National Academies Press: OpenBook
« Previous: Appendix E Glossary of Estimating Terms Used by Federal Agencies
Suggested Citation:"References." National Research Council. 1990. Improving the Accuracy of Early Cost Estimates for Federal Construction Projects. Washington, DC: The National Academies Press. doi: 10.17226/1693.
×
Page 43
Suggested Citation:"References." National Research Council. 1990. Improving the Accuracy of Early Cost Estimates for Federal Construction Projects. Washington, DC: The National Academies Press. doi: 10.17226/1693.
×
Page 44

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

REFERENCES 43 References Adrian, James. 1982. Construction Estimating. Englewood Clifts, NJ: Reston Publications. American Association of Cost Engineers. 1986. Cost Engineering Notebook. Morgantown, WV: American Association of Cost Engineers. American Society of Professional Estimators. 1987. Standard Estimating Practice. Alexandria, VA: American Society of Professional Estimators. Bowen, Brian. 1984. Design and construction cost management. In Architects Handbook of Professional Practice. Washington, DC: American Institute of Architects. Bridges, Larry, and Rita Gregory. 1988. Accuracy of Cost Estimating Techniques (staff summary sheet). Tyndall Air Force Base, FL: Air Force Engineering and Services Center. Committee on Improving Preliminary Planning/Programming in the Building Delivery Cycle. 1986. Programming Practices the Building Process. Washington, DC: National Academy Press. Consulting Committee on Cost Engineering. 1983. Probabilistic Estimating in the Building Process (Federal Construction Council Technical Report No. 72). Washington, DC: National Academy Press. Consulting Committee on Cost Engineering. 1987. Procedures Used By Federal Agencies to Prepare Budget Estimates for Construction (Federal Construction Council Technical Report No. 85). Washington, DC: National Academy Press. Consulting Committee on Planning and Design Terminology. 1988. Glossary of Special Terms Used in Planning, Designing and Constructing Federal Facilities (Federal Construction Council Technical Report No. 91). Washington, DC: National Academy Press. Cost/Schedule Controls Task Force. 1986. Scope Definition and Control. Austin, TX: Construction Industry Institute. Curran, Michael W. 1988. Range estimating: conquering the cost overrun. DE Technology, 49(3). Hanscomb Associates, Inc. 1986. Indian Health Service Budget Cost Estimating System (Instruction Manual, Revision 3.0). Rockville, MD: Department of Health and Human Services. Helmer, Olaf. 1968. Analysis of the future: the delphi method. In Technological Forecasting for Industry and Government, James Bright, ed. Englewood Cliffs, NJ: Prentis-Hall. Jelen, Frederick C., and James H. Black. 1982. Cost and Optimization Engineering (2nd Edition). New York, NY: McGraw-Hill. Parker, Donald E. 1984. Budgeting by Criteria Not Cost Per Square Foot (Conference Paper). Morgantown, WV: American Association of Cost Engineers. Parker, Donald E. 1987. Defining Project Scope for Effective Cost Control (Cost Engineers'

REFERENCES 44 Notebook). Morgantown, WV: American Association of Cost Engineers. Public Buildings Service. 1981. Capitalized Income Approach to Project Budgeting. Washington, DC: U.S. General Services Administration. Public Buildings Service. 1987. General Construction Cost Review Guide for Federal Office Buildings—Fiscal Year 1988. Washington, DC: U.S. General Services Administration. RS Group, Inc. 1983. CCMAS Cost Guide (Cost Guide Primer and Cost Guide Direct Cost Modifiers). Washington, DC: United States Air Force/HQAFESC. Standing Committee on Contract Management. 1982. Preliminary planning for construction projects. In Transactions of the Federal Construction Council for 1980-81. Washington, DC: National Academy Press. Tri-Service Committee on Cost Estimating. 1988. Area Cost Factors and Unit Prices for FY 1990-1991 Department of Defense Facilities Construction (Memo dated 10 March 1988 from Douglas Forbrother). Washington, DC: Office of the Assistant Secretary of Defense. True, Newton F., and Ronald A. Barry. 1985. Contemporary Estimating. American Power Conference Proceedings. Chicago, IL: Illinois Institute of Technology.

Improving the Accuracy of Early Cost Estimates for Federal Construction Projects Get This Book
×
 Improving the Accuracy of Early Cost Estimates for Federal Construction Projects
Buy Paperback | $40.00
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!