FIRST COMMITTEE MEETING: SEPTEMBER 5-7, 2007 PASCO, WASHINGTON

Objectives: National Research Council introduction (administrative actions, including committee introductions and composition/balance/bias discussions for committee members), committee statement of task and background review with sponsor, receive detailed process and equipment briefing presentations (performance requirements, modeling results, and test results) for first-of-a-kind Blue Grass metal parts treater (MPT) and related Pueblo munitions treatment unit (MTU), review preliminary report outline and report writing process, confirm committee assignments, writing teams’ first draft, decide future meeting dates, MTU site visit team, and next steps.

Briefings and Discussions

Consideration of Statement of Task with Sponsor: Bob Beaudet, Committee Chair; Joe Novad, Technical Director, Assembled Chemical Weapons Alternatives (ACWA); Darren Dalton, Blue Grass Design Team Leader, ACWA


Overview of the Blue Grass Chemical Agent Destruction Pilot Plant (BGCAPP) Process: Sam Hariri, BPBGT Process Design Lead


Metal Parts Treater Design and Performance Detail: Mark Rieb, Deputy Director, Parsons Technology Development and Fabrication Complex; John Ursillo, BPBGT Pasco Resident Engineer; Jonathan Berkoe, Manager, Bechtel Advanced Simulation and Analysis Group


Overview of PCAPP Process and Munitions Treatment Unit (MTU) and Supplemental Decontamination Unit, MTU Function and Feeds, Comparisons to MPT: Paul Dent, Manager, PCAPP Technical Risk Reduction Program

SITE VISIT: SEPTEMBER 22-23, 2007 ST. MARYS, PENNSYLVANIA

Objectives: Receive detailed process and equipment briefing presentations, including performance requirements, modeling results, and test results for the MTU; visit Abbott Furnace Company to see the MTU.

Briefings and Discussions

Introduction to Abbott Furnace: Mike Gelsick, Director of Marketing, Abbott Furnace Company


Design Overview Using Large MTU Wall Drawing: Tom Jesberger, Chief Technical Officer, Abbott Furnace Company


MTU TRRP Testing and Test Results: Scott Pierce, MTU Project Manager, Abbott Furnace Company


Tour of MTU: Abbott Furnace Company


Review of Upgrades for First-of-a-Kind (FOAK) MTU: Tom Jesberger, Chief Technical Officer, Abbott Furnace Company


SDU/Autoclave Open Discussion: Craig Myler, Bechtel Pueblo



The National Academies | 500 Fifth St. N.W. | Washington, D.C. 20001
Copyright © National Academy of Sciences. All rights reserved.
Terms of Use and Privacy Statement



Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.

OCR for page 47
appendix B committee meetings and site Visits FirsT commiTTee meeTiNG: sePTemBer 5-7, 2007 Overview of PCaPP Process and Munitions Treatment unit Pasco, WashiNGToN (MTu) and Supplemental decontamination unit, MTu Function and Feeds, Comparisons to MPT: Paul Dent, Objectives: National Research Council introduction (ad- Manager, PCAPP Technical Risk Reduction Program ministrative actions, including committee introductions and composition/balance/bias discussions for committee siTe VisiT: sePTemBer 22-23, 2007 members), committee statement of task and background sT. marYs, PeNNsYlVaNia review with sponsor, receive detailed process and equipment briefing presentations (performance requirements, modeling Objectives: Receive detailed process and equipment briefing results, and test results) for first-of-a-kind Blue Grass metal presentations, including performance requirements, model- parts treater (MPT) and related Pueblo munitions treatment ing results, and test results for the MTU; visit Abbott Furnace unit (MTU), review preliminary report outline and report Company to see the MTU. writing process, confirm committee assignments, writing teams’ first draft, decide future meeting dates, MTU site visit Briefings and Discussions team, and next steps. introduction to abbott Furnace: Mike Gelsick, Director of Marketing, Abbott Furnace Company Briefings and Discussions Consideration of Statement of Task with Sponsor: Bob design Overview using large MTu wall drawing: Tom Jes- Beaudet, Committee Chair; Joe Novad, Technical Director, berger, Chief Technical Officer, Abbott Furnace Company Assembled Chemical Weapons Alternatives (ACWA); Dar- ren Dalton, Blue Grass Design Team Leader, ACWA MTu TRRP Testing and Test Results: Scott Pierce, MTU Project Manager, Abbott Furnace Company Overview of the blue grass Chemical agent destruction Pilot Plant (bgCaPP) Process: Sam Hariri, BPBGT Process Tour of MTu: Abbott Furnace Company Design Lead Review of upgrades for First-of-a-Kind (FOaK) MTu: Metal Parts Treater design and Performance detail: Mark Tom Jesberger, Chief Technical Officer, Abbott Furnace Rieb, Deputy Director, Parsons Technology Development Company and Fabrication Complex; John Ursillo, BPBGT Pasco Resident Engineer; Jonathan Berkoe, Manager, Bechtel Sdu/autoclave Open discussion: Craig Myler, Bechtel Advanced Simulation and Analysis Group Pueblo 

OCR for page 47
 ReView aNd aSSeSSMeNT OF deVelOPMeNTal iSSueS CONCeRNiNg The MeTal PaRTS TReaTeR deSigN secoNd commiTTee meeTiNG: ocToBer 16-18, 2007 Third commiTTee meeTiNG: NoVemBer 6-8, 2007 BeckmaN ceNTer, irViNe, caliForNia BeckmaN ceNTer, irViNe, caliForNia Objectives: Receive additional briefings, review first full Objectives: Review first full message draft, determine what message draft, produce preliminary concurrence draft, and is not yet known and how to learn it, produce preliminary determine what is not yet known and how to learn it. concurrence draft, sign concurrence documents. (No brief- ings scheduled.) Briefings and Discussions Metal Parts Treater design and Performance: Darren Dal- ton, Blue Grass Design Team Leader, ACWA; Ed Rogers, Bechtel; Roger Dickerman, Washington Group International; Sam Hariri, BPBGT Process Design Lead