Appendix B
Cost Analysis of Selected Studies, 1986-1996

 

 

Average Cost ($1,000s)

Project Purpose

Number of Projects

Reconnaissance

Feasibility

Shoreline beach Protection

2

442.5

1,346.0

Navigation/shallow draft

5

196.2

602.0

Navigation/inland waterways

3

126.7

1,991.7

Navigation/deep draft

10

268.8

1,861.6

Navigation/other

1

220.0

660.0

Hurricane damage protection

4

503.8

1,026.5

Flood damage protection

27

301.0

1,548.2

Environmental

2

225.0

1,830.0

Total Average

54

291.6

1,830.0

 

Source: Corps data.



The National Academies | 500 Fifth St. N.W. | Washington, D.C. 20001
Copyright © National Academy of Sciences. All rights reserved.
Terms of Use and Privacy Statement



Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.

OCR for page 99
--> Appendix B Cost Analysis of Selected Studies, 1986-1996     Average Cost ($1,000s) Project Purpose Number of Projects Reconnaissance Feasibility Shoreline beach Protection 2 442.5 1,346.0 Navigation/shallow draft 5 196.2 602.0 Navigation/inland waterways 3 126.7 1,991.7 Navigation/deep draft 10 268.8 1,861.6 Navigation/other 1 220.0 660.0 Hurricane damage protection 4 503.8 1,026.5 Flood damage protection 27 301.0 1,548.2 Environmental 2 225.0 1,830.0 Total Average 54 291.6 1,830.0   Source: Corps data.