Table 2-1 |
Recommendations and Conclusions from the 1982 NRC Report and Action to Date. |
|||
|
Figure 3-1 |
Unified Command Structure. |
|||
|
Figure B-1 |
Decision Tree. |
|||
|
Figure I-1 |
Wind and sea scale for fully arisen sea. |
|||
|
Figure I-2 |
East Coast Onshore Wave Height Probability Distribution. |
|||
|
Figure I-3 |
U.S. Gulf Coast Onshore Wave Height Probability Distribution. |
|||
|
Figure I-4 |
California Onshore Wave Height Probability Distribution. |
|||
|
Figure I-5 |
Pacific Northwest Onshore Wave Height Probability Distribution. |
|||
|
Figure I-6 |
Gulf of Alaska Onshore Wave Height Probability Distribution. |
|||
|
Figure I-7 |
80- to 280-MDWT tanker wave drift force. |
|||
|
Figure I-8 |
80- to 280-MDWT tanker wind force. |
|||
|
Figure I-9 |
Tug power estimate required to hold 80-MDWT fully loaded tanker. |
|||
|
Figure I-10 |
Tug power estimate required to hold 140-MDWT fully loaded tanker. |
|||
|
Figure I-11 |
Tug power estimate required to hold 280-MDWT fully loaded VLCC. |