Cover Image

Not for Sale



View/Hide Left Panel
Click for next page ( 83


The National Academies | 500 Fifth St. N.W. | Washington, D.C. 20001
Copyright © National Academy of Sciences. All rights reserved.
Terms of Use and Privacy Statement



Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.

OCR for page 82
(This is page 52 of Table 2) 82 Form of Assistance, Statutory Authority, Local Matching Timeline and Administrative Department/ Resource Project/Applicant Guidance & Contact Requirements, Application and Post-grant State Program Area Eligibility Information Funding Limits Process Requirements Notes Louisiana Department Airport http://www.dotd.la.gov/ Grants Standard Forms of Transporta- planning intermodal/aviation/ Louisiana sponsor available at tion and and devel- certifications listed URL Development, opment Brand Brandt (225) 274-4149; required Aviation brad.brandt@la.gov Section, Standard Airport Louisiana Capital reimbursement Program forms required Maine Historic Historic Restoration of historic 5 M.R.S.A. 1931, 27-A Grants June 6-- Buildings must be Five criteria Preservation and cultural buildings and M.R.S.A. 504, 505. and Sp. Applications due listed in or are applied as Commission resources structures L. 1985, c. 73; and 27 Local match--50% nominated for the listed in both New Century M.R.S.A. 558. July 2--Grants National Register URLs Community Eligible applicants-- awarded of Historic Places Program Local governments http://www.maine.gov/mhpc/ Minimum grant-- National grants/new_century.html $5,000 Projects must be standards for completed in two work included http://www.maine.gov/mhpc/ years at second grants/2008%20New%20 listed URL Century%20Grants%20 Covenants for Manual.pdf public access and Application historical integrity form at third http://www.maine.gov/mhpc/ may be required listed URL grants/2008%20New%20 Century%20Grant%20App.pdf Preservation or stewardship agreement required. Length of agreement depends on grant amount Grants paid on reimbursement basis Final report by project engineer/architect Work must conform to national standards Maine Maine Water Projects to protect or Clean Water Act, Section 319 Grants April 13--RFP Watershed based Information on Department quality restore threatened or Pub. L 92-500 issued plan required for prior grants (Table 2 continued on the next page)

OCR for page 82
(This is page 53 of Table 2) Form of Assistance, Statutory Authority, Local Matching Timeline and Administrative Department/ Resource Project/Applicant Guidance & Contact Requirements, Application and Post-grant State Program Area Eligibility Information Funding Limits Process Requirements Notes of polluted lakes, streams http://www.maine.gov/dep/ Local match--40% June 1-- project to restore available at Environmen- or coastal waters blwq/docgrant/319.htm Applications due impaired water following 2 tal Protection Maximum grant-- body URLs (MDEP) Non- http://www.maine.gov/dep/ $150,000 July 28-- Point Source blwq/docgrant/319_files/ Notification of Projects must be http://www. Pollution 2011_NPS_RFP_041310.pdf decisions designed to maine.gov/dep/ Control achieve blwq/docgrant/ Norm Marcotte (207) 287- October-- significant 319.htm Program 7727; revised work reduction in norm.g.marcotte@maine.gov plans due (if pollutant load http://www. needed) maine.gov/dep/ Projects must be blwq/docgrant/ November-- completed in two 319_files/nps_ final work plan years outcome.pdf approval Semiannual and Program focus December-- final reports on priority grant agreement required watersheds signed Data collection Projects to January--EPA may require meet permit distributes approval of a requirements funds, project Quality Assurance not eligible starts Project Plan Weighted Hardcopy Payment requests numerical applications, once every 30 point system seven copies in days. Requests described in sealed envelope processed within second URL 30 days Administrative Final payment guidelines request 45 days available at after completion http://www. maine.gov/dep/ blwq/docgrant/ 319.htm Instructions for preparing proposals at second URL Examples of work plan for application available: 83 http://www. maine.gov/dep/ (Table 2 continued on the next page)