Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 83
83
APPENDIX B
Survey Questionnaire
SURVEY FOR AGENCIES THAT UTILIZE ADAPTIVE TRAFFIC CONTROL SYSTEMS
The Transportation Research Board's National Cooperative Highway Research Program (NCHRP) has commissioned a study on
Adaptive Traffic Control Systems (ATCS). The goal of the research is to synthesize the current state of practice on using these sys-
tems in the U.S. and selected foreign countries. We have less than 50 ATCS in the U.S. Yours is among the few. This means that your
experience of working with an ATCS is very important to us. We need your opinion and experience to help us to assess the overall
performance and applicability of ATCS in the U.S.
Please be assured that your responses will be kept in strictest confidence. We will aggregate them with all other responses.
Name:
Organization:
Position:
Address:
Phone:
Fax:
E-mail:
Section I: General Information
1. Please indicate the type of your agency:
a. City government
b. County government
c. State government
d. Regional organization (e.g., metropolitan planning organization)
e. Federal government
f. Consultant
g. Other, please specify: _________________________
Approximately, how many traffic signals does your agency operate? ________; and how many are under Adaptive Traffic
Control System (ATCS)? _______
2. How would you characterize ATCS deployment at your agency?
a. ATCS fully deployed (Year:___ Month:___) and working
b. ATCS fully deployed (Year:___ Month:___) and turned off/removed (Year:__ Month:__)
c. ATCS about to be deployed (Please specify expected time of full operations Y:__ M:__)
d. ATCS was tested (Year:___ Month:___ Test duration:___) but never deployed
3. Please specify type of traffic control used before ATCS was installed. (Check all that apply.)
a. Fixed-time coordinated control
b. Actuated coordinated control
OCR for page 84
84
c. Fixed-time isolated control
d. Actuated isolated control
e. Other, please specify: ______________________________________________________
4. How long did it take to get the ATCS installed (from time when funding was available until ATCS was fully operational)?
a. Less than 3 months
b. 36 months
c. 612 months
d. 12 years
e. More than 2 years
5. Which ATCS(s) does your agency deploy? (Check all that apply.)
a. ACS Lite; Version _____________
b. LA ATCS; Version _____________
c. OPAC; Version _____________
d. RHODES; Version _____________
e. SCATS; Version _____________
f. SCOOT; Version _____________
g. Other (Please specify): ____________________________________________
6. Did you seriously consider other ATCSs before you selected this one for installation in your jurisdiction? Why did you reject the
other(s) in favor of this one?
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
7. How familiar do you consider yourself with your ATCS?
a. I know the system very well [for multiple systems specify which one(s) ___________]
b. I have a good working knowledge [for multiple systems specify which one(s) ________]
c. I understand it but am no specialist [for multiple systems specify which one(s) ________]
d. I have a vague understanding [for multiple systems specify which one(s) ___________]
e. Unfamiliar [for multiple systems specify which one(s) ___________]
8. How many traffic signal operations staff (for all traffic signals) are in your organization?
a. Engineers __________
b. Timing technicians __________
c. Field technicians __________
d. Maintenance technicians __________
e. Others __________
OCR for page 85
85
9. How many times have new intersections been added under the ATCS umbrella since its initial deployment? (Please specify the
reason.)
a. None
b. Once __Major expansion __New signals added within the system
c. Twice __Major expansion __New signals added within the system
d. 3+ times __Major expansion __New signals added within the system
10. Which of the following type(s) of network configuration best represent your typical ATCS deployment?
a. Arterial
b. Grid
c. Radial
d. Combination of the above
e. Other, please specify: _______________________________________________
11. Why did you agency install an ATCS? Please rank the reasons provided below according to their importance? (1 for the least
important; 9 for the most important):
a. Reducing/eliminating costs of retiming traffic signals
#__
b. Handling oversaturated traffic conditions
#__
c. Handling traffic special events
#__
d. Handling high day-to-day and within-a-day traffic variability
#__
e. Handling conflicts between vehicular traffic and other modes (pedestrian, transit, etc.)
#__
f. Serving as a testbed/early deployer of innovative signal control method
#__
g. Availability of funding for capital ITS projects
#__
h. Expecting significant operational savings and/or high benefit/cost ratio #__
i. Other (please specify): _______________________________________________ #__
12. How satisfied are you, in general, with the adaptive aspect of your ATCS deployment?
a. Very satisfied
b. Somewhat satisfied
c. Neutral
d. Somewhat dissatisfied
e. Not satisfied at all
OCR for page 86
86
13. If your ATCS does not operate on all signals in your jurisdictions at all times of day, why haven't you expanded it to do so?
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
Section II: System Requirements
Detection
14. What type of detection technology do you use for your ATCS? (Check all that apply.)
a. Inductive loops
b. Video detection
c. Radar detection
d. Other (please specify): ________________________________
15. How would you characterize the level of detection needed for the proper functioning of your ATCS?
a. More detectors than actuated traffic control systems
b. Number of detectors is similar to the number used by actuated traffic control systems
c. Fewer detectors than used by actuated traffic control systems
16. How many detectors does your ATCS use for a typical 4-leg 12-movement (a lane per movement) intersection:____? Please pro-
vide additional description here:
_________________________________________________________________________________________
_________________________________________________________________________________________
17. Where are detectors typically placed in your ATCS deployment?
a. Upstream, ____ ft from a downstream intersection
b. Stop-line
c. Mid-block, ____ ft from a downstream intersection
d. Combination of ____ and ____
18. Where left-turn detectors are typically placed in your ATCS deployment?
a. Filter detection (detector is placed in the destination lane of a left-turn movement)
b. Stop-line detection
c. Behind stop-line detection (23 car lengths behind; triggers protected left only for 23 + cars)
d. Upstream detection, _____ ft from downstream intersection
e. Combination of ____ and ____
f. No left-turn detectors
19. How does your ATCS work with minor detector malfunctioning (only a few detectors fail)?
a. Very well
b. Acceptably
OCR for page 87
87
c. Neutrally
d. Poorly
e. Very poorly
20. What happens to your ATCS operations when many detectors fail?
a. ATCS continues to operate as if nothing happened
b. ATCS triggers an alarm and notifies operators
c. ATCS switches to an "off-line" mode by implementing Time-Of-Day plans
d. Combination of ____ and ____
e. Other (please describe): _____________________________________________
Hardware
21. Does your ATCS use hardware with which you and your colleagues are familiar?
a. Central controller (server) __Yes __No
b. Local controllers __Yes __No
c. Additional hardware __Yes __No
Please specify additional hardware: __________________________________________
22. What type of traffic controllers are used by your ATCS? (Check all that apply.)
a. NEMA TS-1, # of controllers ____
b. NEMA TS-2, # of controllers ____
c. 170, # of controllers ____
d. 2070, # of controllers ____
e. Other, please specify: _______________________
Software
23. What type of Operating System (OS) does your ATCS run?
a. Windows-based OS
b. Unix-based OS
c. Open VMS
d. Other, please specify: ___________________
24. How user-friendly is your ATCS' software?
a. Very friendly
b. Friendly
OCR for page 88
88
c. Neutral
d. Unfriendly
e. Very unfriendly
Communications
25. How dependent is your ATCS on reliable communications? Rate the level of importance of the communications for your
deployment? (1- the most important, 3 - the least important):
a. Communications between elements at the intersection _____
b. Peer-to-peer communications _____
c. Field controller to central system communications _____
26. What type of transmission media does your ATCS use for communication between central hardware/software and field traffic
controllers? (Check all that apply.)
a. Twisted pair
b. Telephone line
c. Coaxial cable
d. Fiber optic
e. Microwave (terrestrial or satellite)
f. Wireless (application protocol or broadband systems)
g. Other, please specify: _______________________
27. What type of transmission media does your ATCS use for communication between field traffic controllers? (Check all that apply.)
a. Twisted pair
b. Telephone line
c. Coaxial cable
d. Fiber optic
e. Microwave (terrestrial or satellite)
f. Wireless (application protocol or broadband systems)
g. Other, please specify: _______________________
h. Not applicable
28. How do you compare ATCS's communications to your communications of regular traffic signals?
a. More problems with ATCS communications
b. Similar to communications of regular traffic signals
c. Fewer problems with ATCS communications
OCR for page 89
89
Other
29. Which of the following traffic control management systems is integrated in your ATCS? (Specify all that apply.)
a. ACTRA
b. I2 (Icons)
c. MIST
d. Other, please specify: __________________________
e. We do not use any traffic control management system
f. Our ATCS is not integrated with our traffic control management system (specify which one __________) because
____________________________________________________________________________________________
____________________________________________________________________________________________
____________________________________________________________________________________________
30. What is the predominant design speed on the network where your ATCS is deployed?
a. Less than 30 mph
b. Between 30 mph and 45 mph
c. More than 45 mph
d. Combination of ____ and ____and____
31. Is your ATCS able to report malfunctions and other diagnostics of its hardware and software components?
a. Yes
b. No
c. Generally yes, but it does not report on _______________________________________
32. Do you find traffic metrics (traffic flows, level of service, degree of saturation, etc.) reported by your ATCS useful for other
traffic engineering purposes?
a. Yes, please specify: _______________________________________________________
b. No
Section III: Institutional Issues
Training
33. What is the best estimate of the level of effort, by vendor/consultant, to train your staff to operate the ATCS: Person-days _____?
34. Was the training provided by vendor/consultant adequate? If not, what was the major reason for inadequacy?
a. Yes, the training was adequate
b. No, vendor/consultant did not have enough expertise
c. No, there was not enough interest for the training at our agency
d. No, vendor/consultant was not interested in providing the training
e. No, training was too expensive
f. No, because (please specify): _______________________________________
OCR for page 90
90
35. How understandable are working principles of your ATCS to you and your colleagues?
a. Very easy
b. Easy
c. OK
d. Difficult
e. Very difficult
36. Where does expertise come from to operate/maintain your ATCS deployment currently?
a. In-house expertise
b. We contract out
c. Combination of a. and b., please describe:
_________________________________________________________________________________________
37. Is your agency willing to improve in-house expertise to fully utilize your ATCS potential? If not, what are major obstacles to
obtain such expertise? (Check all that apply.)
a. Yes, we would like to get enough expertise to fully operate ATCS in-house
b. No, we do not have enough staff
c. No, cost of such training program would be prohibitively expensive
d. No, there is not enough interest for ATCS at our agency
e. No, the ATCS does not deserve that much attention--only small % of signals is under ATCS
f. No, because (please specify): _____________________________________________
Operations
38. Do you have enough staff to operate and maintain the ATCS to its fullest potential?
a. Yes
b. No--how much more do you need and what type?
_________________________________________________________________________________________
39. Is your annual budget for operations and maintenance of traffic signals large enough to cover expenses for your ATCS to its
fullest potential?
a. Yes
b. No
40. How do you perceive operations of your ATCS (hardware, communications, and software)?
a. Much more demanding than operations of regular traffic signals
b. More demanding than operations of regular traffic signals
c. Same as operations of regular traffic signals
d. Less demanding than operations of regular traffic signals
e. Much less demanding than operations of regular traffic signals
OCR for page 91
91
41. What is the best estimate of the level of effort, by the vendor/consultant, to make the ATCS operational: Person-days _____?
42. How would you characterize technical support by your ATCS vendor for your deployment?
a. Very good
b. Good
c. Neutral
d. Poor
e. Very poor
43. What are the major problems with the technical support for your ATCS? (Check all that apply.)
a. No local consultants to provide technical support
b. Technical support is too expensive
c. Vendor providing technical support does not have enough expertise on our ATCS
d. Other, please specify: _____________________________________________
e. Not applicable--no problems with technical support
44. What are the major traffic operation features that your ATCS handles well (explain why, in your opinion)?
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
45. What are the major traffic operation features that your ATCS does NOT handle well (explain why not, in your opinion)?
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
Maintenance
46. How do you perceive maintenance of your ATCS (hardware, communications, and software)?
a. Much more demanding than maintenance of regular traffic signals
b. More demanding than maintenance of regular traffic signals
c. Same as maintenance of regular traffic signals
d. Less demanding than maintenance of regular traffic signals
e. Much less demanding than maintenance of regular traffic signals
47. Please describe any additional maintenance required to effectively operate an ATCS?
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
48. Which component of your ATCS deployment is the most challenging to maintain and why?
a. Detection, because _____________________________________________________
b. Communication, because ________________________________________________
c. Hardware, because _____________________________________________________
OCR for page 92
92
d. Software, because ______________________________________________________
e. Licensing, because _____________________________________________________
f. Other, please specify: ___________________________________________________
49. Is there any other institutional issue that you would like to report?
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
Section IV: Implementation Benefits & Costs
Costs
50. Please characterize pricing of licensing requirements for further expansion of your ATCS?
a. Prohibitively expensive
b. Expensive
c. Neutral
d. Affordable
e. Inexpensive
f. Not applicable
Please justify your response
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
51. Please specify the total ATCS installation costs (or the best estimate): $___________
(Do not include intersection upgrade or similar costs.)
52. What percentage of your typical annual budget would you estimate is spent on physical maintenance of your ATCS deployment?
__________(Do not include addition of new signalized intersections or similar costs.)
53. What are your best estimates of per-intersection annual costs of maintaining optimal signal timings (e.g., consulting, hardware,
and software costs) for:
a. ATCS deployment $ ________
b. Non-ATCS deployment $ ________
Evaluation
54. How was ATCS performance evaluated?
a. In-house
b. By an independent evaluator
c. Not applicable--there was no evaluation
OCR for page 93
93
55. What type of evaluation study was conducted? (Check all that apply.)
a. Field evaluation
b. Evaluation through microsimulation
c. "Before ATCS and after ATCS" study
d. "ATCS On and ATCS Off" study--(TOD plans operate when ATCS is turned off)
e. Not applicable
56. Which performance measures were collected in the evaluation study? (Check all that apply.)
a. Arterial travel time/delay
b. Number of stops
c. Intersection delay
d. Queue lengths
e. Average speeds
f. Others, please specify: _______________________________________________
g. Not applicable
57. For which of these performance measures was ATCS shown to be significantly better than conventional traffic control? (Check
all that apply.)
a. Arterial travel time/delay
b. Number of stops
c. Intersection delay
d. Queue lengths
e. Average speeds
f. Others, please specify: _______________________________________________
g. Not applicable
58. Based on your ATCS evaluation study--how does ATCS compare to previous traffic control?
a. ATCS is much better
b. ATCS is better
c. Neutral
d. Previous traffic control was better
e. Previous traffic control was much better
f. Not applicable
OCR for page 94
94
Benefits
59. If the corridors on which the ATCS operates experience over saturation, how would you rate the operation of the ATCS in
response to these traffic conditions?
a. ATCS prevents or eliminates oversaturation
b. ATCS eliminates or reduces the extent of the periods of oversaturation
c. ATCS adversely affects the traffic conditions during periods of oversaturation
d. Other:_____________________________________________________________
f. Oversaturation is very rare on the corridors operated by our ATCS
60. Based on your performance measures, when are ATCS operations proven to be the most effective?
a. Peak periods
b. Off-peak periods
c. Shoulders of peak periods
d. Other: ____________________________________________________________
61. Has the level of performance of ATCS been sustained since its installation?
a. Yes
b. No; why not? Any specific reason? ________________________________________
62. Are there any other costs or benefits related to ATCS deployment that you would like to report?
a. Benefits
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
b. Costs
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Public Perception
63. How effective was a public education campaign conducted by your agency along with your ATCS deployment?
a. Very effective
b. Somewhat effective
c. Neutral
d. Not very effective
e. Not effective
f. Not applicable--there was no public education campaign
64. Are the results of public perception survey supportive of the ATCS?
a. Clearly supportive
b. Somewhat supportive
OCR for page 95
95
c. Neutral
d. Somewhat not supportive
e. Not supportive
f. Not applicable--there was no public perception survey
Section V: Final Comments
65. What were the biggest surprises in your early ATCS deployment?
a. Good surprises__________________________________________________________
b. Bad surprises __________________________________________________________
66. Would you install the same ATCS again in another location? If not, why not? (Check all that apply.)
a. Yes, we would probably install the same ATCS again
b. No, other ATCSs seem to work better
c. No, installation costs are too high
d. No, operations and maintenance costs are too high
e. No, we do not have enough expertise within the agency
f. No, technical support from vendor is weak
g. No, ATCS deployment is not necessary--we did not see expected benefits
h. No, because (please specify): _____________________________________________
67. In hindsight, what would you have done differently during the implementation of your ATCS?
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
68. Do you have an evaluation case study of your ATCS that you would be willing to share with us? If you answer yes, the consul-
tant will contact you via e-mail to arrange delivery and potential further interviews regarding the case study.
a. Yes
b. No
69. Do you have any other information that you believe would be helpful to this study? If so, please indicate it in the blank provided
below:
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
Thank you for your help in completing this survey. Your responses will help provide insights into how to better understand ATCS.
If you have any questions regarding the survey, please contact Aleksandar Stevanovic, aleks@trafficlab.utah.edu, 801-671-2868.
You can mail any documentation that you might feel will be helpful to this study to the following address: Aleksandar Stevanovic,
1192 University Village, Salt Lake City, UT 84108.