Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 125
Appendix B
Contributors to the Study
Baltimore Region Rapid Transit System
Mass Transit Administration
Baltimore, Maryland
Frank Hoppe, Director of Construction
Bay Area Rapid Transit District
Oakland, California
F.J. Linville, Manager of Construction
Brunswick Mining and Smelting Corporation Ltd
Mining Division
Bathurst, New Brunswick, Canada
D.C. Walsh, Project Engineer
Bureau de Transport Metropolitain
Montreal, Quebec, Canada
Gerard Gascon, Director
California Department of Water Resources
Sacramento, California
Sam Lion, Project Engineer
Corps of Engineers, U.S. Army
New England Division
Waltham, Massachusetts
Joe B. Fryar, Chief, Engineering Division
Corps of Engineers, U.S. Army-
North Pacific Division
Portland, Oregon
Lewis Gustafson, Division Geologist
Corps of Engineers, U.S. Army
Southwestern Division
Dallas, Texas
Lawson Jackson, Division Geologist
125
OCR for page 126
Department of Environmental Protection
City of New York
New York, New York
Joseph T. McGough, Jr ., Commissioner
Los Angeles County Sanitation Distr Act
Los Angeles, California
(documents examined in files open to the public)
Massachusetts Bay Transportation Authority
Boston, Massachusetts
Frank Keville, Director of Construction
Metropolitan Atlanta Rapid Transit Authority
Atlanta, Georgia
James F. Fraser, Director of Engineering
Metropolitan Sanitary District of Greater Chicago
Chicago, Illinois
Frank E. Dalton, Deputy Chief Engineer
Metropolitan Water District of Southern California
Los Angeles, California
Robert Moehle, Chief Engineer
Metropolitan Works Department
Toronto, Ontario, Canada
F.J. Horgan, Commissioner
Milwaukee Metropolitan Sewerage District
Milwaukee, Wisconsin
Peter J. Peters, Senior Project Administrator--Interceptors
New York City Transit Authority
Brooklyn, New York
Stanley Kottick, Division Engineer
Niagara Frontier Transportation Authority
Metro Construction Division
Buffalo, New York
Theodore D. Beck, General Manager
Northeast Utilities
Hartford, Connecticut
Robert N. Smart, Manager of Generation Civil Engineering
Ontario Ministry of the Environment
Environmental Approvals and Project Engineering Branch
Toronto, Ontario, Canada
C.J.K. Wilson, Project Manager
126
OCR for page 127
Pacific Gas and Electric Company
San Francisco, California
Lawrence G. Rasmussen, Acting Manager, Civil-Hydro Construction
Public Service Company of New Hampshire
Manchester, New Hampshire
Bruce B. Beckley, Manager of Nuclear Projects
Rochester Pure Waters District
County of Monroe
Rochester, New York
Gerald McDonald, Director of Engineering
Sacramento Municipal Utility District
Sacramento, California
Lee Kielman, Project Manager
San Francisco Clean Water Program
San Francisco, California
Donald Birrer, Executive Director
Toronto Transit Commission
Toronto, Ontario, Canada
Stanley T. Lawrence, General Manager, Subway Engineering and
Construction
U.S. Bureau of Reclamation
Engineering and Research Center
Denver, Colorado
Kenneth D. Schoeman, Head, Tunnels Section
U.S. Bureau of Reclamation
Upper Colorado Regional Office
Salt Lake City, Utah
Albert H. Pfeifle, Contracting Officer
U.S. Department of Energy
Albuquerque Operations Office
Albuquerque, New Mexico
J.M. McGough, Project Manager, WIPP Project Office
Washington Metropolitan Area Transit Authority
Washington, D.C.
John S. Egbert, Assistant General Manager, Design and Construction
Washington Suburban Sanitary Commission
Department of Engineering
Laurel, Maryland
Stephen B. Profilet, Director
127
Representative terms from entire chapter:
rapid transit