Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
86 3D/International, Inc. (undated). CM at Risk. http://www.3di.com/toolbox/cmatrisk.pdf (accessed December 3, 2008). Adrem, A., D. Schneiderbaur, E. Meyer, and F. Majdalani (2006). Managing Airports Construction Projects: Pro- viding an Efficient Management Framework for Operators. Booz, Allen, & Hamilton Inc., McLean, VA. Airports Council International-North America (ACI-NA), Airport Consultants Council (ACC) and the Associated General Contractors of America (AGC) (2006). Airport Ownersâ Guide to Project Delivery Systems. ACI-NA, ACC, and AGC. Allen, J. and A. Touran (2005). âRisk Analysis in Transit Projects.â AACE International Transactions (CD-ROM), AACE, Morgantown, WV, 9.1â9.7. Allen, L. N., D. D. Gransberg, and K. R. Molenaar (2002). âPartnering Successful Design-Build Contracts in the Naval Facilities Engineering Command Southwest Division.â The Military Engineer, Vol. 94, No. 616, 47â48. AASHTO (2008). AASHTO Guide for Design-Build Procurement. AASHTO, Washington, DC. American Institute of Architects (AIA) (2005). Construction Manager at-Risk State Statute Compendium. AIA Government Affairs, AIA, Washington, DC, 125â129. American Institute of Architects (AIA), California Council (1996). Handbook on Project Delivery. California Coun- cil, AIA, Sacramento, CA. Associated General Contractors of America (AGC) (2004). Project Delivery Systems for Construction. AGC, Arlington, VA. Barnstable Municipal Airport (2007). âMinutes of the Special Session: Monday, March 5, 2007.â http://town. barnstable.ma.us/Airport2/AirportCommission/Minutes/2007/MinutesComSpec%2003-05-07.pdf (accessed March 20, 2008). Beard, J., M. Loulakis, and E. Wundram (2001). Design-Build: Planning Through Development. RR Donnelley, Chicago, IL. Bearup, W., M. Kenig, and J. OâDonnell (2007). âAlternative Delivery Methods, a Primer.â Proceedings. ACI-NA Project Delivery Summit II, Airport Board Members and Commissioners Annual Conference, Airports Council International-North America, Chicago, IL. Bechara, C. (2002). âLogan Airport Terminal A Replacement.â Airport Development: Creating Vision, Building RealityâPB Network, Issue 54, Vol. 17, No. 4 Parsons Brinckerhoff (online journal). http://www.pbworld. com/news_events/publications/network/issue_54/54_20_BecharaC_LoganTerminal.asp. Construction Industry Institute (CII) (2003). âOwnerâs Tool for Project Delivery and Contract Strategy Selec- tion.â Research Summary RS 165-1, CII, Austin, TX. Construction Industry Institute (CII) (1997). âProject Delivery Systems: CM at Risk, Design-Build, Design-Bid- Build.â Research Summary RS 133-1, CII, Austin, TX. Corey, K. W. (2005). âDFW APMâInnovative Solutions to Success.â Automated People Movers 2005: Moving to the MainstreamâProceedings of the 10th International Conference on Automated People Movers (May 1â4 2005, Orlando, FL). American Society of Civil Engineers, Reston, VA, 35â48. Cornell, S. (2007). âRisk Transfer or Mitigation: Which Will It Be? An Alternate Project Delivery Primer & Pro- posal.â Airport Consulting, Airports Consultants Council, Fall, 1. Debella, D. C. and R. Ries (2006). âConstruction Delivery Systems: A Comparative Analysis of Their Performance Within School Districts.â Journal of Construction Engineering and Management, Vol. 132, No. 11, 1131â1138. El Wardani, M., J. Messner, and M. Horman (2006). âComparing Procurement Methods for Design-Build Proj- ects.â Journal of Construction Engineering and Management, Vol. 132, No. 3, 230â238. FAA (2005). Airport Improvement Program (AIP) HandbookâOrder 5100.38C. FAA, U.S. DOT, Washington, DC. http://www.faa.gov/airports/aip/aip_handbook/. A P P E N D I X A References
FHWA (2006). Design-Build Effectiveness StudyâAs Required by TEA-21 Section 1307(f): Final Report. FHWA, U.S. DOT, Washington, DC. http://www.fhwa.dot.gov/reports/designbuild/designbuild0.htm (accessed March 20, 2008). Florkowski, J. (2007a). âGreen Elements Added to LAXâs Tom Bradley Terminal Refurbishment Project.â Cali- fornia Construction, November. http://california.construction.com/features/archive/0711_Feature1.asp (accessed March 27, 2008). Florkowski, J. (2007b). âTerminal Improvement Project at SJC Staying on Schedule.â California Construction, November. http://california.construction.com/features/archive/0711_Feature1.asp (accessed January 26, 2008). FMI/CMAA (Undated). Sixth Annual Survey of Owners. http://cmaanet.org/user_images/owners_survey_6.pdf (accessed May 2, 2008). Garvin, M. (2003). âRole of Project Delivery Systems in Infrastructure Improvement.â In Keith R. Molenaar and Paul S. Chinowsky, Eds., Winds of Change: Integration and Innovation in ConstructionâProceedings of Con- struction Research Congress, March 19â21, 2003, Honolulu, HI (CD-ROM). ASCE, Reston, VA. General Services Administration (2008). The Catalog of Federal Domestic Assistance (CFDA). U.S. Government Printing Office, Washington, DC. http://www.cfda.gov (accessed March 27, 2008). Gordon & Rees LLP (2005). âThe Basics of Design Build.â Construction Group Newsletter, April, Gordon & Rees LLP, San Francisco, CA. Gordon, C. M. (1994). âChoosing Appropriate Construction Contracting Method.â Journal of Construction Engineering and Management, Vol. 120, No. 1, 196â210. Graham, P. (1997). âEvaluation of Design-Build Practice in Colorado IR (CX) 70-4(143).â Colorado Depart- ment of Transportation, Denver, CO. Gransberg, D. D. and K. R. Molenaar (2004). âAnalysis of Ownerâs Design and Construction Quality Manage- ment Approaches in Design/Build Projects.â Journal of Management in Engineering, Vol. 20, No. 4, 162â169. Gransberg, D. D. and K. R. Molenaar (2007). The Impacts of Design-Build on the Public Workforce (Research Paper 07-01). University of Southern California Keston Institute for Public Finance and Infrastructure Pol- icy, University of Southern California, Los Angeles, CA. Gransberg, D. D., G. M. Badillo-Kwiatkowski, and K. R. Molenaar (2003). âProject Delivery Comparison Using Performance Metrics.â AACE International Transactions (CD-ROM), AACE, Morgantown, WV. Halpin, D. W. (2006). Construction Management (3rd ed.). John Wiley and Sons, Inc., New York, NY. Harrington-Hughes, K. (2002). TCRP Research Results Digest 53: International Transit Studies Program Report on the Spring 2001 MissionâDesign-Build Transit Infrastructure Projects in Asia and Australia. Transporta- tion Research Board of the National Academies, Washington, DC. Ibbs, C. W., Y. Kwak, and A. Odabasi (2003). âProject Delivery System and Project Change: A Quantitative Analysis.â Journal of Construction Engineering and Management, Vol. 129, No. 4, 382â387. Irwin, D. (2003). âDeveloping the Design and Construction Contracting Plan for a Major Light Rail Extension Proj- ect.â Transportation Research Circular E-C058: The 9th Annual National Light Rail ConferenceâExperience, Economics, and EvolutionâFrom Starter Lines to Growing Systems. Transportation Research Board of the National Academies, Washington, DC, 557â575. http://onlinepubs.trb.org/Onlinepubs/circulars/ec058/ec058. pdf. Kessler, F. (2005). âManaging Your Money: Project Delivery Methods.â MassTransit, April 2005, 26â39. http://www.nossaman.com/showarticle.aspx?show=913 (accessed March 20, 2007). Konchar, M. and V. Sanvido (1998). âComparison of U.S. Project Delivery Systems.â Journal of Construction Engineering and Management, Vol. 124, No. 6, 435â444. Kuhn, S. (2007). âPreconstruction Services: Add Value with More Than Just Estimating.â Construction Business Owner.com, February 2007. http://www.constructionbusinessowner.com/topics/accounting-and-finance/ preconstruction-services-add-value-with-more-than-just-estimating.html (accessed August 1, 2008). Kumaraswamy, M. M. and S. M. Dissanayaka (1996). âProcurement by Objectives.â Journal of Construction Pro- curement, Vol. 2, No. 2, 38â51. Loulakis, M. C. (2005). Construction Project Delivery Systems: Evaluating the Ownerâs Alternatives (CD-ROM). A/E/C Training Technologies, Reston, VA. Loulakis, M. C. (2003). Design-Build for the Public Sector. Aspen Publishers, New York, NY. Loulakis, M. C. (2000). Project Delivery Systems: Evaluating Ownerâs Alternatives. A/E/C Training Technologies, Reston, VA. Mahdi, I. M. and K. Alreshaid (2005). âDecision Support System for Selecting the Proper Project Delivery Method Using Analytical Hierarchy Process.â International Journal of Project Management, Vol. 23, No. 7, 564â572. Merkel, J. and A. Cho (2003). âFor Airport Designers and Architects, the Future is at the Gate.â Engineering News Record, Vol. 251, No. 24, 36â38, 40. Miller, G. A. (1956). âThe Magic Number 7, Plus or Minus 2: Some Limitations on Our Capacity for Processing Information.â Psychological Review, Vol. 63, No. 2, 81â97. Appendix A: References 87
Minchin, E., K. Thakkar, and R. Ellis (2007). âMiami Intermodal CenterâIntroducing âCM-At-Riskâ to Trans- portation Construction.â In Molenaar, K. R., and Yakowenko, G., Eds., Alternative Project Delivery, Procure- ment, and Contracting Methods for Highways, ASCE Press, Reston, VA, 46â59. Mitchell, B. P. (1999). âThe Applicability of the Spearin Doctrine: Do Owners Warrant Plans and Specifications?â FindLaw for Legal Professionals. http://library.findlaw.com/1999/Aug/1/128038.html (accessed March 27, 2008). Molenaar, K. R. and S. Scott (2003). âExamining the Performance of Design-Build in the Public Sector.â In Loulakis, M., Ed., Design-Build for the Public Sector, Aspen Publishers, New York, NY, 71â112. Molenaar, K. R., A. D. Songer, and M. Barash (1999). âPublic-Sector Design/Build Evolution and Performance.â Journal of Management in Engineering, Vol.15, No. 2, 54â62. National Association of State Facilities Administrators (NASFA) and Associated General Contractors of Amer- ica (AGC) (2007). CM/GC Guidelines for Public Owners. NASFA and AGC. Oregon Public Contracting Coalition (2000). âCM/GC White Paper.â Oregon Public Contracting Coalition, Portland, OR. Oregon Public Contracting Coalition (2002). âDesign-Build White Paper.â Oregon Public Contracting Coali- tion, Portland, OR. Oyetunji, A. A. and S. D. Anderson (2006). âRelative Effectiveness of Project Delivery and Contract Strategies.â Journal of Construction Engineering and Management, Vol. 132, No. 1, 3â13. Reid, R. L. and J. L. Brown (2007). âLoganâs Smooth Landing.â Journal of Civil Engineering, Vol. 77, No. 3, 44â55. Riley, D., B. Diller, and D. Ken (2005). âEffects of Delivery Systems on Change Order Size and Frequency in Mechanical Construction.â Journal of Construction Engineering and Management, Vol. 131, No. 9, 953â962. Saaty, T. L. (1990). Multicriteria Decision Making: The Analytical Hierarchy Process. RWS Publications, Pitts- burgh, PA. Scott, S., K. R. Molenaar, D. D. Gransberg, and N. C. Smith (2006). NCHRP Report 561: Best Value Procurement Methods for Highway Construction Projects. Transportation Research Board of the National Academies, Washington, DC. Skitmore, R. M. and D. E. Marsden (1988). âWhich Procurement System? Towards a Universal Procurement Selection Technique.â Construction Management and Economics, 6, 71â89. Storm, G. (2007). âNew Contracting Experience Guides Fairbanks Airport Project.â Pacific Builder and Engineer, October 1. http://www.acppubs.com/article/CA6480230.html?industryid=48546 (accessed August 6, 2008). Touran, A., P. J. Bolster, and S. W. Thayer (1994). Risk Assessment in Fixed Guideway Construction. DOT-T-95- 01, FTA, U.S. DOT, Washington, DC. Touran, A., D. D. Gransberg, K. R. Molenaar, K. Ghavamifar, D. J. Mason, and L. A. Fithian (2009). TCRP Report 131: A Guidebook for the Evaluation of Project Delivery Methods. Transportation Research Board of the National Academies, Washington, DC. Transportation Security Administration (TSA)(2006). Recommended Security Guidelines for Airport Planning, Design, and Construction: Revised June 15, 2006. U.S. Department of Homeland Security, Washington, DC. Walewski, J., G. E. Gibson, Jr., and J. Jasper (2001). Project Delivery Methods and Contracting Approaches Available for Implementation by the Texas Department of Transportation. FHWA/TX-0-2129-1. Texas Department of Transportation, Austin, TX. Warne, T. R. and J. L. Beard (2005). Project Delivery Systems Ownerâs Manual. American Council of Engineer- ing Companies, Washington, DC. Wiss, R. A., R. T. Roberts, and S. D. Phraner (2000). âBeyond Design-Build-Operate-Maintain: New Partner- ship Approach Toward Fixed Guideway Transit Projects.â In Transportation Research Record: Journal of the Transportation Research Board, No. 1704. Transportation Research Board, National Research Council, Washington, DC, 13â18. 88 A Guidebook for Selecting Airport Capital Project Delivery Methods