Click for next page ( 123


The National Academies | 500 Fifth St. N.W. | Washington, D.C. 20001
Copyright © National Academy of Sciences. All rights reserved.
Terms of Use and Privacy Statement



Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.

OCR for page 122
122 APPENDICES Appendix A of the contractor's final report for NCHRP Appendix C: Rectangular Beam Summaries--Strand D Project 17-25 contained the figures and tables for the report, Appendix D: Rectangular Beam Summaries--Strands A&B and Appendix B contained the report reference list. In this Appendix E: Rectangular Beam Summaries--Strand A publication, these materials have been incorporated into the (0.6 in.) text of the report. Appendix F: I-Beam Summaries--0.5-in. Strand Appendices C through I of the contractor's final report are Appendix G: I-Beam Summaries--0.6-in. Strand available on the TRB website at http://trb.org/news/blurb_ Appendix H: AASHTO Mxxx--Standard Test Method for detail.asp?id=9210. Titles of Appendices C through I are the the Bond of Prestressing Strands following: Appendix I: NASP Test Protocols