National Academy of Sciences | 150 Year Anniversary

Questions? Call 800-624-6242

| Items in cart [0]

The National Academies Press

Rights & Permissions

topleft topright

NCHRP Synthesis 425: Waterproofing Membranes for Concrete Bridge Decks (2012)
National Cooperative Highway Research Program Synthesis Program (NCHRPSYN)

Citation Manager

Russell, Henry G, Transportation Research Board. "9. PERFORMANCE." NCHRP Synthesis 425: Waterproofing Membranes for Concrete Bridge Decks. Washington, DC: The National Academies Press, 2012.

Please select a format:

BibTeX EndNote RefMan


Page
47
bottomleft bottomright
Page
47

Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.

OCR for page 47
37 17. Does your agency have special inspection practices during installation of waterproofing membrane systems? ( ) Yes ( ) No If any answer to Questions 15, 16, or 17 is Yes, please provide the specifications or practices. This information may be submitted in the box below as a written description or link(s) to document(s). ____________________________________________________________________ ____________________________________________________________________ or upload as a file (up to 1MB per file). Additional files may be uploaded in Question 25. 8. COSTS 18. If available, please provide the unit cost (labor, equipment, and materials) for the waterproofing membrane system only for each project during the past five years. Please list as many as possible. Project Unit Cost, New or Name $/sq ft Existing Deck 1 2 3 4 5 6 7 8 9 10 9. PERFORMANCE 19. What defects has your agency observed in the performance of waterproofing membranes on new concrete bridge decks? YesNo Lack of adhesion between the waterproofing membrane and the concrete deck Lack of adhesion between the waterproofing membrane and the asphalt surface Punctured waterproofing membranes Membrane blistering Horizontal shear failure at the membrane Cracks in the waterproofing membrane Voids under the waterproofing membrane Reinforcement corrosion Moisture penetration through the membrane but cause unknown Other