TABLE 6.2a Major Upgrades and New Facilities Under or Approved for Construction-Facilities Upgrades

Laboratory, Project

Operational Goal

Start of Operations

Location

Fermi National Accelerator Laboratory, Main Injector

Proton-antiproton collisions at 2,000 GeV and 2 × 1032 cm−2 s−l

120-GeV protons for stationary target operations

1999

Batavia. Illinois

Stanford Linear Accelerator Center, PEP-II

Asymmetric electron-positron collisions at 10 GeV and 3 × 1033 cm−2 s−1

1999

Palo Alto. California

Cornell University. CESR

Symmetric electron-positron collisions at 10 GeV and 2 × 1033 cm−2 s−1

1998

Ithaca, New York

CERN, LEP-II

Electron-positron collisions at 192 GeV and 1 × 1032 cm−2 s−l

1998

Geneva, Switzerland

KEK, B Factory

Asymmetric electron-positron collisions at 10 GeV and 3 × 1033 cm−2 s−1

1999

Tsukuba, Japan

TABLE 6.2b Major Upgrades and New Facilities Under or Approved for Construction-New Facilities

Laboratory, Project

Operational Goal

Start of Operations

Location

Brookhaven National Laboratory, RHIC

Polarized proton-proton collisions at 500 GeV and 2 × 1032 cm−2 s−l

2000

Upton, New York

Frascati, DAPHNE

Symmetric electron-positron collisions at I GeV and 5 × 1032 cm−2 s−1

1998

Frascati Italy

CERN, LHC

Proton-proton collisions at 14,000 GeV and 1 × 1034 cm−2 s−1

2005

Switzerland



The National Academies | 500 Fifth St. N.W. | Washington, D.C. 20001
Copyright © National Academy of Sciences. All rights reserved.
Terms of Use and Privacy Statement