/yr of capital
0.18
0.13
0.25
0.17
0.46
0.35
0.47
0.36
1.00
Total Production Costs
1.03
0.92
1.22
1.02
0.96
0.71
1.03
0.77
1.63
Distribution costs, $/kg H2
Variable costs
Labor
0
0
0
0
0
0
0
0
0
Fuel
0
0
0
0
0
0
0
0
0
Electricity
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01
Non-fuel O&M, 1%/yr of capital
0.02
0.01
0.02
0.01
0.02
0.01
0.02
0.01
0.01
Total variable costs
0.03
0.02
0.03
0.02
0.03
0.02
0.03
0.02
0.02
Fixed costs, 5%/yr of capital
0.09
0.07
0.09
0.07
0.09
0.07
0.09
0.07
0.07
Capital charges, 18%/yr of capital
0.29
0.21
0.29
0.21
0.29
0.21
0.29
0.21
0.21
Total Distribution Costs
0.42
0.31
0.42
0.31
0.42
0.31
0.42
0.31
0.31
OCR for page 144
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
Pathway
CS NG-C
CS NG-F
CS NG-C-Seq
CS NG-F- Seq
CS Coal-C
CS Coal-F
CS Coal-C-Seq
CS Coal-F-Seq
CS Nu-F
Table E-
4
5
6
7
8
9
10
11
12
Dispensing costs, $/kg H2
Variable costs
Electricity
0.14
0.11
0.14
0.11
0.14
0.11
0.14
0.11
0.11
Non-fuel O&M, 1%/yr of capital
0.09
0.06
0.09
0.06
0.09
0.06
0.09
0.06
0.06
Total variable costs
0.23
0.17
0.23
0.17
0.23
0.17
0.23
0.17
0.17
Fixed costs, 5%/yr of capital
0.05
0.04
0.05
0.04
0.05
0.04
0.05
0.04
0.04
Capital charges, 18%/yr of capital
0.25
0.18
0.25
0.18
0.25
0.18
0.25
0.18
0.18
Total Dispensing Costs
0.54
0.39
0.54
0.39
0.54
0.39
0.54
0.39
0.39
H2 costs, $/kg
Production
1.03
0.92
1.22
1.02
0.96
0.71
1.03
0.77
1.63
Distribution
0.42
0.31
0.42
0.31
0.42
0.31
0.42
0.31
0.31
Dispensing
0.54
0.39
0.54
0.39
0.54
0.39
0.54
0.39
0.39
CO2 disposal
0
0
0.09
0.08
0
0
0.16
0.15
Carbon tax
0.13
0.12
0.02
0.02
0.26
0.23
0.04
0.03
Total H2 Costs
2.11
1.73
2.28
1.82
2.17
1.63
2.19
1.64
2.33
Carbon dioxide vented to atmosphere
kg carbon/kg H2
2.51
2.39
0.42
0.35
5.12
4.56
0.82
0.60
Direct use
2.45
2.34
0.26
0.24
4.90
4.50
0.49
0.45
Indirect use
0.06
0.05
0.16
0.12
0.21
0.07
0.33
0.15
kg CO2/kg H2
9.22
8.75
1.53
1.30
18.76
16.73
3.00
2.21
Direct use
8.99
8.56
0.95
0.88
17.98
16.49
1.80
1.65
Indirect use
0.23
0.18
0.58
0.42
0.77
0.25
1.20
0.56
Carbon charge ($/kg)
0.13
0.12
0.02
0.02
0.26
0.23
0.04
0.03
Carbon dioxide sequestered
Carbon dioxide (kg CO2/kg H2)
8.56
7.91
16.19
14.84
Carbon
2.34
2.16
4.41
4.05
OCR for page 145
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-3
Central Hydrogen Plant Summary of Inputs
OCR for page 146
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-4
CS NG-C
CS Size Hydrogen Steam Reforming of Natural Gas with Current Technology
OCR for page 147
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-5
CS NG-F
CS Size Hydrogen via Steam Reforming of Natural Gas with Future Optimism
OCR for page 148
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-6
CS NG-C Seq
CS Size Hydrogen via Steam Reforming of Natural Gas plus CO2 Capture with Current Technology
OCR for page 149
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-7
CS NG-F Seq
CS Size Hydrogen via Steam Reforming of Natural Gas Plus CO2 Capture with Future Optimism
OCR for page 150
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-8
CS Coal-C
CS Size Hydrogen via Coal Gasification with Current Technology
OCR for page 151
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-9
CS Coal-F
CS Size Hydrogen via Coal Gasification with Future Technology
OCR for page 183
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-39
Dist NGASE-F
Distributed Size Onsite Hydrogen via Natural Gas-Assisted Steam Electrolysis of Water with Future Optimism
OCR for page 184
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-40
Dist WT Ele-C
Distributed Size Onsite Hydrogen via Wind-Turbine-Based Electrolysis with Current Technology
OCR for page 185
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-41
Dist WT Ele-F
Distributed Size Onsite Hydrogen via Wind-Turbine-Based Electrolysis with Future Optimism
OCR for page 186
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-42
Dist PV Ele-C
Distributed Size Onsite Hydrogen via PV Solar-Based Electrolysis with Current Technology
OCR for page 187
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-43
Dist PV Ele-F
Distributed Size Onsite Hydrogen via PV Solar-Based Electrolysis with Future Optimism
OCR for page 188
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
Table E-44
Dist WT Gr Ele-C
Distributed Size Onsite Hydrogen via Wind Turbine/Grid Hybrid-Based Electrolysis with Current Costs
OCR for page 189
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-45
Dist WT-Gr Ele-F
Distributed Size Onsite Hydrogen via Wind Turbine/Grid Hybrid-Based Electrolysis with Future Optimism
OCR for page 190
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
Table E-46
Dist PV-Gr Ele-C
Distributed Size Onsite Hydrogen via Photovoltaics/Grid Hybrid-Based Electrolysis with Current Costs
OCR for page 191
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-47
Dist PV-Gr Ele-F
Distributed Size Onsite Hydrogen via PV/Grid Hybrid-Based Electrolysis with Future Optimism
OCR for page 192
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-48
Dist PV-C
Photovoltatic Solar Power Generation Economics for Current Technology
OCR for page 193
The Hydrogen Economy: Opportunities, Costs, Barriers, and R&D Needs
TABLE E-49
Dist PV-F
Photovoltaic Solar Power Generation Economics of Future Optimism
Representative terms from entire chapter:
current technology