Appendix D
Sample Format for Benchmarking Data

GSF Served

 

 

 

Annual Electrical Used (KWh)

 

 

 

Fuel Type Used

Coal

Natural Gas

Fuel Oil

Annual Fuel Amount (Tons, MMBTU, gallons, KWh)

 

 

 

Campus Peak Load (MW)

 

 

 

Equipment Type

Combustion Turbine

Steam Turbine

Recip Engine

Equipment Rated Capacity (MW)

 

 

 

Total Annual Steam Production (lbs/hr)

 

 

 

In-Plant Steam Pressure/Temp (psi, degrees F)

 

 

 

Distribution Steam Pressure/Temp (psi, degrees F)

 

 

 

Fuel Type Used

Coal

Natural Gas

Fuel Oil

Annual Fuel Amount (Tons, MMBTU, gallons, KWh)

 

 

 

Peak Load (lbs/hr)

 

 

 

Equipment Type

Boiler Fluidized Bed

Boiler Stoker

Boiler (Natural Gas)

Total Rated Capacity

 

 

 

Chilled Water (ton-hr)

 

 

 

Fuel Used

Purchased Electricity

Self Generated Electricity

Steam

Annual Fuel Amount (KWh, KWh, lbs/hr)

 

 

 

Peak Load (tons)

 

 

 

Equipment Type

Electric Chiller

Steam Turbine Driven Chiller

Absorption

Equipment Rated Capacity (tons)

 

 

 

Average Annual Steam Efficiency (%)

 

Total Steam Out/Total Fuel Used 1

Average Annual Heat Rate (BTU/KWh)

 

 

 

Average Annual Chilled Water COP

 

 

 

Average Annual System Efficiency %

 

(Total Energy Delivered to Campus) 1/(Total Fuel Used) 1

Fuel Cost

 

 

 

Average Annual Coal Cost ($/ton)

 

 

 

Annual Average Natural Gas Cost ($/MMBTU)

 

 

 

Annual Average Generated Electrical Rate ($/KWh)

 

 

 

Annual Average Purchased Electrical Rate ($/KWh)

 

 

 

Customer System Reliability (Last Year in %)

 

((24x365)-Total Unplanned Facility Utility Outage Hours)/(24x365)

Electrical System

 

 

 

Steam System

 

 

 

Chilled Water System

 

 

 



The National Academies | 500 Fifth St. N.W. | Washington, D.C. 20001
Copyright © National Academy of Sciences. All rights reserved.
Terms of Use and Privacy Statement



Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.

OCR for page 37
Appendix D Sample Format for Benchmarking Data GSF Served A nnual Electrical Used (KWh) Fuel Type Used Coal Natural Gas Fuel Oil A nnual Fuel Amount (Tons, MMBTU, gallons, KWh) Campus Peak Load (MW) Equipment Type Combustion Turbine Steam T urbine Recip Engine Equipment Rated Capacity (MW) T otal Annual Steam Production (lbs/hr) In-Plant Steam Pressure/Temp (psi, degrees F) Distribution Steam Pressure/Temp (psi, degrees F) Fuel Type Used Coal Natural Gas Fuel Oil A nnual Fuel Amount (Tons, MMBTU, gallons, KWh) Peak Load (lbs/hr) Equipment Type Boiler Fluidized Bed Boiler Stoker Boiler (Natural Gas) T otal Rated Capacity Chilled Water (ton-hr) Fuel Used Purchased Electricity Self Generated Electricity Steam A nnual Fuel Amount (KWh, KWh, lbs/hr) Peak Load (tons) Equipment Type Electric Chiller Steam T urbine Driven Chiller Absorption Equipment Rated Capacity (tons) Total Steam Out/Total Fuel Used1 A verage Annual Steam Efficiency (%) A verage Annual Heat Rate (BTU/KWh) A verage Annual Chilled Water COP (Total Energy Delivered to Campus) 1/(Total Fuel Used) 1 A verage Annual System Efficiency % Fuel Cost A verage Annual Coal Cost ($/ton) A nnual Average Natural Gas Cost ($/MMBTU) A nnual Average Generated Electrical Rate ($/KWh) A nnual Average Purchased Electrical Rate ($/KWh) Customer System Reliability ((24x365)-Total Unplanned Facility Utility Outage Hours)/(24x365) (Last Y ear in %) Electrical System Steam System Chilled Water System 37

OCR for page 37