Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 119
119
References
AASHTO (1998). AASHTO LRFD Bridge Design Specifications, 2nd ed., Azizinamini, A., Pavel, R., Hatfield, E., and Gosh, S.K. (1999a). "Behav-
including 1999, 2000, and 2001 interim revisions. AASHTO, ior of Spliced Reinforcing Bars Embedded in High-Strength
Washington, DC. Concrete." Structural Journal of the American Concrete Institute,
AASHTO (2004). AASHTO LRFD Bridge Design Specifications, 3rd ed., Vol. 96, No. 5, September-October, 826835.
with 2005 and 2006 interim revisions. AASHTO, Washington, DC. Azizinamini, A., Stark, M., Roller, J.J., and Gosh, S.K. (1993). "Bond
AASHTO (2007). AASHTO LRFD Bridge Design Specifications, 4th ed., Performance of Reinforcing Bars Embedded in High-Strength
Customary U.S. Units. AASHTO, Washington, DC. Concrete." Structural Journal of the American Concrete Institute,
Abrishami, H. H. and Mitchell, D. (1993). "Bond Characteristics of Vol. 90, No. 5, September-October, 554561.
Pretensioned Strand." ACI Materials Journal, Vol. 90, No. 3, May- Barnes, R.W. and Burns, N.H. (2000). "Anchorage Behavior of 15.2
June, 228235. mm (0.6 in) Prestressing Strand in High Strength Concrete."
ACI (1963). Building Code Requirements for Reinforced Concrete Presentation at PCI/FHWA/FIB International Symposium on
(ACI 318-63). American Concrete Institute, Redford Station, High Performance Concrete, September 2527, Orlando, FL,
Detroit, MI. 484493.
ACI (1989). Building Code Requirements for Reinforced Concrete (ACI Buckner, C.D. (1994). An Analysis of Transfer and Development
318-89) and Commentary (ACI 318R-89). American Concrete Lengths for Pretensioned Concrete Structures, FHWA-RD-94-049.
Institute, Farmington Hills, MI. FHWA, U.S. DOT, Washington DC.
ACI (1995). Building Code Requirements for Structural Concrete (ACI Choi, O.C., Hadje-Ghaffari, H., Darwin, D., and McCabe S.L. (1990).
318-95) and Commentary (ACI 318R-95). American Concrete "Bond of Epoxy-Coated Reinforcement to Concrete: Bar Parame-
Institute, Farmington Hills, MI. ters." SM Report No. 25, University of Kansas Center for Research,
ACI (1999). Building Code Requirements for Structural Concrete (ACI Lawrence, KS.
318-99) and Commentary (ACI 318R-99). American Concrete Choi, O.C., Hadje-Ghaffari, H., Darwin, D., and McCabe, S.L. (1991).
Institute, Farmington Hills, MI. "Bond of Epoxy-Coated Reinforcement: Bar Parameters." ACI
ACI (2002). Building Code Requirements for Structural Concrete (ACI Materials Journal, Vol. 88, No. 2, 207217.
318-02) and Commentary (318R-02). American Concrete Institute, Clark, A.P. (1946). "Comparative Bond Efficiency of Deformed Con-
Farmington Hills, MI. crete Reinforcing Bars." ACI Journal Proceedings, Vol. 43, No. 4,
ACI (2005), ACI 318-05: Building Code Requirements for Structural December, 381400.
Concrete and Commentary, American Concrete Institute, Farming- Cleary, D.B. and Ramirez, J.A. (1993). "Epoxy-Coated Reinforcement
ton Hills, MI. Under Repeated Loading." ACI Structural Journal, Vol. 90, No.4,
ACI Committee 408 (1964). "A Guide for the Determination of Bond July-August, 451458.
Strength in Beam Specimens." Journal of the American Concrete Cooke, D.E., Shing, P.B., Frangopol, D.M. (1998), "Colorado Study on
Institute, Vol. 61, No. 2, February, 129135. Transfer and Development of Prestressing Strand in High Perfor-
ACI Committee 408 (1966). "Bond Stress--The State of the Art." ACI mance Concrete Box Girders," University of Colorado Research
Journal Proceedings, Vol. 63, No. 11, November, 11611188. Series No. CU/SR-97/4, April, 168 pp.
ACI Committee 408 (1970). "Opportunities in Bond Research." ACI Cousins, T.E., Johnston, D.W., and Zia, P. (1990). "Transfer and Devel-
Journal Proceedings, Vol. 67, No. 11, November, 857867. opment Length of Epoxy-Coated and Uncoated Prestressing
ACI Committee 408 (2003). "Bond and Development of Straight Rein- Strands." PCI Journal, Vol. 35, No. 3, July-August, 92106.
forcing Bars in Tension (408R-03). Technical Documents, Ameri- Cousins, T.E., Stallings, J.M, and Simmons, M.B (1993). "Effect of
can Concrete Institute, Farmington Hills, MI. Strand Spacing on Development of Prestressing Strands," Research
Azizinamini, A., Darwin, D., Eligehausen, R., Pavel, R., and Gosh, S.K. Report, Alaska Department of Transportation and Public Facilities,
(1999b). "Proposed Modifications to ACI 318-95 Tension Devel- August 1993.
opment and Lap Splice for High-Strength Concrete." Structural Darwin, D. and Graham, E.K. (1993a). "Effect of Deformation Height
Journal of the American Concrete Institute, Vol. 96, No. 6, November- and Spacing on Bond Strength of Reinforcing Bars." SL Report
December, 922926. 93-1, University of Kansas Center for Research, Lawrence, KS.
OCR for page 120
120
Darwin, D. and Graham, E. K. (1993b). "Effect of Deformation Height Hester, C. J., Salamizavaregh, S., Darwin, D., and McCabe, S.L. (1993).
and Spacing on Bond Strength of Reinforcing Bars." ACI Structural "Bond of Epoxy-Coated Reinforcement: Splices." ACI Structural
Journal, November-December, Vol. 90, No. 6, 646657. Journal, Vol. 90, No. 1, 89102.
Darwin, D., Tholen, M.L., Idun, E.K., and Zuo, J. (1996). "Splice Hyett, A.J., Dube, S., and Bawden, W.F. (1994). "Laboratory Bond
Strength of High Relative Rib Area Reinforcing Bars." ACI Struc- Strength Testing of 0.6" 7-Wire Strand from 7 Different Manufac-
tural Journal, Vol. 93, No. 1, January-February, 95107. turers," Final Report. Department of Mining Engineering, Queen's
Deatherage, J.H., Burdette, E.G., and Chew, C.K. (1994). "Development University, Kingston, Ontario, November.
Length and Lateral Spacing Requirements of Prestressing Strand Jacob J. (1998). "Improved Shear Reinforcement Details for the End
for Prestressed Concrete Bridge Girders." PCI Journal, Vol. 39, Regions of Prestressed Concrete Bridge Girders," Masters Thesis.
No. 1, January-February, 7083. University of Oklahoma, Norman, OK.
DeVries, R.A., Moehle, J.P., and Hester, W., 1991. "Lap Splice of Plain Jirsa, J.O. and Breen, J.E. (1981). Influence of Casting Position and Shear
and Epoxy-Coated Reinforcements: An Experimental Study Con- on Development and Splice Length--Design Recommendation,
sidering Concrete Strength, Casting Position, and Anti-Bleeding Research Report No. 242-3F. Center for Transportation Research,
Additives," UCB/SEMM-91/02 Structural Engineering Mechanics The University of Texas at Austin, Austin, TX.
and Materials, University of California, Berkeley, CA, January. Johnston, D.W. and Zia, P. (1982). Bond Characteristics of Epoxy-Coated
Ferguson, P.M. and Thompson, J.N. (1965). "Development Length of Reinforcing Bars, FHWA-NC-82-002. FHWA, U.S. DOT, Washing-
High Strength Reinforcing Bars." ACI Journal Proceedings Vol. 62, ton, DC.
No. 1, January, 7194. Kaar, P.H., LaFraugh, R.W., and Mass, M.A. (1963). "Influence of
Furlong, R.W., Fenves, G.L., and Kasl, E.P. (1991). "Welded Structural Concrete Strength on Strand Transfer Length." PCI Journal, Vol. 8,
Wire Reinforcement for Columns." ACI Structural Journal, Vol. 88, No. 5, October, 4767.
No. 5, September-October, 585591. Kaar, P.H. and Magura, D.D. (1965). "Effect of Strand Blanketing on
Griezic, A., Cook, W.D., and Mitchell, D. (1994). "Tests to Determine Performance of Pretensioned Girders." Portland Cement Association
Performance of Deformed Welded-Wire Fabric Stirrups." ACI Research and Development Laboratory Bulletin, December, 2435.
Structural Journal, Vol. 91, No. 2, March-April, 211220. Kahn, L.F., Dill, J.C., and Reutlinger, C.G. (2002). "Transfer and Develop-
Gross, S.P. and Burns, N.H. (1995). Research Report 580-2: Transfer and ment Length of 15-mm Strand in High Performance Concrete Gird-
Development Length of 15.2 mm (0.6 in) Diameter Prestressing ers." Journal of Structural Engineering, Vol.128, No.7, July, 913921.
Strand in High Performance Concrete--Results of the Hoblitzell- Kaufman, M.K. and Ramirez, J.A. (1988). "Reevaluation of the Ultimate
Buckner Beam Tests. The University of Texas at Austin, Austin, TX. Shear Behavior of High Strength Concrete Prestressed I-Beams."
Grundhoffer, T., Menis, P.A., French, C.W., and Leon, R. (1998). ACI Structural Journal, Vol. 85, No. 3, May-June, 295303.
"Bond of Epoxy-Coated Reinforcement in Normal and High- Leonhardt, F. and Teichen, K. (1972). "Druck-Stosse von Be-
Strength Concrete." ACI Special Publication 180-2, 261298. wehrungsstaben." Deutscher Ausschuss fur Stahlbeton Bulletin No.
Guimaraes, G.N., Kreger, M.E., and Jirsa, J.O. (1992). "Evaluation of 222, W. Ernst and Sohn, Berlin, FRG, 153.
Joint-Shear Provisions for Interior Beam-Column-Slab Connec- Logan, D.R. (1997). "Acceptance Criteria for the Bond Quality of
tions Using High Strength Materials." ACI Structural Journal, Vol. Strand for Pretensioned Prestressed Concrete Applications." PCI
89, No. 1, January-February, 8998. Journal, Vol.42, No.2, March-April, 5290.
Hadje-Ghaffari, H., Darwin, D., and McCabe, S.L. (1991). "Effects of Maeda, M., Otani, S., and Aoyama, H. (1991). "Bond Splitting Strength
Epoxy-Coating on the Bond of Reinforcing Steel to Concrete." SM in Reinforced Concrete Members." Transactions of the Japan
Report No. 28, University of Kansas Center for Research, Inc., Concrete Institute, Vol. 13, 581588.
Lawrence, KA. Mansur, M.A., Lee, C.K., and Lee, S.L. (1987). "Deformed Wire Fabric
Hadje-Ghaffari, H., Choi, O.C., Darwin, D., and McCabe, S.L. (1994). as Shear Reinforcement in Concrete Beams." ACI Structural Jour-
"Bond of Epoxy-Coated Reinforcement to Concrete: Cover, Cast- nal, Vol. 84, No. 5, September-October, 392399.
ing Position, Slump, and Consolidation." ACI Structural Journal, Marques, J.L. and Jirsa, J.O. (1975). "A Study of Hooked Bar Anchor-
Vol. 90, No. 1, January-February, 5968. ages in Beam-Column Joints." Journal of the American Concrete
Hamad, B.S., and Itani, M.S. (1998). "Bond Strength of Reinforcement Institute, Vol. 72, No. 5, May, 198209.
in High-Performance Concrete: The Role of Silica Fume, Casing Mathey, R.G. and Clifton, J.R. (1976). "Bond of Coated Reinforcing
Position, and Superplasticizer Dosage." ACI Materials Journal, Vol. Bars in Concrete." ASCE Journal of the Structural Division, Vol. 102,
95, No. 5, September-October, 499511. No. ST1, 215229.
Hamad, B.S., Jirsa, J.O., and D'Abreu de Paulo, N. (1993). "Anchorage Meyer, K.F. (2002). "Transfer and Development Length of 0.6-inch
Strength of Epoxy-Coated Hooked Bars." ACI Structural Journal, Diameter Strand in High Strength Light Weight Concrete." Ph.D.
Vol. 90, No. 2, March-April, 210217. dissertation, Georgia Institute of Technology, Georgia.
Hamad, B.S., and Jirsa, J.O. (1993). "Strength of Epoxy-Coated Rein- Mitchell, D., Cook, W.D., Khan, A.A., and Tham, T. (1993). "Influence
forcing Bar Splices Confined with Transverse Reinforcement." ACI of High Strength Concrete on Transfer and Development Length of
Structural Journal, Vol. 90, No.1, 7788. Pretensioning Strand." PCI Journal, Vol. 38, No. 3, May-June, 5266.
Hanson, N.W., and Kaar, P.H. (1959). "Flexural Bond Tests of Preten- Nilson, A.H. (1997). Design of Concrete Structures, 12th ed., McGraw-
sioned Prestressed Beams." ACI Journal, Vol.55, No.7, January, Hill, New York, NY.
783802. Orangun, C.O.; Jirsa, J.O.; and Breen, J.E. (1977). "A Reevaluation of
Hawkins, N.M. and Kuchma, D.A. (2002). "Application of the LRFD Test Data on Development Length and Splices," ACI Journal
Bridge Design Specifications to High-Strength Structural Concrete: Proceedings, Vol. 74, No. 3, 114122.
Shear Provisions, Phase 1," NCHRP Project 12-56 Interim Report, Ozyildirim, C. and Gomez, J.P. (1999). High-Performance Concrete in a
Transportation Research Board of the National Academies, Wash- Bridge in Richlands, Virginia. Virginia Transportation Research
ington, DC, February. Council, Charlottesville, VA.
OCR for page 121
121
Pfister, J.P. and Mattock, A.H. (1963). "High Strength Bars as Concrete Russell, B.W., and Paulsgrove, G.A. (1999a). "NASP Strand Bond
Reinforcement, Part 5. Lapped Splices in Concentrically Loaded Testing Round One Pull-Out Tests and Friction Bond Tests of
Columns." Journal of the PCA Research and Development Laborato- Untensioned Strand," Final Report 99-03. The University of Okla-
ries, Vol. 5, No. 2, May, 2740. homa, Fears Structural Engineering Laboratory, Norman, OK.
Pincheira, J. A., Rizkalla, S.H., Attiogbe, E.K. (1989). "Performance of Russell, B.W., and Paulsgrove, G.A. (1999b). "Assessing Repeatability
Welded Wire Fabric as Shear Reinforcement under Cyclic Load- and Reproducibility of the Moustafa Test, the PTI Bond Test and
ing." ACI Structural Journal, Vol. 86, No. 6, November-December, the NASP Bond Test," Final Report 99-04. The University of Okla-
728735. homa, Fears Structural Engineering Laboratory, Norman, OK.
Rabbat, B.G., Kaar, P.H., Russell, H.G., and Bruce, R.N. (1979). "Fa- Russell, H.G., Miller, R.A., Ozyildirim, H.C., and Tadros, M. K. (2006).
tigue Tests of Pretensioned Girders with Blanketed and Draped Compilation and Evaluation of Results from High-Performance Con-
Strands." PCI Journal, Vol. 24, No. 4, July-August, 88114. crete Bridge Projects, Volume I: Final Report, FHWA-HRT-05-056.
Roberts-Wollmann, C., Cousins, T., Gomez, J., and Ozyildirim, C. FHWA, U.S. DOT.
(2000). "Use of High Performance Concrete in a Bridge Structure Sakurada, T., Morohashi, N., and Tanaka, R. (1993). "Effect of Trans-
in Virginia." Presented at the PCI/FHWA/FIB International Sym- verse Reinforcement on Bond Splitting Strength of Lap Splices."
posium on High Performance Concrete, September 2527, Or- Transactions of the Japan Concrete Institute, Vol. 15, 573580.
lando, FL. Shahawy, M.A., Issa, M., and Batchelor, B. (1992). "Strand Transfer
Rose, D.R. and Russell, B.W. (1997). "Investigation of Standardized Lengths in Full Scale AASHTO Prestressed Concrete Girders." PCI
Tests to Measure the Bond Performance of Prestressing Strand." Journal, Vol. 37, No. 3, May-June, 8496.
PCI Journal, Vol. 42, No. 4, July-August, 5680. Shing, P.B., Frangopol, D.M., McMullen, M.L., Hutter, W., Cooke,
Russell B.W. (1992). "Design Guidelines for Transfer, Development, D.E., and Leonard, M.A. (2000). "Strand Development and Trans-
and Debonding of Large Diameter Seven Wire Strands in Preten- fer Length Tests on High Performance Concrete Box Girders." PCI
sioned Concrete," Ph.D. dissertation, University of Texas at Austin, Journal, Vol. 45, No. 5, September-October, 96109.
Austin, TX. Tabatabai, H. and Dickson, T.J. (1993). "The History of the Preten-
Russell, B.W. (1994). "Impact of High Strength Concrete on the Design sioned Strand Development Length Equation." PCI Journal,
and Construction of Pretensioned Girder Bridges." PCI Journal, Vol.38, No. 6, November-December, 6475.
Vol. 39, No. 4, 1994, 7689. Tessema Eden. (2006). "The Effect of High Strength Concrete on Bond-
Russell, B.W., and Brown, M.D. (2004). "Evaluation of Test Methods in ability of Prestressing Strands." Masters Thesis, Oklahoma State
Assessing Bond Quality of Prestressing Strands," Final Report, University, Stillwater, OK.
NASP Round III Strand Bond Testing. Oklahoma State University, Treece, R.A. and Jirsa, J.O. (1989). "Bond Strength of Epoxy-Coated
Stillwater, OK, August. Reinforcing Bars." ACI Materials Journal, Vol. 86, No. 2, March-
Russell, B.W., and Burns, N.H. (1993). Design Guidelines for Transfer, April, 167174.
Development and Debonding of Large Diameter Seven Wire Strands Xuan, X., Rizkalla, S., Maruyama, K. (1988). "Effectiveness of Welded
in Pretensioned Concrete Girders. Report No. 1210-5F. Center for Wire Fabric as Shear Reinforcement in Pretensioned Prestressed
Transportation Research, The University of Texas at Austin. Concrete T-Beams." ACI Structural Journal, Vol. 85, No. 4, July-
Russell, B.W., and Burns, N.H. (1994). "Fatigue Tests on Prestressed August, 429436.
Concrete Beams Made with Debonded Strands." PCI Journal, Vol. Zhongguo, (J.) M., Tadros, M.K., Baishya, M. (2000). "Shear Behavior
39, No. 6, 99106. of Pretensioned High-Strength Concrete Bridge I-Girders." ACI
Russell, B.W., and Burns, N.H. (1996). "Measured Transfer Lengths of Structural Journal, Vol. 97, No. 1, January-February, 185192.
0.5 in. and 0.6 in. Strands in Pretensioned Concrete." PCI Journal, Zia, P. and Moustafa, T. (1977). "Development Length of Prestressing
Vol.41, No.5, September-October, 4463. Strands." PCI Journal, Vol. 22, No. 5, 5465.
Russell, B.W., and Burns, N.H. (1997). "Measurement of Transfer Zuo, J. and Darwin, D. (1998). "Bond Strength of High Relative Rib
Lengths in Pretensioned Concrete Elements." Journal of Structural Area Reinforcing Bars." SM Report, No. 46, University of Kansas
Engineering, Vol.123, No.5, May, 541549. Center for Research, Lawrence, KA.
Russell, B.W., Burns, N.H., ZumBrunnen, L.G. (1994). "Predicting the Zuo, J. and Darwin, D. (2000). "Splice Strength of Conventional and
Bond Behavior of Prestressed Concrete Beams Containing High Relative Rib Area Bars in Normal and High Strength Con-
Debonded Strands." PCI Journal, Vol. 39, No. 5, 6077. crete." ACI Structural Journal, Vol. 97, No.4, July-Aug., 630641.