National Academy of Sciences | 150 Year Anniversary

Questions? Call 800-624-6242

| Items in cart [0]

The National Academies Press

Rights & Permissions

topleft topright

ACRP Report 26: Guidebook for Conducting Airport User Surveys (2010)
Airport Cooperative Research Program (ACRP)

Citation Manager

Cripwell, J Paul, Gosling, Geoffrey D, Biggs, D C, Bol, M A, Baker, J, Franz, J D, Transportation Research Board. "2.10 Summary." ACRP Report 26: Guidebook for Conducting Airport User Surveys. Washington, DC: The National Academies Press, 2010.

Please select a format:

BibTeX EndNote RefMan


Page
26
bottomleft bottomright
Page
26
Front Matter (R1-R11)
Summary (1-6)
1.2 Role of Surveys in Airport Planning, Development, and Management (7-7)
1.3 Survey Concepts (8-9)
1.4 Main Survey Types and Methods (10-10)
1.5 How to Use This Guidebook (11-11)
2.1 Defining the Purpose (12-12)
2.2 Selecting the Survey Method (13-15)
2.3 Survey Frequency and Timing (16-17)
2.4 External Agencies (18-18)
2.5 Preparing the Survey Budget (19-19)
2.6 Survey Planning Team (20-21)
2.7 Preliminary Schedule and Target Dates (22-22)
2.8 Survey Location and Security Clearance (23-23)
2.9 Contracting External Resources (24-25)
2.10 Summary (26-26)
Chapter 3 - Statistical Concepts (27-27)
3.2 Statistical Accuracy and Confidence Intervals (28-30)
3.3 Sampling Methods (31-35)
3.4 Sample Size (36-42)
3.5 Weighting (43-43)
3.6 Summary (44-44)
4.1 Survey Population (45-47)
4.2 Sampling Strategy and Plan (48-48)
4.3 Questionnaire Design and Structure (49-51)
4.4 Expected Data Collection Rate (52-52)
4.5 Survey Logistics (53-54)
4.6 Selection and Training of Field Staff (55-57)
4.7 Pre-Tests and Pilot Tests (58-59)
4.8 Maximizing Response Rates (60-62)
4.9 Use of Electronic Data Collection Devices (63-67)
4.10 Data Entry and Quality Control (68-68)
4.11 Analysis and Reporting of Survey Results (69-70)
4.13 Documenting the Survey (71-71)
4.14 Summary (72-72)
5.1 Purpose of the Survey (73-73)
5.2 Survey Methodology (74-89)
5.3 Sample Size, Survey Coverage, and Timing (90-97)
5.4 Questionnaire Wording and Length (98-100)
5.5 Weighting Survey Responses (101-105)
5.7 Location-Specific Guidelines (106-106)
5.8 Information on Greeters and Well-Wishers (107-107)
5.9 Groundside Surveys (108-113)
5.10 Checklists (114-114)
5.11 Survey Budget (115-116)
5.12 Summary (117-118)
6.1 Purpose of the Survey and the Data to Be Collected (119-119)
6.2 Survey Methodology (120-120)
6.3 Sampling Methodology (121-121)
6.4 Questionnaire Wording and Length (122-122)
6.6 Survey Budget (123-123)
6.7 Summary (124-124)
7.2 Survey Methodology (125-126)
7.3 Sampling Methodology (127-127)
7.5 Measures to Obtain Adequate Response (128-128)
7.7 Mystery Shopper (129-130)
7.8 Summary (131-131)
8.3 Sampling, Coverage, and Timing (132-134)
8.5 Measures to Obtain Adequate Response (135-135)
8.7 Summary (136-136)
9.2 Survey Methodology (137-138)
9.4 Questionnaire Wording and Length (139-139)
9.6 Survey Budget (140-140)
9.7 Summary (141-141)
10.2 Collection of Air Cargo Data (142-142)
10.3 Survey Methods (143-143)
10.4 Summary (144-144)
References (145-145)
Glossary and Acronym List (146-152)
Bibliography (153-155)
Appendix A - Airport User Surveys: Summary of Research (156-160)
Appendix B - Sample Sizes, Sample Estimates, and Confidence Intervals (161-177)
Appendix C - Material and Equipment Checklists for Air Passenger Intercept Surveys (178-179)
Appendix D - Sample Training Agenda (180-184)
Appendix E - High-Speed Scanning Technology (185-186)
Appendix F - Sample Questionnaires for Passenger Surveys (187-207)
Appendix G - Sample Questionnaires for Groundside Surveys (208-217)
Appendix H - Sample Questionnaires for Employee Surveys (218-223)
Appendix I - Sample Questionnaire for Tenant Surveys (224-228)
Appendix J - Sample Questionnaire for Area Residents Surveys (229-234)
Appendix K - Sample Questionnaire for Roadside Driver Cargo Surveys (235-239)
Abbreviations used without definitions in TRB publications (240-240)

Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.

OCR for page 26
26 Guidebook for Conducting Airport User Surveys 2.9.4 Contract Management Selecting the right contractor is important but may only be half the battle; it will also be impor- tant for the survey project manager to effectively manage the contract and maintain open com- munications with the contractor to ensure that issues are identified and resolved before they have a major impact on the survey, that the contractor is adhering to the schedule, and that the qual- ity of the work is acceptable. The survey project manager will need to ensure sufficient time for contract management. 2.10 Summary This chapter has provided guidance on key factors in planning a survey. A well-defined plan must consider why the survey is being conducted and then determine how and where the survey will be conducted. Security restrictions must be considered. Budget considerations will likely have a major impact on the survey design, and financial approvals should be sought early in the planning process. The use of external agencies should be considered as a funding source and to avoid duplication of efforts between agencies. It may also be necessary to contract out all or part of the survey project if internal resources are not available or an independent view is required. Chapter 3 explains the concepts of sampling and statistical accuracy, and Chapter 4 sets out the detailed design work of the survey planning team.