Suggested Citation:"Chapter 1 - Background." National Academies of Sciences, Engineering, and Medicine. 2011. Guidelines for the Use of Pavement Warranties on Highway Construction Projects. Washington, DC: The National Academies Press. doi: 10.17226/14554.
×
Page 3
Page 4
Suggested Citation:"Chapter 1 - Background." National Academies of Sciences, Engineering, and Medicine. 2011. Guidelines for the Use of Pavement Warranties on Highway Construction Projects. Washington, DC: The National Academies Press. doi: 10.17226/14554.
×
Page 4

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

3Problem Statement State departments of transportation (DOTs) have used warranties for both flexible pavements [primarily hot mix asphalt (HMA)] and rigid portland cement concrete (PCC) pavements for many years. Under a pavement-warranty specification, the performance of the pavement is measured over time as opposed to measuring the quality of pavement materials and workmanship during and immediately after construction. Pavement warranties require the construction contractor to guarantee the post-construction performance of the pavement at varying levels. Shifting post-construction performance risk from the DOT to the contractor is perceived as reducing premature pavement failures, reducing costs, and increasing pavement quality. While some DOTs have reported that the use of pavement warranties has resulted in dramatic improvements in quality, reduction in premature failures, and cost advantages, the overall reported results have been mixed, in part based on the type of warranty implemented. Objectives and Research Approach The objective of this research was to investigate the use of pavement warranties by DOTs, develop a decision tool for applying warranties, and develop guidelines to assist DOTs in determining when to use warranties and how best to apply them. The study took into consideration various categories of pavement projects and types of warranties. Distinctions within the major categories of asphalt and concrete pavement projects were made due to the differences in risk allocation. Therefore, asphalt and concrete pavement projects were generally classified as preservation, rehabilitation, or new construction projects. Preservation includes surface treatments such as thin overlays, microsurfacing, chip sealing, and crack sealing. Rehabilitation includes overlays and partial depth replacement projects. New construction includes new align- ments and full-depth replacement projects. Phase I The research approach for Phase I of the study included a Task 1 literature review of information relevant to the application of pavement warranties, including DOT pavement warranty evaluation reports and warranty specifications. The research team held a joint industry/DOT workshop to discuss the state of practice of warranties in the United States and overseas and conducted targeted interviews using a sample of 14 DOTs with varying levels of experience, ranging from none to using warranties as a standard practice. Information gathered through the literature review, joint DOT/industry workshop, and DOT interviews is summarized in Chapter 2. A bibliography of warranty literature and warranty-related reports is included in this report. Common definitions and terms associated with warranties are listed in the Glossary. A list of the DOTs and interview participants is included in Appendix C2, as is the form used to guide the interview process. The research team included eight general topic areas on the interview form. This information was used to iden- tify key issues for the application of pavement warranties before, during, and after construction and key factors to be considered in determining when and how to apply pavement warranties. Using the information gathered from the literature, DOT interviews, and the workshop, Task 2 involved the develop- ment of a systematic decision tool to guide DOTs in deciding when to apply warranties to a project. The last step in the approach, Task 3, was applying or vetting the electronic decision tool developed in Task 2 on highway pavement projects for no fewer than five highway agencies. Based on the results of the vetting, the decision tool was refined to reflect the input received from DOTs applying it to their actual projects. Finally, the Task 4 interim report presented the results of the literature review, joint industry/DOT workshop, war- ranty decision tool, and vetting process. The report also provided a draft outline of the proposed guidelines as part of the Phase II effort. C H A P T E R 1 Background

Phase II Based on feedback from the research panel, the Phase II Task 5 scope was to finalize the Phase I selection tool, including a comparison of key factors to consider in the selection of a pavement warranty type and the development of a decision process and written guidelines and forms for the pavement warranty selection tool. This final pavement warranty decision tool is included in Appendix A2. The objective of Phase II Task 6 was to develop practical guidelines for project-level application of pavement warranties in order to assist DOTs in determining when and how to use warranties for both HMA and PCC pavements. Because many DOTs have developed warranty provisions and general guidance for project selection and implementation or have performed evaluations of their warranty programs, the focus of this research was to build on this body of knowledge and provide the most practical guidance based on the lessons learned from these programs. The warranty guidelines were designed to include key implementation topics, including project selection, the selection of performance criteria and thresholds, contracting strategy and risk allocation, monitoring and evaluation, remedial work, exclusions, bonding consid- erations, dispute resolution, and acceptance. The pavement warranty guidelines (as Appendix A1) and warranty decision tool are provided on the CD-ROM accompanying this report, as are the other appendices. Finally, Task 7 addressed the development of draft technical warranty provisions for HMA and PCC pavements suitable for inclusion in the AASHTO Primer on Contracting for the Twenty-First Century that DOTs can use to develop their own project-specific warranty provisions. The model specification for HMA refines and updates the existing technical provision for HMA pavements. A new supplemental provision was developed for PCC pavements. These model provisions incorporate language and lessons learned from the imple- mentation of existing warranty provisions. They also include commentary and suggested values and options depending upon the type of warranty or type of contracting method implemented. 4

Next: Chapter 2 - Research Findings »
Guidelines for the Use of Pavement Warranties on Highway Construction Projects Get This Book
×
 Guidelines for the Use of Pavement Warranties on Highway Construction Projects
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s National Cooperative Highway Research Program (NCHRP) Report 699: Guidelines for the Use of Pavement Warranties on Highway Construction Projects is designed to help guide state departments of transportation (DOTs) in establishing pavement warranty programs.

The guide identifies programmatic and project-level decision criteria that DOTs should consider when implementing and sustaining a program. The guide presents strategies to mitigate project-specific risks and also includes model warranty specification provisions.

The guide also includes a decision tool to help identify program-level issues and project-specific risks. The tool is included on a CD-ROM that is packaged with the printed version of the report.

The CD-ROM is also available for download from TRB’s website as an ISO image. Links to the ISO image and instructions for burning a CD-ROM from an ISO image are provided below.

Help on Burning an .ISO CD-ROM Image

Download the .ISO CD-ROM Image

(Warning: This is a large file and may take some time to download using a high-speed connection.)

CD-ROM Disclaimer - This software is offered as is, without warranty or promise of support of any kind either expressed or implied. Under no circumstance will the National Academy of Sciences or the Transportation Research Board (collectively “TRB’) be liable for any loss or damage caused by the installation or operation of this product. TRB makes no representation or warranty of any kind, expressed or implied, in fact or in law, including without limitation, the warranty of merchantability or the warranty of fitness for a particular purpose, and shall not in any case be liable for any consequential or special damages.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!