National Academies Press: OpenBook

Steel Bridge Erection Practices (2005)

Chapter: References

« Previous: Chapter Seven - Conclusions
Page 19
Suggested Citation:"References." National Academies of Sciences, Engineering, and Medicine. 2005. Steel Bridge Erection Practices. Washington, DC: The National Academies Press. doi: 10.17226/13825.
×
Page 19

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

20 1. AASHTO LRFD Bridge Design Specifications, 3rd ed., American Association of State Highway and Transporta- tion Officials, Washington, D.C., 2004. 2. Steel Bridge Fabrication Guide Specification, S2.1-2002, American Association of State Highway and Transpor- tation Officials, Washington, D.C., and National Steel Bridge Alliance, Chicago, Ill., 31 pp. 3. AASHTO LRFD Bridge Construction Specifications, 2nd ed., American Association of State Highway and Trans- portation Officials, Washington, D.C., 2004. 4. Swett, G.D., J.F. Stanton, and P.S. Dunston, “Methods for Controlling Stresses and Distortions in Stage-Constructed Steel Bridges,” Transportation Research Record 1712, Transportation Research Board, National Research Coun- cil, Washington, D.C., 2003, pp. 164–173. REFERENCES

Next: Appendix A - Survey Questionnaire »
Steel Bridge Erection Practices Get This Book
×
 Steel Bridge Erection Practices
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s National Cooperative Highway Research Program (NCHRP) Synthesis 345: Steel Bridge Erection Practices examines steel bridge erection practices for I-girder, tub-girder, and box-girder bridges; particularly curved, skewed, and staged structures. The report focuses on the impact of design and analysis practices on erection; methods used to predict erection deflections as a function of bridge type and complexity; shop-assembly practices and alternate methods of ensuring properly assembled geometry; stability issues; field connection practices; examples of structures in which erection practices have caused problems; owner requirements for erection procedures, implementation of requirements, and the impact of procedures on the quality of erection; and current and proposed research.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!