National Academies Press: OpenBook
« Previous: Acronyms
Page 50
Suggested Citation:"Bibliography." National Academies of Sciences, Engineering, and Medicine. 2011. Application of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions. Washington, DC: The National Academies Press. doi: 10.17226/14571.
×
Page 50
Page 51
Suggested Citation:"Bibliography." National Academies of Sciences, Engineering, and Medicine. 2011. Application of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions. Washington, DC: The National Academies Press. doi: 10.17226/14571.
×
Page 51
Page 52
Suggested Citation:"Bibliography." National Academies of Sciences, Engineering, and Medicine. 2011. Application of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions. Washington, DC: The National Academies Press. doi: 10.17226/14571.
×
Page 52
Page 53
Suggested Citation:"Bibliography." National Academies of Sciences, Engineering, and Medicine. 2011. Application of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions. Washington, DC: The National Academies Press. doi: 10.17226/14571.
×
Page 53

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

50 ACI Innovation Task Group 1. (2003). ACI T1.2-03: Special Hybrid Moment Frames Composed of Discretely Jointed Precast and Post- Tensioned Concrete Members. Alderson, J. (2005). Report on Precast Beam Cap Pilot Project. Missouri Department of Transportation. Jefferson City. American Association of State Highway and Transportation Officials (AASHTO). (2009). AASHTO Guide Specifications for LRFD Seismic Bridge Design. AASHTO. Washington, DC. American Association of State Highway and Transportation Officials (AASHTO). (2010). AASHTO LRFD Bridge Design Specifications, 5th ed. AASHTO. Washington, DC. Aref, A. (2009). Technical Monograph Development on Seismic Accelerated Bridge Construction—FHWA Research Project Briefing. MCEER. State University of New York at Buffalo. Asnaashari, A., Grafton, R. J., and Johnnie, M. (2005). Precast Concrete Design-Construction of San Mateo-Hayward Bridge Widening Project. PCI Journal, 50(1), pp. 26–43. Billington, S. L., Barnes, R. W., and Breen, J. E. (1999). A Precast Seg- mental Substructure System for Standard Bridges. PCI Journal, 44(4), pp. 56–73. Billington, S. L., Barnes, R. W., and Breen, J. E. (2001). Alternate Sub- structure Systems for Standard Highway Bridges. Journal of Bridge Engineering, 6(2), pp. 87–94. Billington, S. L., and Yoon, J. K. (2004). Cyclic Response of Unbonded Posttensioned Precast Columns with Ductile Fiber-Reinforced Concrete. Journal of Bridge Engineering, 9(4), pp. 353–363. Bozorgzadeh, A., Megally, S. H., Ashford, S., and Restrepo, J. (2007). Seismic Response of Sacrificial Exterior Shear Keys in Bridge Abutments. Structural Systems Research Project. Report No. SSRP-04/14. Univer- sity of California, San Diego. Brenes, F., Wood, S., and Kreger, M. (2006). Anchorage Requirements for Grouted Vertical-Duct Connectors in Precast Bent Cap Systems. Report No. FHWA/TX-06/0-4176-1. Center for Transportation Research, The University of Texas at Austin. Bromenschenkel, R. (2010). Caltrans Next Generation Bridge. 26th US- Japan Bridge Engineering Workshop. New Orleans, LA, Sept. 20–22, 2010. Buchanan, A., Deam, B., Fragiacomo, M., Pampanin, S., and Palermo, A. (2008). Multi-Storey Prestressed Timber Buildings in New Zealand. Structural Engineering International, 18(2), pp. 166–173. Buckle, I., Friedland, I., Mander, J., Martin, G., Nutt, R., and Power, M. (2006). Seismic Retrofitting Manual for Highway Structures: Part 1— Bridges. Report No. FHWA-HRT-06-032. Federal Highway Admin- istration, McLean, VA. Christopoulos, C., and Folz, B. (2002). Posttensioned Energy Dissipating Connections for Moment-Resisting Steel Frames. Journal of Struc- tural Engineering, 128(9), pp. 1111–1120. Chung, P., Wolfe, R., Ostrom, T., and Hida, S. (2008). Accelerated Bridge Construction Applications in California—A Lessons Learned Report. Caltrans. Sacramento, CA. Cohagen, L., Pang, J., Eberhard, M., and Stanton, J. (2008). A Precast Concrete Bridge Bent Designed to Re-Center After an Earthquake. Report No. WA-RD 684.3. Washington State Transportation Cen- ter (TRAC). Concrete Technology Associates. (1974). Ductile Pullout Connections. Report No. 74-B11. Tacoma, WA. Culmo, M. (2009). Connection Details for Prefabricated Bridge Elements and Systems. Report No. FHWA-IF-09-010. Federal Highway Admin- istration, Office of Bridge Technology. Washington, DC. Eligehausen, R., Cook, R., and Appl, J. (2006a). Behavior and Design of Adhesive Bonded Anchors. ACI Structural Journal, 103(6), pp. 822–832. Eligehausen, R., Mallée, R., and Silva, J. F. (2006b). Anchorage in Concrete Construction. Wiley-VCH. Hoboken, NJ. Englekirk, R. E. (2002). Design-Construction of the Paramount: A 39- Story Precast Prestressed Concrete Apartment Building. PCI Journal, 47(4), pp. 56–71. Fam, A., Pando, M., Filz, G., and Rizkalla, S. (2003). Precast Piles for Route 40 Bridge in Virginia using Concrete Filled FRP Tubes. PCI Journal, 48(3), pp. 32–45. Federal Highway Administration. (2007). 2007 FHWA Seismic Accelerated Bridge Construction Workshop—Final Report. Washington, DC. Federal Highway Administration (FHWA). (2007). Manual on Use of Self-Propelled Modular Transporters to Remove and Replace Bridges. FHWA, U.S. DOT. Washington, DC. fib Bulletin 27: Seismic Design of Precast Concrete Building Structures. (2003). Lausanne, Switzerland: International Federation for Struc- tural Concrete (fib). Fouad, F. H., Hamby, D., Rizk, T., and Stafford, E. L. (2006). Prefabricated Precast Concrete Bridge System for the State of Alabama. University Transportation Center for Alabama. Tuscaloosa. Guarre, J. S., and Hjorteset, K. (1999). Seismic Design of the Getty Center Tram Guideway. Concrete International, 21, pp. 37–42. Gurbuz, T., and Ilki, A. (2011). Pullout Performance of Fully and Partially Bonded Retrofit Anchors in Low-Strength Concrete. ACI Structural Journal, 108(1), pp. 61–70. Haraldsson, O., Pang, J., Stanton, J., and Eberhard, M. (2009). A Precast Concrete Bridge Bent for Seismic Regions. Proc., Special International Bibliography

51 Workshop on Seismic Connection Details for Segmental Bridge Con- struction, Seattle, WA, pp. 55–65. Haraldsson, O., Stanton, J., and Eberhard, M. (2010 Draft). Laboratory Tests of Column-to-Footing Socket Connection (Draft Report). Washington State DOT. Olympia. Hieber, D. G., Wacker, J. M., Eberhard, M. O., and Stanton, J. F. (2005a). Precast Concrete Pier Systems for Rapid Construction of Bridges in Seismic Regions. Report No. WA-RD 611.1. Washington State Transportation Center (TRAC). Hieber, D. G., Wacker, J. M., Eberhard, M. O., and Stanton, J. F. (2005b). State-of-the-Art Report on Precast Concrete Systems for Rapid Con- struction of Bridges. Report No. WA-RD 594.1. Washington State Transportation Center (TRAC). Holombo, J., Priestley, M. J. N., and Seible, F. (1998). Longitudinal Seismic Response of Precast Spliced-Girder Bridges. Report No. SSRP-98/05. University of California, San Diego. Holombo, J., Priestley, M. J. N., and Seible, F. (2000). Continuity of Precast Prestressed Spliced-Girder Bridges Under Seismic Loads. PCI Journal, 45(2), pp. 40–63. Joint ACI-ASCE Committee 550. (2009). ACI 550.1R-09: Guide to Emu- lating Cast-in-Place Detailing for Seismic Design of Precast Concrete Structures. Josten, M. G., Painter Jr., W. L., and Guarre, J. S. (1995). Precast Pre- stressed Concrete Structure Provides Solution for Getty Center Tram Guideway. PCI Journal, 40(3), pp. 24–39. Karapiperis, D., Lykidis, G., Savvopoulos, G. C., Khaled, E. S., and Loukakis, K. (2010). Combined Effort. Civil Engineering, 80(7), pp. 74–85. Kesner, K. E., Billington, S. L., and Douglas, K. S. (2003). Cyclic Response of Highly Ductile Cement-Based Composites. ACI Materials Journal, 100(5), pp. 381–390. Khaleghi, B. (2011). ABC in Washington State, Accelerated Bridge Con- struction: Research, Design, and Practice Workshop. Presented at the 90th Annual Meeting of the Transportation Research Board, Washington, DC. Khaleghi, B. (2005). Use of Precast Concrete Members for Accelerated Bridge Construction in Washington State. Transportation Research Board—6th International Bridge Engineering Conference: Reliability, Security, and Sustainability in Bridge Engineering, Boston, MA, July 17–20, 2005, pp. 187–196. Kingsley, A. M. (2005). Experimental and Analytical Investigation of Embedded Column Base Connections for Concrete Filled High Strength Steel Tubes. (Unpublished Master’s Thesis). University of Washington, Seattle, WA. Kwan, W. P., and Billington, S. L. (2003a). Unbonded Posttensioned Concrete Bridge Piers. I: Monotonic and Cyclic Analyses. Journal of Bridge Engineering, 8(2), pp. 92–101. Kwan, W. P., and Billington, S. L. (2003b). Unbonded Posttensioned Concrete Bridge Piers. II: Seismic Analyses. Journal of Bridge Engi- neering, 8(2), pp. 102–111. Lai, Y. C. (2010). Moment Connections of Concrete-Filled Fibre Rein- forced Polymer Tubes to Reinforced Concrete Footings. (Unpub- lished Master’s Thesis). Queen’s University, Kingston, Ontario, Canada. Lee, W., Jeong, H., Billington, S., Mahin, S. A., and Sakai, J. (2007). Post- Tensioned Structural Concrete Bridge Piers with Self-Centering Characteristics. 2007 ASCE Structures Congress, Long Beach, CA. Lee, W. K., and Billington, S. L. (2009). Simulation and Performance-Based Earthquake Engineering Assessment of Self-Centering Post-Tensioned Concrete Bridge Systems. Report No. 2009/109. Pacific Earthquake Engineering Research Center. University of California, Berkeley. Mahin, S. (2008). Sustainable Design Considerations in Earthquake Engineering. The 14th World Conference on Earthquake Engineer- ing, Beijing, China. Mahin, S., Sakai, J., and Jeong, H. (2006). Use of Partially Prestressed Reinforced Concrete Columns to Reduce Post-Earthquake Resid- ual Displacements of Bridges. Fifth National Seismic Conference on Bridges & Highways, San Francisco, CA. Marson, J., and Bruneau, M. (2004). Cyclic Testing of Concrete-Filled Circular Steel Bridge Piers Having Encased Fixed-Based Detail. Journal of Bridge Engineering, 9(1), pp. 14–23. Matsumoto, E. (2000). Development of a Precast Bent Cap System. (Unpublished Ph.D Dissertation). Center for Transportation Research, The University of Texas at Austin. Matsumoto, E. (2009a). Emulative Precast Bent Cap Connections for Seis- mic Regions: Component Tests—Cast-in-Place Specimen (Unit 1). Report No. ECS-CSUS-2009-01. California State University, Sacramento. Matsumoto, E. (2009b). Emulative Precast Bent Cap Connections for Seismic Regions: Component Test Report—Grouted Duct Specimen (Unit 2). Report No. ECS-CSUS-2009-02. California State Univer- sity, Sacramento. Matsumoto, E. (2009c). Emulative Precast Bent Cap Connections for Seismic Regions: Component Test Report—Cap Pocket Full Ductility Specimen (Unit 3). Report No. ECS-CSUS-2009-03. California State University, Sacramento. Matsumoto, E. (2009d). Emulative Precast Bent Cap Connections for Seis- mic Regions: Component Test Report—Cap Pocket Limited Ductility Specimen (Unit 4). Report No. ECS-CSUS-2009-04. California State University, Sacramento. Matsumoto, E. (2009e). Emulative Precast Bent Cap Connections for Seismic Regions: Grouted Duct and Cap Pocket Test Results, Design and Construction Specifications, Design Examples, and Connection Details. Report No. ECS-CSUS-2009-05. California State Univer- sity, Sacramento. Matsumoto, E., Waggoner, M., Kreger, M., Vogel, J., and Wolf, L. (2008). Development of a Precast Concrete Bent-Cap System. PCI Journal, 53(3), pp. 74–99. Matsumoto, E., Waggoner, M., Sumen, G., Kreger, M., Wood, S., and Breen, J. (2001). Development of a Precast Bent Cap System. Report No. 1748-02. Center for Transportation Research, The University of Texas at Austin. Megally, S. H., Silva, P. F., and Seible, F. (2002). Seismic Response of Sacrificial Shear Keys in Bridge Abutments. Structural Systems Research Project. Report No. SSRP-2001/23. University of California, San Diego. Mistry, V., and Mangus, A. (2006). Get In, Stay In, Get Out, Stay Out. Public Roads, 70(3). Moreell, B. (1935). Articulations for Concrete Structures—the Mes- nager Hinge. ACI Journal Proceedings, 31(3), pp. 368–381. Motaref, S., Saiidi, M. S., and Sanders, D. (2010). Experimental Study of Precast Bridge Columns with Built-in Elastomer. In Transporta- tion Research Record: Journal of the Transportation Research Board, No. 2202, Transportation Research Board of the National Acade- mies, Washington, DC, pp. 109–116. Moustafa, S. (1974). Ductile Pullout Connections. Report No. 74-B11. Concrete Technology Associates (Now available from Precast Pre- stressed Concrete Institute). Nakaki, S., Stanton, J., and Sritharan, S. (1999). An Overview of the PRESSS Five-Story Precast Test Building. PCI Journal, 44(2), pp. 26–39.

Nelson, M., Lai, Y. C., and Fam, A. (2008). Moment Connection of Con- crete-Filled Fiber Reinforced Polymer Tubes by Direct Embedment into Footings. Advances in Structural Engineering, 11(5), pp. 537–547. Osanai, Y., Watanabe, F., and Okamoto, S. (1996). Stress Transfer Mech- anism of Socket Base Connections with Precast Concrete Columns. ACI Structural Journal, 93(3), pp. 266–276. Ou, Y. C., Chiewanichakorn, M., Ahn, I. S., Aref, A. J., Chen, S. S., Filiatrault, A., and Lee, G. C. (2006). Cyclic Performance of Precast Concrete Segmental Bridge Columns: Simplified Analytical and Finite Element Studies. In Transportation Research Record: Journal of the Transportation Research Board, No. 1976(1), Transportation Research Board of the National Academies of Sciences, Washington, DC, pp. 66–74. Ou, Y. C., Tsai, M. S., Chang, K. C., and Lee, G. C. (2010a). Cyclic Behavior of Precast Segmental Concrete Bridge Columns with High Performance or Conventional Steel Reinforcing Bars as Energy Dis- sipation Bars. Earthquake Engineering & Structural Dynamics, 39, pp. 1181–1198. Ou, Y. C., Wang, P. H., Tsai, M. S., Chang, K. C., and Lee, G. C. (2010b). Large-Scale Experimental Study of Precast Segmental Unbonded Posttensioned Concrete Bridge Columns for Seismic Regions. Jour- nal of Structural Engineering, 136(3), pp. 255–264. Pang, J., Steuck, K., Cohagen, L., Eberhard, M., and Stanton, J. (2008). Rapidly Constructible Large-Bar Precast Bridge-Bent Seismic Con- nection. Report No. WA-RD 684.2. Washington State Transporta- tion Center (TRAC). Pang, J. B. K., Eberhard, M. O., and Stanton, J. F. (2010). Large-Bar Connection for Precast Bridge Bents in Seismic Regions. Journal of Bridge Engineering, 15(3), pp. 231–239. Park, R. (2011). ABC in Utah, Accelerated Bridge Construction: Research, Design, and Practice Workshop. Presented at the 90th Annual Meet- ing of the Transportation Research Board, Washington, DC. Patty, J, Seible, F. and Uang, C. (2001). Seismic Response of Integral Bridge Connections. Report No. SSRP 2000/16. Structural Systems Research Project, University of California, San Diego, June. Paulson, C., and Hanson, J. M. (1991). Fatigue Behavior of Welded and Mechanical Splices in Reinforcing Steel. NCHRP Project 10-35 Final Report. National Cooperative Highway Research Pro- gram. Transportation Research Board of the National Academies, Washington, DC. PCI Bridge Design Manual. (2004). Precast/Prestressed Concrete Insti- tute. Chicago, IL. PCI Design Handbook—Precast and Prestressed Concrete. (2004). (6th ed.) Precast/Prestressed Concrete Institute, Chicago, IL. PCI Northeast. (2006). Guidelines for Accelerated Bridge Construction using Precast/Prestressed Concrete Components. Report No. PCINER- 06-ABC. Precast/Prestressed Concrete Institute, Chicago, IL. PCI Seismic Design Subcommittee. (2010). The State of the Practice Report of Seismic Bridge Design with Precast Members (Final Draft Report). Precast/Prestressed Concrete Institute, Chicago, IL. Priestley, M. J. N., Sritharan, S., Conley, J. R., and Pampanin, S. (1999). Preliminary Results and Conclusions from the PRESSS Five-Story Precast Concrete Test Building. PCI Journal, 44(6), pp. 42–67. Proc., Special International Workshop on Seismic Connection Details for Segmental Bridge Construction. (2009). MCEER. University of Buf- falo, State University of New York. Ralls, M. L. (2006). Framework for Prefabricated Bridge Elements and Sys- tems (PBES) Decision-Making. http://www.fhwa.dot.gov/bridge/ prefab/framework.cfm. Accessed Dec. 2, 2010. Ralls, M. L., Tang, B. M., Bhide, S., Brecto, B., Calvert, E., Capers, H., Dorgan, D., Matsumoto, E., Napier, C., Nickas, W., and Russell, H. (2005). Prefabricated Bridge Elements and Systems in Japan and Europe. Report No. FHWA-PL-05-003. Federal Highway Admin- istration. Washington, DC. Raynor, D. J., Lehman, D. E., and Stanton, J. F. (2002). Bond-Slip Response of Reinforcing Bars Grouted in Ducts. ACI Structural Journal, 99(5), pp. 568–576. Restrepo, J., Matsumoto, E., and Tobolski, M. (2011). NCHRP Report 681: Development of Precast Bent Cap Systems for Seismic Regions. Transportation Research Board of the National Academies, Washington, DC. Riva, P. (2006). Seismic Behaviour of Precast Column-to-Foundation Grouted Sleeve Connections. Proc., International Conference on Advances in Engineering Structures, Mechanics & Construction, Waterloo, Ontario, Canada, pp. 121–128. Roeder, C. W. (2010). Personal Communication with John Stanton. University of Washington. Seattle. Roeder, C. W., and Lehman, D. E. (2008). An Economical and Efficient Foundation Connection for Concrete Filled Steel Tube Piers and Columns. Composite Construction in Steel and Concrete VI, Granby, CO. Roeder, C. W., Lehman, D. E., and Bishop, E. (2010). Strength and Stiffness of Circular Concrete-Filled Tubes. Journal of Structural Engineering, 136(12), pp. 1545–1553. Roeder, C. W., Lehman, D. E., and Thody, R. (2009). Composite Action in CFT Components and Connections. AISC Engineering Journal, 47(4), pp. 229–242. Roh, H., and Reinhorn, A. M. (2010). Hysteretic Behavior of Precast Segmental Bridge Piers with Superelastic Shape Memory Alloy Bars. Engineering Structures, 32(10), pp. 3394–3403. Rowell, S. P., Grey, C. E., Woodson, S. C., and Hager, K. P. (2009). High Strain-Rate Testing of Mechanical Couplers. Report No. ERDC TR- 09-8. U.S. Army Corps of Engineers. Port Hueneme, CA. Sadeghian, P., and Fam, A. (2010). Bond-Slip Analytical Formulation toward Optimal Embedment of Concrete-Filled Circular FRP Tubes into Concrete Footings. Journal of Engineering Mechanics, 136(4), pp. 524–533. Saiidi, M. S., O’Brien, M., and Mahmoud, S. (2009). Cyclic Response of Concrete Bridge Columns using Superelastic Nitinol and Bendable Concrete. ACI Structural Journal, 106(1), pp. 69–77. Saiidi, M. S., and Wang, H. (2006). Exploratory Study of Seismic Response of Concrete Columns with Shape Memory Alloys Rein- forcement. ACI Structural Journal, 103(3), pp. 435–442. Salsa, D. E., and Salvadori, J. E. (2010). Route 36 Highlands Bridge Replacement. Aspire, Summer, pp. 26–28. Snyder, R., and Sritharan, S. (2010a). Caltrans Project 05-0160—Seismic Performance of an I-Girder to Inverted-T Bent Cap Connection: A Summary of the Horizontal Load Test of the Inverted-T Test Unit. Iowa State University, Ames. Snyder, R., and Sritharan, S. (2010b). Caltrans Project 05-0160—Seismic Performance of an I-Girder to Inverted-T Bent Cap Connection: A Summary of the Vertical Load Test of the Inverted-T Test Unit. Iowa State University, Ames. Splice Sleeve Japan Ltd. (Undated). Tests on Re-Bar Splices in Reinforced Concrete Columns using NMB Splice Sleeves. Report No. NPD-024 (Unpublished). Sritharan, S. (2005a). Improved Seismic Design Procedure for Con- crete Bridge Joints. Journal of Structural Engineering, 131(9), pp. 1334–1344. Sritharan, S. (2005b). Strut-and-Tie Analysis of Bridge Tee Joints Sub- jected to Seismic Actions. Journal of Structural Engineering, 131(9), 1321–1333. 52

Utah Department of Transportation (UDOT). (2009a). ABC SPMT Process Manual and Design Guide. UDOT. Salt Lake City, UT. Utah Department of Transportation. (2009b). Precast Piers and Foot- ings. http://dot.utah.gov. Accessed Sept. 24, 2010. Utah Department of Transportation. (2009c). SPMT Typical Details. http://dot.utah.gov. Accessed Sept. 24, 2010. Utah Department of Transportation. (2010). Precast Substructure Ele- ments Manual. http://dot.utah.gov. Accessed Sept. 24, 2010. Wacker, J. M., Hieber, D. G., Stanton, J. F., and Eberhard, M. O. (2005). Design of Precast Concrete Piers for Rapid Bridge Construc- tion in Seismic Regions. Report No. WA-RD 629.1. Washington State Transportation Center (TRAC). Walsh, K., and Kurama, Y. (2010). Behavior of Unbonded Post- Tensioning Monostrand Anchorage Systems under Monotonic Tensile Loading. PCI Journal, 55(1), 97–117. Wang, J. C., Ou, Y. C., Chang, K. C., and Lee, G. C. (2008). Large-scale Seismic Tests of Tall Concrete Bridge Columns with Precast Segmen- tal Construction. Earthquake Engineering & Structural Dynamics, 37(12), pp. 1449–1465. Wassef, W. G., and Davis, D. (2004). NCHRP Report 527: Integral Steel Box-Beam Pier Caps. Transportation Research Board of the National Academies, Washington, DC. Wipf, T., Klaiber, W., and Hockerman, S. (2009). Precast Concrete Ele- ments for Accelerated Bridge Construction—Volume 1-1 Laboratory Testing of Precast Substructure Components: Boone County Bridge. Report No. IHRB Project TR-561. Bridge Engineering Center. Iowa State University, Ames. Youssef, M. A., Alam, M. S., and Nehdi, M. (2008). Experimental Inves- tigation on the Seismic Behavior of Beam-Column Joints Reinforced with Superelastic Shape Memory Alloys. Journal of Earthquake Engi- neering, 12(7), pp. 1205–1222. Zhu, P., and Ma, Z. J. (2010). Selection of Durable Closure Pour Materials for Accelerated Bridge Construction. Journal of Bridge Engineering, 15(6), pp. 695–704. Zhu, Z., Ahmad, I., and Mirmiran, A. (2006). Seismic Performance of Concrete-Filled FRP Tube Columns for Bridge Substructure. Journal of Bridge Engineering, 11(3), pp. 359–370. Zhu, Z., Mirmiran, A., and Saiidi, M. S. (2006). Seismic Performance of Reinforced Concrete Bridge Substructure Encased in Fiber Composite Tubes. In Transportation Research Record: Journal of the Transportation Research Board, No. 1976(1), Transporta- tion Research Board of the National Academies, Washington, DC, pp. 197–206. 53 Sritharan, S., and Ingham, J. (2003). Application of Strut-and-Tie Con- cepts to Concrete Bridge Joints in Seismic Regions. PCI Journal, 48(4), pp. 66–80. Sritharan, S., Priestley, M. J. N., and Seible, F. (1999). Enhancing Seis- mic Performance of Bridge Cap Beam-to-Column Joints using Pre- stressing. PCI Journal, 44(4), pp. 74–91. Sritharan, S., Priestley, M. J. N., and Seible, F. (2001). Seismic Design and Experimental Verification of Concrete Multiple Column Bridge Bents. ACI Structural Journal, 98(3), pp. 335–346. Sritharan, S., Vander Werff, J., Abendroth, R. E., Wassef, W. G., and Greimann, L. F. (2005). Seismic Behavior of a Concrete/Steel Inte- gral Bridge Pier System. Journal of Structural Engineering, 131(7), pp. 1083–1094. Stamnas, P. E., and Whittemore, M. D. (2005). All-Precast Substruc- ture Accelerates Construction of Prestressed Concrete Bridge in New Hampshire. PCI Journal, 50(3), pp. 26–39. Stanton, J. (2010). Unbonded Pretensioned Hybrid Concept. Presented at the PEER Annual Meeting, San Francisco, CA. Stanton, J., Eberhard, M., and Steuck, K. (2006). Rapid Construction Details for Bridges in Seismic Zones. Proc., 8th US National Con- ference on Earthquake Engineering, San Francisco, CA. Stanton, J., Stone, W. C., and Cheok, G. S. (1997). Hybrid Reinforced Precast Frame for Seismic Regions. PCI Journal, 42(2), pp. 20–32. Steuck, K. P., Eberhard, M. O., and Stanton, J. F. (2009). Anchorage of Large-Diameter Reinforcing Bars in Ducts. ACI Structural Journal, 106(4), pp. 506–513. Steuck, K. P., Pang, J., Eberhard, M., and Stanton, J. (2008). Anchorage of Large-Diameter Reinforcing Bars Grouted into Ducts. Report No. WA- RD 684.1. Washington State Transportation Center (TRAC). Stone, W. C., Cheok, G. S., and Stanton, J. F. (1995). Performance of Hybrid Moment-Resisting Precast Beam-Column Concrete Con- nections Subjected to Cyclic Loading. ACI Structural Journal, 92(2), pp. 229–249. Taira, Y., Sakai, J., and Hoshikuma, J. (2009). A Study on Restorable Precast and Prestressed Hybrid Piers. Proc., Special International Workshop on Seismic Connection Details for Segmental Bridge Con- struction, Seattle, WA, pp. 21–26. Tang, B. M. (2007). Accelerated Bridge Construction Technology. 23rd US—Japan Bridge Engineering Workshop, Tsukuba, Japan. Tobolski, M., Restrepo, J., Matsumoto, E., and Ralls, M. L. (2006). Devel- opment of Precast Bent Cap Concepts. Report No. SSRP-2006/10. University of California, San Diego. U.S. Department of Energy Technology Readiness Assessment Guide. (2009). Report No. DOE G 413.3-4. U.S. Department of Energy. Washington DC.

Next: Appendices A through J »
Application of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions Get This Book
×
 Application of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s National Cooperative Highway Research Program (NCHRP) Report 698: Application of Accelerated Bridge Construction Connections in Moderate-to-High Seismic Regions evaluates the performance of connection details for bridge members in accelerated bridge construction in medium-to-high seismic regions and offers suggestions for further research.

The following appendixes to NCHRP Report 698 were published in electronic format only.

Appendix A—Summary Sheets of Bar Coupler Connections

Appendix B—Summary Sheets of Grouted Duct Connections

Appendix C—Summary Sheets of Pocket Connections

Appendix D—Summary Sheets of Member Socket Connections

Appendix E—Summary Sheets of Hybrid Connections

Appendix F—Summary Sheets of Integral Connections

Appendix G—Summary Sheets of Emerging Technology and Deformable Element Connections

Appendix H—Detailed Evaluation of Connection Types

Appendix I—Questionnaires

Appendix J—2012 Research Problem Statement

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!