National Academy of Sciences | 150 Year Anniversary

Questions? Call 800-624-6242

| Items in cart [0]

The National Academies Press

PAPERBACK
price:$66.50
add to cart

Rights & Permissions

topleft topright

Progress Toward Restoring the Everglades: The Third Biennial Review - 2010 (2011)
Water Science and Technology Board (WSTB)
Board on Environmental Studies and Toxicology (BEST)

Citation Manager

. "Appendix D: Regulation Schedule for WCA-3A." Progress Toward Restoring the Everglades: The Third Biennial Review - 2010. Washington, DC: The National Academies Press, 2011.

Please select a format:

BibTeX EndNote RefMan


Page
302
bottomleft bottomright

The following HTML text is provided to enhance online readability. Many aspects of typography translate only awkwardly to HTML. Please use the page image as the authoritative form to ensure accuracy.


Progress Toward Restoring the Everglades: The Third Biennial Review - 2010

TABLE D-1 WCA-3A Regulation Schedule Structure Discharge Rules

WCA-3A Regulation Schedule Structure Discharge Rules

ZONE

S-12

S-333

S-151

S-343A&B, S-344

Zone A

Open full when permitted subject to conditions of note 1 below Zone A is the flood storage pool for WCA-3A. water levels may require the opening of S-12C, S-12B, and/or S-12A during the period 1 Nov-15 July to avoid an unacceptable risk: of failure of WCA-3A levees and structures.

See note 2 and 3 below. Make maximum allowable discharge subject to downstream conditions.

See note below. Maximum allowable discharge when WCA-3B stage is below 8.5 ft-NGVD.

No discharges from 1 Nov- 15 Jul, unless the FWS has determined that nesting for the CSSS sub-population A has ended. If non-nesting season, then make maximum allowable discharges if downstream conditions permit

Zone B

Discharge 45% of the computed flow for Shark River Slough. From 1 Jun - 15 July, discharges are limited to S-12D, unless the FWS has determined that nesting for the CSSS sub-population A has ended. If S-333 is closed or discharging less than 28% of computed flow for Shark River Slough, S-12 must discharge at least 73% and up to 100% of the computed flow for Shark River Slough, if capacity is available.

See note 2 and 3 below. Discbarge 55% of the computed flow for Shark River Slough when permitted by downstream conditions.

See note 3 below. Maximum allowable discharge when WCA-3B stage is below 8.5 ft-NGVD.

Closed from 1 Jun through 15 July, or until the FWS has determined that nesting for the CSSS sub-population A has ended. Otherwise, normally closed in this zone, unless water is needed for environmental reasons.

Zone C

Discharge 45% of the computed flow for Shark River Slough amount. If S-333 is closed or reduced in flow. S-12 can discharge- up to 100% of the computed flow for Shark River Slough, if desired by ENP, subject to conditions in note 1 below.

See note 2 and 3 below. Discharge 55% of the computed flow for Shark River Slough when permitted by downstream conditions.

See note 3 below. Maximum allowable discharge when WCA-3B stage is below 8.5 ft-NGVD.

No discharges from 1 Nov- 1 Jun. unless the FWS has determined that nesting for the CSSS sub-population A has ended, then make maximum allowable discharges if no downstream problems.

Zone D

Discharge 45% of the computed flow for Shark River Slough. From 1 Jun - 15 July, discharges are limited to S-12D, unless the FWS has determined that nesting for the CSSS sub-population A has ended. If S-333 is closed or discharging less than 28% of computed flow for Shark River Slough, S-12 must discharge at least 73% and up to 100% of the computed flow for Shark River Slough, if capacity is available.

See note 2 and 3 below. Discharge 55% of the computed flow for Shark River Slough when permitted by downstream conditions.

See note 3 below.

Closed from 1 Jun through 15 July, or until the FWS has determined that nesting for the CSSS sub-population A has ended, S-343A&B, S-344. Otherwise, normally closed in this zone, unless water is needed for environmental reasons.

Zone E

Discharge 45% of the computed flow for Shark River Slough subject to note 1 below.

The L-67A Borrow Canal stage should not be drawn down below 7.5 FT-NGVD unless water is supplied from another source.

See note 2 and 3 below. Discharge 56% of the computed flow for Shark River Slough when permitted by downstream conditions.

The L-67A Borrow Canal stage should not be drawn down below 7.5 FT-NGVD unless water is supplied from another source.

See note 3 below.

The L-67A Borrow Canal stage should not be drawn down below 7.5 FT-NGVD unless water is supplied from another source.

Closed, unless water is needed for environmental reasons.

The L-67A Borrow Canal stage should not be drawn down below 7.5 FT-NGVD unless water is supplied from another source.

Zone El

Discharge 45% of the computed flow for Shark River Slough. From 1 Feb - 15 July, discharges are limited to S-12D, unless the FWS has determined that nesting for the CSSS sub-population A has ended. Revert to Zone E rules if the FWS has determined that nesting for the CSSS sub-population A has ended, or if the headwater at S-333 falls below 8.25 ft-NGVD.

See note 2 and 3 below. Make maximum practicable releases at S-142, S-151, S-31, S-337, S-335, S-333, S-355A&B and S-334. subject to downstream constraints. If the headWatar at S-333 falls below 8.25 ft-NGVD, then revert to Zone E rules.

Closed during period 1 Nov through 15 July or until the FWS has determined that nesting for the CSSS sub-population A has ended.

If the headwater at S-333 falls below 8.25 ft-NGVD, then revert to Zone E rules.

Notes:

1. For the S-12 Structure in Zone A, C, E, and E1: From 1 Nov - 31 Dec. discharges are limited to S-12B, C, and/or D. From 1 Jan — 31 Jan, discharges are limited to S-12C and/or D. From 1 Feb - 15 July, discharges are limited to S-12D unless the FWS has determined that nesting for the CSSS sub-population A has ended.

2.If G-3273 is above 6.8 ft-NGVD. no discharges to Northeast Shark River Slough are permitted. However S-333 may discharge up to maximum capacity provided that water can be discharge via S-334 to the South Dade Conveyance system subject to available capacity.

3. Make water supply discharges to the East Coast and ENP-South Dade Conveyance System as needed.