National Academy of Sciences | 150 Year Anniversary

Questions? Call 800-624-6242

| Items in cart [0]

The National Academies Press

Rights & Permissions

topleft topright

ACRP Report 37A: Guidebook for Measuring Performance of Automated People Mover Systems at Airports (2012)
Airport Cooperative Research Program (ACRP)

Citation Manager

Transportation Research Board. "4.1.3 Select APM Systems for Site Visits." ACRP Report 37A: Guidebook for Measuring Performance of Automated People Mover Systems at Airports. Washington, DC: The National Academies Press, 2012.

Please select a format:

BibTeX EndNote RefMan


Page
88
bottomleft bottomright
Page
88
Front Matter (R1-R10)
Summary (1-3)
1.1 Research Approach (4-5)
2.3 How to Use This Guidebook (6-6)
2.4 Other ACRP Reports (7-7)
3.1.1 Legal Precedents (8-8)
3.1.2 O&M Contract Durations (9-9)
3.2 Procurement of O&M Services: Contractual Options (10-10)
3.2.3 Option 3: In-Sourcing O&M Services to Airport Staff (11-11)
3.3 Measurement of O&M Procurement Methodology Criteria (12-12)
3.3.1 Measurement Factor: Cost (13-13)
3.3.2 Measurement Factor: Risk (14-15)
3.3.3 Measurement Factor: Other (16-17)
3.3.4 Summary (18-18)
3.4 O&M Contract's Relationship to Performance Measurement (19-19)
4.1.1 Applied Methods (20-21)
4.1.2 Theoretical Methods (22-22)
4.2 Characteristics of Effective Performance Measurement Systems for APM Systems at Airports (23-23)
5.1.3 Routes Operated in Maximum Service (24-24)
5.2 Service Descriptive Characteristics (25-25)
5.2.4 Vehicles Available for Maximum Service (26-26)
5.3.1 Airport APM Performance Measure #1: Service Availability (Tier A Approach) (27-29)
5.3.2 Airport APM Performance Measure #1: Service Availability (Tier B Approach) (30-33)
5.3.3 Airport APM Performance Measure #1: Service Availability (Tier C Approach) (34-37)
5.3.4 Airport APM Performance Measure #2: Safety Incidents per 1,000 Vehicle Service Miles (38-39)
5.3.5 Airport APM Performance Measure #3: O&M Expense per Vehicle Service Mile (40-41)
5.3.6 Airport APM Performance Measure #4: Actual and Scheduled Capacity (Peak Versus All Other) (42-43)
5.3.7 Airport APM Performance Measure #5: Passenger Satisfaction (44-45)
5.3.8 Airport APM Performance Measure #6: Missed Stations per 1,000 Station Stops (46-47)
5.3.9 Airport APM Performance Measure #7: Unintended Stops per 1,000 Interstations (48-49)
6.1 Internal Measures for Assessing and Improving Performance of Airport APM Systems (50-50)
6.2 Measures for Planning and Designing Airport APM Systems (51-51)
7.2 Administrative and Funding Issues (52-52)
7.3 Airport Participation Issues (53-53)
7.4 Data Collection and Reporting Issues (54-54)
7.5 Conclusions (55-55)
Bibliography (56-56)
Acronyms and Abbreviations (57-57)
Exhibit A - Form A, Form B, and Passenger Satisfaction Survey (58-62)
Appendix A (63-65)
Section 1 - Preface (66-66)
2.1.1 Balanced Scoreboard (67-67)
2.2.1 Applied Methods (68-68)
2.2.1.2 Contract Service Dependability Method (69-69)
2.2.1.3 System Service Availability Method (70-70)
2.2.2.2 Defining and Measuring Service Availability for Complex Transportation Networks (71-71)
2.3.1 Historical Development (72-72)
2.3.2.2 Conferences on Transportation Performance Measures (73-73)
2.3.2.3 National Transit Database (74-74)
2.4 Airline Performance Measurement (75-75)
2.4.1 Government-Monitored Measures (76-76)
2.4.2 Airport Operator/Airline Measures (77-77)
2.5.1 FHWA Performance Measurement Program (78-79)
2.5.1.2 Buffer and Planning Time Indices (80-80)
2.5.2.3 Throughout (81-81)
2.6 Conclusion (82-83)
3.2 APMs (84-84)
3.4 Airlines (85-85)
3.5 Highways (86-86)
4.1.3 Select APM Systems for Site Visits (87-88)
4.2.2 Conduct Site Visits (89-89)
4.3.3 Step 3: Report to ACRP Panel on Participation Ratio (90-90)
4.3.10 Step 10: Transmit Thank-You Letters to Respondents (91-91)
5.1.2 Section 2: Performance Measures (92-92)
5.1.4 Section 4: Suggestions for Improving APM Performance Measures (93-93)
5.1.5 Section 5: System and Operating Characteristics (94-94)
5.2.2 System and Operating Characteristics (95-99)
5.2.4 Performance Measures (100-104)
5.2.6 Suggestions for Improving Airport APM Performance Measures (105-105)
Section 6 - Airport APM Survey (106-125)
Abbreviations used without definitions in TRB publications (126-126)