National Academy of Sciences | 150 Year Anniversary

Questions? Call 800-624-6242

| Items in cart [0]

The National Academies Press

PAPERBACK
price:$75.00
add to cart

Rights & Permissions

topleft topright

Superfund and Mining Megasites: Lessons from the Coeur d'Alene River Basin (2005)
Board on Environmental Studies and Toxicology (BEST)

Citation Manager

. "8 Remediation Objectives and Approaches." Superfund and Mining Megasites: Lessons from the Coeur d'Alene River Basin. Washington, DC: The National Academies Press, 2005.

Please select a format:

BibTeX EndNote RefMan


Page
410
bottomleft bottomright

The following HTML text is provided to enhance online readability. Many aspects of typography translate only awkwardly to HTML. Please use the page image as the authoritative form to ensure accuracy.


Superfund and Mining Megasites: Lessons from the Coeur d’alene River Basin

URS Greiner, Inc., and CH2M Hill. 2001b. Final (Revision 2) Feasibility Study Report, Part 3. Ecological Alternatives, Vol.3., Appendices AA through AB. URSG DCN 4162500. 6659.05a. Prepared for U.S. Environmental Protection Agency, Region 10, Seattle, WA, by URS Greiner, Inc., Seattle, WA, and CH2M Hill, Bellevue, WA. October 2001.

URS Greiner, Inc., and CH2M Hill. 2001c. Final (Revision 2) Remedial Investigation Report, Remedial Investigation Report for the Coeur d’Alene Basin Remedial Investigation/ Feasibility Study, Vol. 4. Part 3. CSM Unit 2, Midgradient Watersheds, South Fork Coeur d’Alene River. URSG DCN 4162500.6659.05a. Prepared for U.S. Environmental Protection Agency, Region 10, Seattle, WA, by URS Greiner, Inc., Seattle, WA, and CH2M Hill, Bellevue, WA. September 2001.

URS Greiner, Inc., and CH2M Hill. 2001d. Final (Revision 2) Remedial Investigation Report, Remedial Investigation Report for the Coeur d’Alene Basin Remedial Investigation/ Feasibility Study, Vol. 4. Part 3. CSM Unit 2, Midgradient Watersheds, North Fork Coeur d’Alene River. URSG DCN 4162500.6659.05a. Prepared for U.S. Environmental Protection Agency, Region 10, Seattle, WA, by URS Greiner, Inc., Seattle, WA, and CH2M Hill, Bellevue, WA. September 2001.

URS Greiner, Inc., and CH2M Hill. 2001e. Probabilistic Analysis of Post-Remediation Metal Loading Technical Memorandum (Revision 1). URSG DCN 4162500.06778.05.a. Prepared for U.S. Environmental Protection Agency, Region 10, Seattle, WA, by URS Greiner, Inc., Seattle, WA, and CH2M Hill, Bellevue, WA. September 20, 2001.

URS Greiner, Inc., and CH2M Hill. 2001f. Final (Revision 2) Remedial Investigation Report, Remedial Investigation Report for the Coeur d’Alene Basin Remedial Investigation/ Feasibility Study, Vol. 1. Part 1. Setting and Methodology. URSG DCN 4162500. 6659.05a. Prepared for U.S. Environmental Protection Agency, Region 10, Seattle, WA, by URS Greiner, Inc., Seattle, WA, and CH2M Hill, Bellevue, WA. September 2001.

URS Greiner, Inc., and CH2M Hill. 2001g. Final (Revision 2) Remedial Investigation Report, Remedial Investigation Report for the Coeur d’Alene Basin Remedial Investigation/ Feasibility Study, Vol. 2. Part 2. CSM Unit 1, Upper Watersheds Canyon Creek. URSG DCN 4162500.6659.05a. Prepared for U.S. Environmental Protection Agency, Region 10, Seattle, WA, by URS Greiner, Inc., Seattle, WA, and CH2M Hill, Bellevue, WA. September 2001.

URS Greiner, Inc., and CH2M Hill. 2001h. Final (Revision 2) Remedial Investigation Report, Remedial Investigation Report for the Coeur d’Alene Basin Remedial Investigation/ Feasibility Study, Vol. 10. URSG DCN 4162500.6659.05a. Prepared for U.S. Environmental Protection Agency, Region 10, Seattle, WA, by URS Greiner, Inc., Seattle, WA, and CH2M Hill, Bellevue, WA. September 2001.

URS Group, Inc., and CH2M Hill. 2004. Basin Environmental Monitoring Plan for Bunker Hill Mining and Metallurgical Complex Operable Unit 3. URS DCN 4162500. 07190.05.a. Prepared for U.S. Environmental Protection Agency, Region 10, Seattle, WA, by URS Group, Inc., Washington, DC, and CH2M Hill, Bellevue, WA, March 26, 2004 [online]. Available: yosemite.epa.gov/.../fb6a4e3291f5d28388256d140051048b/503bcd6aa1bd60a288256cce00070286/$FILE/Preface.pdf [accessed Jan. 12, 2004].


Vannote, R.L., G.W. Minshall, J.R. Cummins, J.R. Sedell, and C.E. Cushing. 1980. The river continuum concept. Can. J. Fish. Aquat. Sci. 37:130-137.

von Lindern, I. 2004. Background for Assessing Lead Health Response Actions in the Silver Valley of Idaho. Presentation at the Fist Meeting on Superfund Site Assessment and Remediation in the Coeur d’Alene River Basin, January 22, 2004, Washington, DC.


Woods, P.F. 2001. Concentrations and Loads of Cadmium, Lead, Zinc, and Nutrients Measured During the 1999 Water Year Within the Spokane River Basin, Idaho and Washington. Open-File Report 00–441. U.S. Department of Interior, U.S, Geological Survey, Boise, ID [online]. Available: http://id.water.usgs.gov/PDF/ofr00441/ [accessed June 30, 2005].

Page
410