Tank Wastes Planned for On-Site Disposal at Three Department of Energy Sites: The Savannah River Site - Interim Report (2005)
Nuclear and Radiation Studies Board (NRSB)

Citation Manager

. "Appendix F Federal Facility Agreement Waste Removal Schedule." Tank Wastes Planned for On-Site Disposal at Three Department of Energy Sites: The Savannah River Site - Interim Report. Washington, DC: The National Academies Press, 2005.

Please select a format:

BibTeX EndNote RefMan


Page
78
bottomleft bottomright

The following HTML text is provided to enhance online readability. Many aspects of typography translate only awkwardly to HTML. Please use the page image as the authoritative form to ensure accuracy.


Tank Wastes Planned for On-Site Disposal at Three Department of Energy Sites: The Savannah River Site - Interim Report

Appendix F
Federal Facility Agreement Waste Removal Schedule

The Savannah River Site Federal Facility Agreement (FFA) requires the U.S. Department of Energy to submit to the U.S. Environmental Protection Agency and the South Carolina Department of Environmental Control an annual report containing, among other items, the schedule for the removal of high-level waste from noncompliant tanks (i.e., those that do not have a full secondary containment). These are Tanks 1 through 24. Figure F-1 shows the latest removal schedule, as of September 2004 (DOE, 2005).

FIGURE F1 Federal Facility Agreement waste removal schedule, revision 2, as of September 2004. SOURCE: DOE (2005).

Reference

U.S. Department of Energy (DOE). 2005. F/H Area High Level Waste Tank Status Report for CY2004. CBU-ENG-2005-00005. Aiken, S.C.

Page
78

Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.

OCR for page 78
Tank Wastes Planned for On-Site Disposal at Three Department of Energy Sites: The Savannah River Site - Interim Report Appendix F Federal Facility Agreement Waste Removal Schedule The Savannah River Site Federal Facility Agreement (FFA) requires the U.S. Department of Energy to submit to the U.S. Environmental Protection Agency and the South Carolina Department of Environmental Control an annual report containing, among other items, the schedule for the removal of high-level waste from noncompliant tanks (i.e., those that do not have a full secondary containment). These are Tanks 1 through 24. Figure F-1 shows the latest removal schedule, as of September 2004 (DOE, 2005). FIGURE F1 Federal Facility Agreement waste removal schedule, revision 2, as of September 2004. SOURCE: DOE (2005). Reference U.S. Department of Energy (DOE). 2005. F/H Area High Level Waste Tank Status Report for CY2004. CBU-ENG-2005-00005. Aiken, S.C.

Representative terms from entire chapter:

facility agreement