Suggested Citation:"Appendix D Issues Addressed by a Building Life-Cycle Cost Management System." National Research Council. 1991. Pay Now or Pay Later: Controlling Cost of Ownership from Design Throughout the Service Life of Public Buildings. Washington, DC: The National Academies Press. doi: 10.17226/1750.
×

APPENDIX D
ISSUES ADDRESSED BY A BUILDING LIFE-CYCLE COST MANAGEMENT SYSTEM

A building life-cycle cost management system could be useful in addressing a number of issues raised in decision making at legislative, administrative, and technical levels. The following list represents the committee's suggestions of these issues that a life-cycle cost management system might be designed to address.

Legislative Level

  1. Justification of budget requests. Legislators are faced with a variety of competing demands and those that "make the case" in a clear, properly supported manner are likely to receive more favorable consideration.

  2. Effects of reduced capital or maintenance funding. Legislators may ask what the short-and long-term effects are of less funds, perhaps even zero capital budget, and should be able to get answers to questions related to deterioration of service, extra maintenance, early replacement costs, and effects on users.

  3. Effects of deferring work or lowering service standards. The frequent consequence of reduced funding is deferral of maintenance and rehabilitation, or lowering the standards of acceptable service; a management system should forecast the effects of such decisions.

  4. Effects of budget request on future status of the portfolio. If a program funding request is not approved, will the average building service conditions deteriorate? Alternatively, what level of funding is required to keep the portfolio in its present condition or to reduce a backlog of deferred maintenance?

Suggested Citation:"Appendix D Issues Addressed by a Building Life-Cycle Cost Management System." National Research Council. 1991. Pay Now or Pay Later: Controlling Cost of Ownership from Design Throughout the Service Life of Public Buildings. Washington, DC: The National Academies Press. doi: 10.17226/1750.
×
  1. Effects of increased utilization and occupancy. How will service conditions and operating and maintenance costs be affected?

Administrative Level

  1. Priority programming of improvements. Enhanced justification for capital and operating budget requests.

  2. Summary condition assessment of the current portfolio. Objective aggregate measures, with graphical and tabular displays, based on inventory measurements.

  3. Response to legislative inquiries. Quantitative estimation of effects of alternate budget levels.

  4. Management planning. Quantitative assessment of effects of deferring maintenance or rehabilitation, future status of portfolio under alternate funding scenarios, and manpower requirements.

  5. Interface of facility management and overall agency management. Budget coordination and justification, procurement planning, and staffing logistics.

Technical Level

  1. Portfolio condition and operations performance data. On-line monitoring of operations and maintenance activities and facility condition.

  2. Projected maintenance planning. Forecasting response to use and occupancy, condition survey, routine practices, and external factors (e.g., energy prices).

  3. Service standards. Assessing criteria for minimum service, maximum loading or use, and maximum distress.

  4. Purchasing and retrofit decisions. Consequences of new materials and products, bulk purchasing, and replacement by retrofit versus attrition.

Suggested Citation:"Appendix D Issues Addressed by a Building Life-Cycle Cost Management System." National Research Council. 1991. Pay Now or Pay Later: Controlling Cost of Ownership from Design Throughout the Service Life of Public Buildings. Washington, DC: The National Academies Press. doi: 10.17226/1750.
×
Page 53
Suggested Citation:"Appendix D Issues Addressed by a Building Life-Cycle Cost Management System." National Research Council. 1991. Pay Now or Pay Later: Controlling Cost of Ownership from Design Throughout the Service Life of Public Buildings. Washington, DC: The National Academies Press. doi: 10.17226/1750.
×
Page 54
Pay Now or Pay Later: Controlling Cost of Ownership from Design Throughout the Service Life of Public Buildings Get This Book
×
Buy Paperback | $40.00
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

Buildings and other public facilities can have very long and productive service lives, providing efficient shelter and serving a wide range of activities. To do so, however, these facilities must be managed effectively, in a manner consistent with key design decisions.

A variety of political and technical obstacles to effective management raise the public's total cost of ownership for these facilities, particularly when actions to deal with short-term government budget deficits have long-term, high-cost consequences.

This book identifies obstacles to controlling the costs of ownership and suggests ways these obstacles can be overcome.

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    Switch between the Original Pages, where you can read the report as it appeared in print, and Text Pages for the web version, where you can highlight and search the text.

    « Back Next »
  6. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  7. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  8. ×

    View our suggested citation for this chapter.

    « Back Next »
  9. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!