APPENDIX B
Research Projects Under the Strategic Highway Research Program 2 as of July 3, 2008

Project Number

Project Title

Stage

SHRP 2 Safety Projects

SHRP 2 S01 (A)

Development of Analysis Methods Using Recent Data

Active

SHRP 2 S01 (B)

Development of Analysis Methods Using Recent Data

Active

SHRP 2 S01 (C)

Development of Analysis Methods Using Recent Data

Active

SHRP 2 S01 (D)

Development of Analysis Methods Using Recent Data

Active

SHRP 2 S01 (E)

Development of Analysis Methods Using Recent Data

Active

SHRP 2 S02

Integrate Methods and Develop Analysis Plan

Active

SHRP 2 S03

Roadway Measurement System Evaluation

Active

SHRP 2 S04

Acquisition of Roadway Information

Anticipated

SHRP 2 S05

Design of the In-Vehicle Driving Behavior and Crash Risk Study

Active

SHRP 2 S06

Technical Coordination and Independent Quality Assurance for Field Study

Anticipated

SHRP 2 S07

In-Vehicle Driving Behavior Field Study

Anticipated

SHRP 2 S08

Analysis of In-Vehicle Field Study Data and Countermeasure Implications

Anticipated

SHRP 2 S09

Site-Based Video System Design and Development

Active

SHRP 2 S10

Design and Conduct of the Site-Based Field Study

Anticipated

SHRP 2 S11

Analysis of Site-Based Field Study Data and Countermeasure Implications

Anticipated

SHRP 2 Renewal Projects

SHRP 2 R01

Encouraging Innovation in Locating and Characterizing Underground Utilities

Active

SHRP 2 R02

Geotechnical Solutions for Soil Improvement, Rapid Embankment Construction, and Stabilization of the Pavement Working Platform

Active

SHRP 2 R04

Innovative Bridge Designs for Rapid Renewal

Active

SHRP 2 R05

Modular Pavement Technology

Active

SHRP 2 R06

A Plan for Developing High Speed, Nondestructive Testing Procedures for Both Design Evaluation and Construction Inspection

Active



The National Academies | 500 Fifth St. N.W. | Washington, D.C. 20001
Copyright © National Academy of Sciences. All rights reserved.
Terms of Use and Privacy Statement



Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.

OCR for page 146
APPENDIX B Research Projects Under the Strategic Highway Research Program 2 as of July 3, 2008 Project Number Project Title Stage SHRP 2 Safety Projects SHRP 2 S01 (A) Active Development of Analysis Methods Using Recent Data SHRP 2 S01 (B) Active Development of Analysis Methods Using Recent Data SHRP 2 S01 (C) Active Development of Analysis Methods Using Recent Data SHRP 2 S01 (D) Active Development of Analysis Methods Using Recent Data SHRP 2 S01 (E) Active Development of Analysis Methods Using Recent Data SHRP 2 S02 Active Integrate Methods and Develop Analysis Plan SHRP 2 S03 Active Roadway Measurement System Evaluation SHRP 2 S04 Anticipated Acquisition of Roadway Information SHRP 2 S05 Active Design of the In-Vehicle Driving Behavior and Crash Risk Study SHRP 2 S06 Anticipated Technical Coordination and Independent Quality Assurance for Field Study SHRP 2 S07 Anticipated In-Vehicle Driving Behavior Field Study SHRP 2 S08 Anticipated Analysis of In-Vehicle Field Study Data and Countermeasure Implications SHRP 2 S09 Active Site-Based Video System Design and Development SHRP 2 S10 Anticipated Design and Conduct of the Site-Based Field Study SHRP 2 S11 Anticipated Analysis of Site-Based Field Study Data and Countermeasure Implications SHRP 2 Renewal Projects SHRP 2 R01 Active Encouraging Innovation in Locating and Characterizing Underground Utilities SHRP 2 R02 Active Geotechnical Solutions for Soil Improvement, Rapid Embankment Construction, and Stabilization of the Pavement Working Platform SHRP 2 R04 Active Innovative Bridge Designs for Rapid Renewal SHRP 2 R05 Active Modular Pavement Technology SHRP 2 R06 Active A Plan for Developing High Speed, Nondestructive Testing Procedures for Both Design Evaluation and Construction Inspection (continued) 146

OCR for page 146
Research Projects Under SHRP 2 as of July 3, 2008 147 Project Number Project Title Stage Active SHRP 2 R07 Performance Specifications for Rapid Renewal Active SHRP 2 R09 Guide for the Process of Managing Risk on Rapid Renewal Contracts Active SHRP 2 R15 Strategies for Integrating Utility and Transportation Agency Priorities in Highway Renewal Projects Active SHRP 2 R16 Railroad-DOT Institutional Mitigation Strategies Active SHRP 2 R19 (A) Bridges for Service Life Beyond 100 Years: Innovative Systems, Subsystems, and Components RFP SHRP 2 R19 (B) Bridges for Service Life Beyond 100 Years: Service Limit State Design Active SHRP 2 R21 Composite Pavement Systems Active SHRP 2 R23 Using Existing Pavement in Place and Achieving Long Life Active SHRP 2 R26 Preservation Approaches for High Traffic Volume Roadways SHRP 2 Reliability Projects Activea SHRP 2 L01 Identification and Analysis of Best Practices SHRP 2 L02 Establishing Monitoring Programs for Mobility and Anticipated Travel Time Reliability SHRP 2 L03 Analytic Procedures for Determining the Impacts of Reliability Active Mitigation Strategies SHRP 2 L04 Incorporating Reliability Performance Measures in Planning Anticipated and Operations Modeling Tools SHRP 2 L05 Incorporating Reliability Performance Measures into the Anticipated Transportation Planning and Programming Processes SHRP 2 L06 Institutional Architectures to Advance Operational Strategies Active SHRP 2 L07 Evaluation of Cost-Effectiveness of Highway Design Features Active SHRP 2 L08 Incorporation of Non-Recurrent Congestion Factors into the Anticipated Highway Capacity Manual Methods SHRP 2 L09 Incorporation of Non-Recurrent Congestion Factors into the Anticipated AASHTO Policy on Geometric Design SHRP 2 L10 Feasibility of Using In-Vehicle Video Data to Explore RFP How to Modify Driver Behavior That Causes Non-Recurring Congestion SHRP 2 L11 Evaluating Alternative Operations Strategies to Improve Travel RFP Time Reliability SHRP 2 L12 Training and Certification for Traffic Incident Responders Pending SHRP 2 L13 Requirements and Feasibility of a System for Archiving and RFP Disseminating Data from SHRP 2 Reliability and Related Studies SHRP 2 L14 Effectiveness of Different Approaches to Disseminating Anticipated Traveler Information on Travel Time Reliability SHRP 2 L15 Reliability Innovations Deserving Exploratory Analysis (IDEA) Anticipated (continued on next page)

OCR for page 146
148 The Federal Investment in Highway Research 2006–2009: Strengths and Weaknesses Research Projects Under the Strategic Highway Research Program 2 as of July 3, 2008 (continued) Project Number Project Title Stage SHRP 2 Capacity Projects Active SHRP 2 C01 A Framework for Collaborative Decision Making on Additions to Highway Capacity Active SHRP 2 C02 A Systems-Based Performance Measurement Framework for Highway Capacity Decision Making Active SHRP 2 C03 Interactions Between Transportation Capacity, Economic Systems, and Land Use Merged with Integrating Economic Considerations Project Development Active SHRP 2 C04 Improving Our Understanding of How Highway Congestion and Pricing Affect Travel Demand Active SHRP 2 C05 Understanding the Contribution of Operations, Technology, and Design to Meeting Highway Capacity Needs RFP SHRP 2 C06 (A) Integration of Conservation, Highway Planning, and Environmental Permitting Using an Outcome-Based Ecosystem Approach RFP SHRP 2 C06 (B) Development of an Ecological Assessment Process and Credits System for Enhancements to Highway Capacity Anticipated SHRP 2 C07 Integrating SHRP 2 Products into the Collaborative Decision Making Process (1) Anticipated SHRP 2 C08 Linking Community Visions and Highway Capacity Planning Anticipated SHRP 2 C09 Incorporating Greenhouse Gas Emissions into the Collaborative Decision-Making Process Anticipated SHRP 2 C10 Partnership to Develop an Integrated, Advanced Travel Demand Model and a Fine-Grained, Time-Sensitive Network Anticipated SHRP 2 C11 Development of Improved Economic Analysis Tools Based on Recommendations from Project C03 (2) Anticipated SHRP 2 C12 The Effect of Public-Private Partnerships and Non-Traditional Procurement Processes on Highway Planning, Environmental Review, and Collaborative Decision Making Anticipated SHRP 2 C13 Integrating Full Cost Analysis and Fiscal Impact Analysis into Collaborative Decision Making Anticipated SHRP 2 C14 Developing a Multiagency Change Management Framework Anticipated SHRP 2 C15 Integrating Freight Considerations into Collaborative Decision Making for Additions to Highway Capacity Anticipated The Effect of Smart Growth Policies on Travel Demand SHRP 2 C16 aThis request for proposals (RFP) was originally issued in July 2007; no proposal received was deemed responsive, so no contract award was made. A preproposal conference is planned before a revised RFP is issued by July 2008.