This assessment model is based on a 300 MW solar tower power plant which will be built in Hami, Xinjiang Autonomic Region. The geographic reference of this assessment is Hami in China, and the data time reference is 2008. The functional unit used is 1 kWh produced at the power plant, and it is supposed that the exhaust pressure of the solar tower power plant is 0.06 bar. The characteristics of the 300MW solar tower power plant analyzed by Wang and Zhang (2008) are summarized below. Details can be seen in Table B-1.
The life cycle assessment (LCA) of the 300 MW solar tower power plant was performed using the software tool AGP (Assessment for Green-Product) developed by the Research Center for Eco-Environmental Sciences, Chinese Academy of Science (CAS), based on Chinese product and environmental data. LCA is conducted using APG modules for control interface, input of data listing, output of data listing, and environmental impact assessments. Five processes are divided and modeled in the life cycle of solar tower power plants:
The raw materials extraction and manufacturing of components of the power plant. This process includes the energy demand and emission of the facility materials in exploitation and manufacture.
The transport phase includes the transportation of raw materials, facilities, and construction materials.
The construction activities cover workshop, tower, and pipeline.
Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 217
Appendix B
Life Cycle Assessment of
Solar Thermal Power Technology in China
Description of the Assessment Model
This assessment model is based on a 300 MW solar tower power plant which
will be built in Hami, Xinjiang Autonomic Region. The geographic reference of
this assessment is Hami in China, and the data time reference is 2008. The func-
tional unit used is 1 kWh produced at the power plant, and it is supposed that the
exhaust pressure of the solar tower power plant is 0.06 bar. The characteristics
of the 300MW solar tower power plant analyzed by Wang and Zhang (2008) are
summarized below. Details can be seen in Table B-1.
Impacts Assessment Model and System Boundaries
The life cycle assessment (LCA) of the 300 MW solar tower power plant
was performed using the software tool AGP (Assessment for Green-Product)
developed by the Research Center for Eco-Environmental Sciences, Chinese
Academy of Science (CAS), based on Chinese product and environmental data.
LCA is conducted using APG modules for control interface, input of data listing,
output of data listing, and environmental impact assessments. Five processes are
divided and modeled in the life cycle of solar tower power plants:
1. The raw materials extraction and manufacturing of components of the
power plant. This process includes the energy demand and emission of
the facility materials in exploitation and manufacture.
2. The transport phase includes the transportation of raw materials, facilities,
and construction materials.
3. The construction activities cover workshop, tower, and pipeline.
7
OCR for page 217
8 APPENDIX b
TABLE B-1 Characteristics of the Studied Solar Thermal Power
Technology type Solar central tower power
Installed capacity 300 MW
1,875 KW h/m2 yr
Direct normal irradiation
Number of heliostats 25,020
2,502,000 m2
Aperture
Technical lifetime 25 years
Energy generated per year 657 GWh
Energy generated in the lifetime 16,425 GWh
Electricity consumption by self-produced 1,150 GWh
electricity
Net efficiency 14.06%
4. In the operation stage the solar thermal power systems transform solar
energy to electricity, and no other fossil energy is required except that
a small amount of fossil fuel is required in the startup of the electricity
generating set. Thereafter, electricity needs are met by the on-site solar
generation. The energy demand and emissions can be neglected because
so little fossil fuel is used.
5. The impacts of decommissioning of the power plant and the disposal of
all the waste materials could not be quantified here due to the lack of reli -
able data, and so the energy and emissions produced in the disposal of all
the waste materials of the power plant could not be accounted for in this
study.
Processes modeled in the life cycle of the solar thermal power plants are depicted
in Figure B-1.
Assessment Methods
The life cycle of the solar thermal power plant is completed using the follow -
ing three environmental load profiles. First, the energy balance factor (EBF) is
the ratio of energy output to input, which is used to confirm whether the system
is feasible as an energy production system. Second, the energy payback time
(EPT) is the index that accounts, by energy production, for the number of years
required to recover the total energy input into the system over an entire life cycle.
The third is the CO2 emission factor (CEF), which is the CO2 emission per unit
of electricity generated. The CEF of the solar thermal power generation plant
analyzed in this study are compared with that of a coal-fired power generation
plant, which is reported to have the highest environmental impact among various
power generation technologies.
OCR for page 217
APPENDIX b
Energy
Solar thermal power plant Emissions
Manufacturing Constructions Transpor tation Operatio n and Dismantling
of materials ac tivities maintenance ac tivities
and
Raw
components Workshop Electricit y
materials
Solar
Solar field Nature
Facilities
Resources tower
gas
Electricit y
Power block
to the grid
1kWh
System boundaries
FIGURE B-1 Life cycle of a solar thermal power plant.
B-1.eps
After defining the goal and scope, an inventory analysis was carried out based
on the collected and processed data. The parameter that has the most impact on
the life cycle inventory (LCI) results in this study, i.e., EBF, EPT, and CEF, was
evaluated so that problems and improvements of the system could be revealed.
The basic theoretical equations for the three environmental load profiles defined
in this study (EBF, EPT, CEF, global warming protocol [GWP] and acidification
potential [AP]) are expressed as:
LCEO
EBF =
LCOE + ∑ LCEEi (B-1)
i
∑ LCEE i
(B-2)
EPT = i
AEO − AOE
∑ LCOEE + ∑ LCEEE • CEE j
j ij
(B-3)
j i
CEF =
LCEO
where LCEO is the energy output from an energy conversion plant over its entire
life cycle; LCEEi and LCOE are the “equipment” and “operation” energies over
the life cycle of each process of the system, respectively (i represents each process,
i.e., manufacturing material and equipment, transportation, and construction);
AEO is the annual energy output; AOE is the annual operation energy of plant;
OCR for page 217
0 APPENDIX b
LCEEEij and LCOEEj are the equipment and operation energies of each kind of
energy resources, e.g., electricity, coal, and oil, over the life cycle of each process,
respectively (j represents each kind of energy resources); and CEEj is the CO2
emission per unit energy of each energy resource.
In this study, the energy input consists of the equipment and operation ener-
gies. Consequently, the denominator of the right side of Eq. B-1 represents the
energy input into the system over its entire life cycle. Equipment energy is defined
as the energy necessary for manufacturing equipment, which constitutes a system,
i.e., heliostats and power block in this study, and is composed of the “material,”
“production,” “transportation,” and “construction” energies. Material energy is
the energy necessary for refining raw materials, e.g., steel, glass, and concrete.
Production energy is the energy necessary for producing the parts of equipment,
e.g., heliostats and a plant generator. Transportation energy is the energy necessary
for transporting the equipments and construction material. Construction energy is
the energy necessary for constructing equipment workshop.
With regard to the calculation of the energy input, a process analysis, in which
the object is divided into several processes and the energies required for each
process are integrated, is adopted in this study. The following equation is used to
calculate the equipment energy over the entire life cycle of the system:
∑ LCEE = ∑ ( ME ) (B-4)
+ PEi + TEi + CEi
i i
i i
Where MEi, PEi, TEi, and CEi are the material, production, transportation, and
construction energies of each process, respectively.
On the other hand, operation energy is defined as the energy necessary for
operating a system and is composed of the fuel consumption of warming turbines
in startup and the electricity consumed in operating equipments. The operation
energy over the entire life cycle of the system is calculated on the basis of the
following equation:
LCOE = FC fuel + FCelectricity (B-5)
where FCfuel is the fuel consumption for warming turbines in startup of electric-
ity generation sets, and FCelectricity is electricity demanded in operation, which is
provided by self-produced electricity.
Global warming potential (GWP) and acid potential (AP) analysis were
performed to identify the environmental impact characteristics of solar thermal
power plant. Based on the environmental impact characteristics of solar thermal
power plant, global warming emissions such as CO2, NOx, CO, and acidification
emissions such as SO2, and NOx in the life cycle of the power plant are quantified
and analyzed. The Equivalency Factor Approach is adopted for the GWP analy-
sis in this report. Output data of listing are classified according to GWP and AP
assessment, and all kinds of values of emissions are multiplied by the Equivalency
OCR for page 217
APPENDIX b
Factor. Finally, the sum of the equivalent values is achieved as the total impact
potential. In this calculation, Equivalency Factors are adopted from research
results of the IPCC (Yang et al., 2002).
Data Listing
Data needed to perform the LCA were provided by firms investing in solar
thermal power plant and related technology research departments in China, com -
plemented with data obtained from the most up-to-date databases in the National
Bureau of Statistics of China or from existing academic literature.
At the time of performing this LCA, some data related to the weight of
materials of some parts of the power plants could not be obtained, because the
studied 300 MW solar tower power plant has not been built. Consequently, some
assumptions were made by referring to similar materials used in coal-fired power
plants of the same capacity.
Many material categories are involved in the life time of solar thermal power
plants, and the material whose weight is 5 percent less than the total material can
be neglected. Total material weights for the life time of the 300 MW solar tower
power plant are depicted in Table B-2. Life cycle inventory (LCI) of 300 MW
solar thermal power plant: (I) energy balance is depicted in Table B-3.
On all accounts by the software tool AGP, primary inputs and outputs in LCA
of 300 MW solar thermal power plant are depicted in Table B-4.
RESULTS AND DISCUSSION
Energy Balance
From Tables B-1, B-3, and B-4, the equipment and operation energies are
calculated using Eqs. B-1, B-2, B-4, and B-5, respectively, clarifying the energy
TABLE B-2 Total Material Weights of the Life Time of 300 MW Solar Tower
Power Plant (t)
Technology Steel Glass Concrete Diesel Gasoline
Solar tower power plant 203,815 37,530 42,067 262 1,127
TABLE B-3 Life Cycle Inventory (LCI) of Solar Thermal Power Plant:
(I) energy balance (tce)
Materials extraction
and production of Building
Stages equipment Transport construction Operation Total
Energy input 135,662.48 2,152.39 13,896 11,394 163,105
OCR for page 217
APPENDIX b
TABLE B-4 Life Cycle Inventory of Solar Thermal Power Plant: (II)
emissions (g/kWh)
Materials extraction
and production of Buildings
Types equipment Transport construction Operation Total
Input Steel 11.55 ----- 0.86 ---- 12.41
Glass 2.28 ---- ---- ---- 2.28
Concrete ----- ----- 2.56 ---- 2.56
Diesel ----- 0.0160 ----- ---- 0.0160
Gasoline ----- 0.0686 ----- ---- 0.0686
Output CO2 24.93 0.65 3.78 2.21 31.6
SO2 0.0370 ---- 0.0032 0.0030 0.0432
NOX 0.0051 0.0050 0.0036 0.0011 0.0148
1.26*10-4
HC ---- 0.00166 ---- 0.0018
9.91*10-4
CO ---- 0.0132 ---- 0.0142
6.29*10-4
Powder 0.0242 0.0025 0.0021 0.0293
and Soot
inputs and outputs in all processes of the system examined in this study. When
calculations are conducted, the life cycle inventory of solar thermal power plant
on the EBF is achieved as 12.38, and EPT is 1.89 years. That means the total
energy input into the system that has a life time of 25 years can be recovered for
a shorter period of 1.89 years with power generation. On the other hand, the EBF
is 12.38, which means that 12.38 times more energy is required than for the total
energy input that can be produced during the entire life cycle of the system. This
result indicates that the system examined in this study is feasible as an energy
production system.
Cumulative Energy Demand
The consumption of electricity required in the operation of solar thermal
power systems is provided by self-produced electricity. No hybrid system has
been built, and no other fossil energy is required in the operational stage except
that little fossil fuel is required in the startup of the generating set. Without taking
into account these energy expenses, from Tables B-1 and B-3, the fossil energy
required in the power plant life cycle is calculated to be 0.29 MJ/kWh for central
tower technology. Cumulative energy demand and the life cycle of solar thermal
power plants are listed in Table B-5. Results from other LCAs yield 0.14–0.16
MJ/kWh for a trough-type plant (Pehnt, 2006; Viebahn, 2004). For the central
tower technology, the cumulative energy demand was 0.17-0.41 MJ/kWh (Lechón
et al., 2008; Wang and Zhao, 2007).
OCR for page 217
APPENDIX b
The energy input into the system can be analyzed by aggregating the equip-
ment and operation energies of each process in Table B-5. Consequently, 92.6
percent of the total energy input is occupied by the equipment energy, and the
operation energy corresponds to the remaining 7.4 percent, that means, the amount
of energy required for equipment of the system is much larger than the energy
required in operation, which is illustrated in Figure B-2. In order to reduce the
total energy input, it is essential to first reduce the equipment energy by taking
such measures as developing new techniques and improving the manufacture
efficiency of raw material and production processes.
Greenhouse Gas Emissions
From Tables B-1 and B-4, the equipment and operation energies are calcu -
lated using Eqs. 3. Global warming emission CO2 produced during the life cycle
of the analyzed solar thermal power plants are calculated, and its CEF value is
around 31.6 g/kW h. Cumulative CO2 emissions in each process of the life cycle
of solar thermal power plants are listed in Table B-6. Most of them come from
the material and production stages (see Figure B-3). The Equivalency Factor
Approach is adopted to make GWP analysis in LCA of 300 MW solar tower power
plant. Emission sources such as CO2, CO, and NOx were studied, and the analysis
result is depicted in Table B-7. Values are around 32.1 g CO2 equiv/kWh. It is
similar to the values reported in the literature (see Table B-8). Values of global
warming emissions reported in the literature range from 11 g CO2 equiv/kWh to
48 g CO2 equiv/kWh for the central tower type and from 12 g CO2 equiv/kWh
to 80 g CO2 equiv/kWh for the parabolic troughs type, with the exception of the
values reported in bracket by Lechón et al. (2008) for a hybrid operation. The
emissions are higher in hybrid operation for the obvious reason of natural gas
consumption.
Acidification
From Table B-4, in this study SO2 emission value is 43.2 mg/kWh. For
acidification emissions such as SO2 and NOx, the Equivalency Factor Approach
TABLE B-5 Cumulative Energy Demand in the Life Cycle of Solar Thermal
Power Plants
Energy demand values (MJ/KWh)
Phases
Solar field 0.2394
Power block 0.0037
Buildings construction 0.0248
Transports 0.0035
Operation 0.0203
Total 0.29
OCR for page 217
4 APPENDIX b
power block
1%
construction
array
9%
82%
transpor tation
1%
operation
7%
FIGURE B-2 The percentage breakdown of energy demand in the life cycle of solar
B-2.eps
thermal power plants.
power block
1%
construction
12%
array
78% transpor tation
2%
operation
7%
FIGURE B-3 The percentage breakdown of CO2 emissions in the life cycle of solar
thermal power plants.
B-3.eps
OCR for page 217
5
APPENDIX b
TABLE B-6 CO2 Emissions in Each Process of the Life Cycle of the Solar
Thermal Power Plants
CO2 emission (g/kWh)
Phase
Solar field 24.6777
Power block 0.2514
Buildings construction 3.7845
Transports 0.6475
Operation 2.2100
Total 31.5711
TABLE B-7 GWP Analysis in LCA of 300MW Solar Tower Power Plant
Equivalency
Impact Mass quality factor Impact potential Total
(kg.kg-1) (g CO2 equiv./kWh)
types Item (kg) value (kg)
CO2 31.6 1 31.6
GWP 32.1
NOX 0.0148 320 0.4736
CO 0.0142 2 0.0284
TABLE B-8 Global Warming Emissions for Solar Thermal Power Plants
Reported in Literatures (g CO2 equiv./kW h)
Central tower Parabolic trough
Lechón et al. (2008) 17 (186) 24 (161)
Vant-Hull (1991) 11
Norton et al. (1998) 21–48 30–80
Viehban (2004) 12
is adopted to make AP analysis in LCA of 300 MW solar tower power plant. The
analysis result is depicted in Table B-9. Acidification value is 53.6 mg SO2 equiv/
kWh. Values reported in the literature are higher than the values obtained in this
study. Acidification values reported are 69.28 mg SO2 equiv/kWh (Pehnt, 2005)
for a parabolic trough plant and 621 mg SO2 equiv/kWh (Lechón et al., 2008) for
hybrid operation in solar tower power plant. The emissions are higher in the hybrid
operation for the obvious reason of natural gas consumption. In China, strict policy
to control the discharge of sulfur oxides has been established in recent years. In
response to this policy the enterprises utilize technologies to reduce the SO2 and
NOx discharge; as a result the acidification emission is greatly reduced.
OCR for page 217
6 APPENDIX b
Comparison with Coal-Fired Plants
In China, the environmental factors for a coal-fired generation system
include coal demand value 320 g ce/kWh, warming emission discharge (CO 2)
value 738 g/kWh, and NOx value 3.25 g/kWh, acidification emission (SO2)
value 9.38 g/kWh, and other emissions such as powder and soot discharge value
0.283 g/kWh from 1 kWh functional unit of 300 MW generation (Huang, 2006).
Comparison of coal-fired plants and the solar thermal power plant in energy
demand and emissions is depicted in Table B-10.
TABLE B-9 AP Analysis in LCA of 300 MW Solar Thermal Power Plants
Equivalency
Impact Mass quality factor Impact potential Total
(kg.kg-1) (g SO2 equiv./kWh)
types Item (g) value (kg)
AP SO2 0.0432 1 0.0432
0.0536
NOX 0.0148 0.70 0.0136
TABLE B-10 Comparison of a Coal-Fired Power Plant and Solar Thermal
Power Plant in Terms of Energy Demand and Emissions
Energy demand Powder and soot CO2 SO2 NOX
technology MJ(kWh) (g/kWh) (g/kWh) (g/kWh) (g/kWh)
Coal-fired > 9.37 0.283 738 9.38 3.25
Solar thermal 0.29 0.0293 31.6 0.432 0.0148
power
Conclusions
From the LCA performed for the 300 MW solar tower power plant, some
important conclusions can be drawn:
• First, this technology shows an environmental profile much better than the
current mix of technologies used to produce electricity in China.
• The cumulative energy demand of the life cycle of solar thermal power
plant is much lower than the energy produced.
• CO2 value of global warming emissions is around 31.6 g/kWh, which
is much lower than the value of 738 g/kWh for competing fossil
technologies.
• Other impacts calculated are much lower than those produced by the cur-
rent Chinese electricity generation system, and most of them are produced
in the operation of the fossil-fired plant due to the consumption of natural
gas or coal.