| Copyright © 2009. National Academy of Sciences. All rights reserved. Terms of Use and Privacy Statement |
Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 169
Glossary
Many tunneling and geological terms can have multiple, and even somewhat
contradictory, meanings. The following definitions have been written or
chosen to be consistent with usage in this report. Underlined words are
separately defined under their own entries. However, a few words are
generally not noted in this manner because they occur so frequently in
other def initions that underlining would prove a distraction. There-
fore, before proceeding to other entr ies in the glossary, the reader may
wish to refer to the definitions for "earth, n "ground, " crock, " "shaft,"
"soil, " and "tunnel. "
~A" LINE
A dimensional line in a tunnel, inside of which rock projections are
not permitted.
ADIT
(a) A short length of tunnel driven from the surface to the main tun-
nel for access or mucking out. (b) A short transverse tunnel con-
necting two parallel main tunnels; often called a "cross edit. n
ADVANCE
The distance excavated during a given time (shift or day) in tunnel-
ing, drifting, or in raising or sinking a shaft.
ARCH
The configuration of the upper portion of a tunnel section above the
springline; the crown, roof, or back of a tunnel.
"B. LINE
A dimensional line in a tunnel, outside of which excavation is not
paid for ; may also be referred to as the pay line.
BACK
The overhead portion of a tunnel, i.e., ceiling; less commonly used
than the synonymous term roof.
BEDDING
The arrangement of rocks in layers, strata, or beds of varying thick-
ness and character; usually applied to sedimentary rock, in which
case it is synonymous with "stratification. n
169
OCR for page 170
BED ROCK
(a) Any solid rock exposed at the surface of the earth or overlain by
unconsolidated material. (b) Rock of relatively great thickness and
extent in its native location.
BENCH
The lower portion of a tunnel which is constructed by first excavating
and supporting an upper portion and then excavating the lower portion.
A system used in larye-diameter or questionably stable tunnels.
BLOCKING
Blocks of wood or concrete installed between the lagging or steel
sets and the rock surfaces of a tunnel to transfer stress to the sup-
ports.
BLOCKY ROCK
Rock having joints or cleavage spaced and oriented in a manner such
that it readily breaks into loose blocks under excavation conditions.
BLOW OUT
The sudden escape of air from a tunnel driven under compressed air.
BOoMHEADER
1
A relatively soft-rock mining machine that can mine selectively and
cut any shape or size of tunnel by use of a cutting head on a hydrau-
lically controlled boom or arm that is generally centrally positioned
on the unit and extending cantilever-fashion in front of the machine
in such a way that it can be vertically raised or lowered or swung in
an arc from side to side.
BORE
In reference to construction operations, the making of a relatively
large hole in earth or rock with an excavating device, while removing
the muck mechanically or with the aid of gravity. Distinguished from
drill.
BOREABILITY
A value expressing the boring properties of rock in terms of the pen-
etration rate with certain numbers/types of cutters and amount of
.
pressure applied. Equivalent to "tunnelability," the ease or diffi-
culty with which a rock type can be penetrated by a tunnel boring
machine.
BOREHOLE, BORING -
An exploratory hole made in the earth with a drill, auger, or drive
sampler for the purpose of determining soil, rock or groundwater con-
ditions.
BOULDER
A detached and rounded or much-worn mass of rock greater than 10
inches in diameter, typically carried some distance from the parent
rock by natural forces and worn by a stream, ocean waves, or glacier,
or by weathering in situ.
BREAST BOARDS, BREASTING
Boards placed and braced temporarily across the face of a tunnel
drive to support incompetent materials.
BRIDGE ACTION TOME
The time that elapses between the exposure of an area at the roof of
a tunnel and the beginning of noticeable, unprovoked inward movement
of the ground above this area; sometimes described as "stand-up time."
170
OCR for page 171
CAVERN OR CHAMBER
A relatively short, underground room-type opening of large cross-
sectional area, generally built to house a special structure such as
a hydroelectric power plant, hardened defense facility or storage for
waste.
CHANGED CONDITION
Physical site condition revealed by excavation to be substantially
different from the condition that could reasonably be anticipated
from information in the contract documents . Common teas is for litiga-
tion by contractor, sometimes resulting in an extra paid by owner.
CHEMICAL GROUT
A combination of chemicals that gel into a semi-solid after they are
injected through drilled holes to strengthen incompetent ground (gen-
erally soil), or to prevent groundwater from flowing into the excava-
tion.
CIRCULAR TUNNEL
A tunnel of circular cross section, generally made with a full circu-
lar shield or tunnel boring machine.
,
COMPETENT GROUND
Ground that can stand for relatively long periods with no support or
only minimal support when a tunnel is excavated through it.
COMPRESSED AIR
Air supplied to the tunnel at greater than atmospheric pressure,
either to operate pneumatic tools or to facilitate tunneling in very
soft or wet ground. See also high air and low air.
CONSOLIDATED MATERIALS
Earth materials, generally of sedimentary origin, which have been
firmly densified or converted into rock by compaction, deposition of
cement in pore spaces, and/or by physical and chemical changes in the
constituents.
CONSOLIDATION
(a) In classical geology, any or all of the processes whereby loose,
soft, or liquid earth materials become firm and coherent. (b) In
soil mechanics, the adjustment of a saturated soil in response to in-
creased load involving the squeez ing of water from the pores and de-
crease in void ratio.
CONTRACT MODIFICATION
Change in a construction contract that either increases or decreases
the scope of work, amount of materials, or length of performance time
originally envisaged.
CONVENT TONAL MINING
Traditional, labor-intensive excavation such as hand mining in soft
ground and dr ill-and-blast mining in rock. Distinguished from the
more highly mechanized methods of mining.
CORE RECOVERY
In rock core drilling, the amount of the drilled rock withdrawn as
core (i.e., recovered); generally expressed as a percentage of the
cored interval or coring "run." Example: a 5-ft coring run that
yields 4 ft of rock core constitutes a recovery of 80 percent.
171
OCR for page 172
COVER
The material, including soil and/or rock, as measured along a perpen-
dicular from the tunnel crown to the ground surface. See also over-
burden.
CRoWN
The highest point of an arched tunnel cross section; the roof or back
of a tunnel.
CROWN BARS
Timbers or steel members cantilevered from previously installed sets
nearest the heading to temporarily support a rock tunnel roof while
the next set is being installed.
CUT—AND—COVER TUNNEL
A tunnel constructed by excavating a trench from the surface and then
decking it over, usually with timber, so that traffic can be main-
tained while the structure is built within the trench.
CUTTERHEAD
The rotating front end of a tunnel boring machine, serving as a mount
for the ground-abrading cutters.
DEEP SHAM
A shaft of relatively {but not formally defined) great depth, usually
associated with mines and underground waste storage and less often
with civil engineering projects which are relatively shallow. In
this report, a 1,225-ft deep penstock shaft used as a study project
might not be considered a "deep" shaft by some specialists.
DIFFERING SITE CONDITION
Same as changed condition.
DISC CUTTER
The most coIrunon type of roller cutter, taking the form of a single
circular disc or cutter blade of hardened steel alloy which revolves
freely about its axis as it rolls around the rock face. May carry
double or triple disc blades on a s ingle cutter mounting.
DRIFT
A mined passageway or portion of a tunnel. In the latter sense, de-
pend~ng upon its location in the final tunnel cross section, it may
be classified as a "crown drift," "side drift," "invert drift," etc.
DRILL
In reference to construction operations, the making of a relatively
small circular hole in earth or rock with a cutting tool, while re-
moving the cuttings by means of a circulating fluid. Distinguished
from bore.
DRILLABILITY
A specif ic value expressing the drilling properties of a rock in
terms of the penetration rate with a certain type of bit and feed
pressure.
DRILL-AND-BLAST
A method of excavating rock by drilling small-diameter holes on a
planned layout, packing these with explosives, and then firing to a
fixed program to shatter the rock in a desired form. Distinguished
from machine mining, mechanical excavation.
172
OCR for page 173
DRILL JUMBO
In drill-and-blast tunnel construction, a rubber-tired or track
mounted movable frame with platforms to support men and drills.
DRIVE
To excavate horizontally or at an inclination, as in a drift, tunnel,
edit, or entry. Distinguished from sink or raise.
EARTH
(a) Loose material of the earth's surface; the disintegrated parti-
cles of solid matter, as distinguished from rock. (b) Material which
can be removed and handled economically with pick and shovel or by
hand, or which can be loosened and removed with a power shovel. See
soil for related definition.
EARTH-BALANCE SHIELD
A closed-face shield designed for tunneling in fine-grained soils by
trapping excavated materials against the face and removing them at a
rate slow enough to maintain pressures that counterbalance earth
pressures, stabilize the face, and prevent ingress of water.
EARTH TUNNEL
A tunnel driven in relatively easily excavated earth or soil rather
than in rock. Also commonly referred to as a soft-ground tunnel.
EXPLORATORY SHAFT
A shaft constructed for the purpose of studying ground conditions in
the vicinity of a future underground opening.
EXTRA
Additional payment made to a contractor as a result of work or use of
materials beyond the scope of the original contract.
EXTRADOS
The exterior surface of an arch; in a tunnel it is the arch surface
lying against the excavated rock or soil surface.
FACE
The advance end or wall of a tunnel at which work is progressing.
FAULT
A fracture or fracture zone in the ground along which there has been
displacement of the two sides relative to one another, parallel to
the fracture. The displacement may be a few inches or many miles.
FEELER HOLE
A small-diameter exploratory hole drilled ahead of the tunnel face in
order to determine ground conditions.
FINAL LINING
Long-term shaft or tunnel support installed for permanent stability
or other user requirement, often incorporating the initial support
elements; also referred to as "permanent lining," "permanent support,"
"final support."
FIRM GROUND
Consolidated sediments or soft sedimentary rock in which the tunnel
heading can be advanced without any (or with only minimal) roof sup-
port, and the permanent lining can be constructed before the ground
begins to move or ravel.
173
OCR for page 174
FLOWING GROUND
Soil below the water table so affected by seepage pressures toward
the tunnel working face that what might otherwise be running or
ravelling ground is transformed into a flowing mass that advances
like a thick liquid into the heading.
FOLIATION
General term for a planar arrangement of textural or structural fea-
tures in any type of rock, especially the planar structure that re-
sults from flattening of the constituent grains of a metamorphic rock.
See also schistosity.
FOREPOLE, FOREPOLING
Sharpened planks or steel sections driven from the arch to extend at
an upward angle ahead of a soft-ground tunnel face to provide tempo-
rary support and overhead protection while another increment is being
mined. Generally driven over the last set near the face, with the
butt end wedged beneath the next to last set.
FREE AIR
Air at atmospheric pressure.
FRICTION ROCK STABILI ZER
A 3- to 8-ft long steel bar with a slot along its entire length, in-
serted in drilled holes of slightly smaller diameter around the pe-
riphery of a tunnel. The slot causes the stabilizer to be in com-
press~on and exert an outward anchoring force to tie rock-blocks or
strata together and prevent their loosening or falling out.
FULL FACE
Tunnel excavation to full cross-sectional size with each blast or
shove. Distinguished from heading, bench, and multiple drift.
GOUGE
GRADE
Finely abraded or pulverized rock particles and claylike altered rock
found between the walls or within the fractures of a fault or shear
zone; the result of grinding movements that crush the affected rock.
(a) The overall vertical alignment of an underground opening. (b)
Locally, the same as "gradient," i.e., the rate of incline or decline
in terms of degrees from the horizontal, percent of rise to the hori-
zontal distance, or in feet of vertical projection per mile of hori-
zontal projection.
GRIPPER SHIELD
A shielded rock or hard-earth tunnel bor ing machine equipped to move
forward by reacting (i.e., exerting shove forces) against the tunnel
walls through a hydraulic gripper reaction system.
GRIPPER TBM
A rock tunnel boring machine which generally utilizes roller disc
cutters as excavation tools and which moves forward by reacting
(idea, exerting shove forces) against the tunnel walls through a hy-
draulic gripper reaction system.
GROUND
The medium, whether soil or rock, through which a tunnel is driven.
174
OCR for page 175
GROUND ANCHOR
Part of a ground support system consisting of a tendon inserted in a
drilled hole, secured at the remote end, usually by means of a grout-
ed plug, and tightened or tensioned against the ground retaining mem-
ber in the system. See also rock bolt.
GROUT
A pumpable slurry of neat cement or a mixture of neat cement and fine
sand, commonly forced into holes drilled from a tunnel to strengthen
incompetent soil/rock or to prevent groundwater from flowing into the
excavation. See also chemical grout.
GUNITE
A form of mortar consisting of fine sand, cement, and water which is
sprayed on freshly excavated rock by air pressure to prevent deteri-
oration of the rock, and In some instances to provide structural sup-
port.
HAND MINING
(a) Tunnel excavation by means of hand-held tools rather than by
heavy, mechanized cutting or digging equipment. (b) Term sometimes
applied to drill-and-blast operations in order to emphasize a dis-
tinction from TBM-mining.
HARD ROCK
In construction, rock having a strongly bonded nature such as to re-
quire excavation by blasting or the use of specially hardened cutters;
generally includes igneous and metamorphic rock and the more strongly
bonded sedimentary rocks.
HEADING
(a) The wall of unexcavated ground at the advance end of a tunnel;
similar in use to face. (b) A small advance tunnel driven for the
purpose of enlarg ing to create the main tunnel; similar to drift, but
generally driven above the spr ingline as a top heading.
HEADING-AND-BENCH CONSTRUCTION
A tunneling method in which a top heading is excavated, followed
(within one to a few blasts or shoves) by excavat ion of the lower
bench. Distinguished from top heading construction.
HEAVY GROUND
Very incompetent rock, usually found in faults or in shear zones;
highly weathered or decomposed material having a tendency to move
into the open tunnel area.
HIGH AIR
Compressed air used in tunnels to operate pneumatic tools. Generally
supplied at 100 psi.
HIGH ROCK
A rock surface extending above the invert of a tunnel that would
otherwise be driven entirely in soft-ground conditions.
HOLE THROUGH
To "daylight" a tunnel at a portal or to meet another tunnel face
which results in a continuous tunnel.
HORSESHOE TUNNEL
A tunnel of roughly horseshoe-shaped cross section, or tented like an
inverted "U." Many variations on the basic configuration are pos-
sible.
175
OCR for page 176
INCoMPETENT GROUND
Essentially the opposite of competent ground or firm ground. See
heavy ground for related definition.
INITIAL SUPPORT
Relatively short-term tunnel or shaf t supper t ins tailed f or s tabili ty
and safety during construction operations, with elements generally
let t in place and incorporated into the f inal lining. Initial sup-
port is often referred to as primary support.
INTRADOS
The interior curve of an arch, as of a tunnel lining.
INVERT
The lowest point of a tunnel, i.e., the floor. On a circular config-
uration, it is approximately the bottom 90 degrees of the arc of the
tunnel. On a square-bottom configuration, it is the bottom of the
tunnel.
JOINT
In rock, a naturally occurring fracture or parting along which there
has been no vis ible movement parallel to the fracture plane or sur-
face.
JUM80
See drill jumbo.
JUMP SET
One steel rib or unit of timber framing installed between two over-
stressed sets or between two pre-existing sets .
LAGGING
Wood planking or other structural materials spanning the area between
ribs.
LINER PLATE
Iron or steel plates which can be fastened together to support the
arch, sides, and in some cases the invert of a tunnel.
LINING
A casing of brick, concrete, shotcrete, iron, steel, or wood placed
in a tunnel or shaft to provide support and/or to finish the interior.
LoW AIR
Compressed air used to facilitate tunneling in soft or very wet
ground by counterbalancing external hydrostatic pressures. Supplied
at 5 to 40 psi.
MACHINE MINING
Continuous tunneling by means of boomheaders, tunneling machines,
TBMs, etc. Distinguished from drill-and-blast.
MASSIVE
(a) In geology, the homogeneous structure of a rock without any
planar, directional arrangement of textural or structural features.
(b) A durable body of rock that is essentially free of fractures and
other discontinuities, and possesses a strength that does not vary
appreciably from point to point.
176
OCR for page 177
MECHANICAL EXCAVATION
The removal of soil or rock by means of heavy cutting or digging
equipment (not hand-held).
and-blast excavation.
MINED TUNNEL
A tunnel excavated without removing the overlying rock or soil and,
except for shaft connections, open to the surface only at one or both
ends during construction.
MTXED-FACE TUNNEL
A tunnel requiring excavation of both earth and rock materials in the
same heading at the same time. Some owners may extend the definition
of rock to include boulders larger than 3 ft in diameter because of
similar difficulties of removal.
MOLE
See tunnel boring machine (TBM).
MUCK
Excavated soil or rock that must be removed from the tunnel or shaft
in order to continue advancing. The removal operation is termed
"mucking" or "mucking out."
MULTIPLE-DRIFT EXCAVATION
A tunneling method in which two or more parallel drifts are pre-exca-
vated in order to install partial ground support before the full tun-
nel cross section is opened up between them.
Distinguished from hand mining and drill-
OPEN-CUT TUNNEL
A tunnel constructed by excavating a trench from the surface, build-
ing the structure within the trench, and then backfilling to restore
the surface.
OVERBREAE;
The quantity of rock that is actually excavated beyond the perimeter
established as the desired tunnel outline (i.e., the pay line), owing
to the irregular pattern of rock breakage.
OVERBURDEN
In this study, essentially the same as cover, the total depth of soil
and/or rock overlying the tunnel crown. Distinguished from another
common def inition as the mantle of soil or loose mater ial overlying
bed rock.
PAY LINE
A dimensional line in a tunnel, outside of which excavation is not
paid for.
PENETRATION RATE
The optimum speed with which a drill or excavator can advance through
the ground in a short time before it is slowed or stopped by mechani-
cal breakdown, ground instability, or the like.
PILOT TUNNEL
A small tunnel excavated over the entire length or over part of a
larger tunnel, to explore ground conditions and/or to assist in final
excavation. May also be referred to as a "pilot drift."
177
OCR for page 178
POLING BOARD OR PLATE
See forepoling.
POPPING ROCK
An overstressed rock condition involving the spontaneous and violent
detachment of rock slabs. See also rock burst.
PORTAL
The entrance from the ground surface to a tunnel.
POSTS
The vertical members of a steel rib or timber support system.
PRE-SPLITTING
A technique of inducing cracks roughly following the periphery of the
rock shape to be excavated by the use of closely spaced holes and re-
duced explosive charges prior to main blasting; a subdivision of
smooth blasting.
PRIMARY SUPPORT
See initial support.
PULL
The length of rock broken when a round is fired at the face.
QUARTER ARCH POINTS
Those areas between the tunnel crown and springline covering approxi-
mately the spread from the 1:00 to 2:00 o'clock and the 10:00 to
11:00 o'clock positions.
RAISE
(a) To excavate a shaft upwards, in distinction from sinking. (b) A
vertical or inclined shaft driven upward from an underground opening,
most frequently to connect with another underground opening or the
surface.
RAISE BORE
To raise a shaft by means of a rotating mechanical device generally
powered and/or guided upward by a drill stem fed through a small down-
drilled pilot hole.
RAISE BORE AND REAM
To raise bore a shaft of moderate size, then enlarge to a greater di-
ameter by pushing or pulling a mechanical "reaming" device through
the initial opening.
RAISE BORE AND SLASH
To raise bore a shaft of moderate size, then enlarge to a greater di-
ameter by means of blasting, or "slashing."
RAVELLING GROUND
Poorly consolidated or cemented materials that can stand up for sev-
eral minutes to several hours at a fresh cut, but then start to
slough, slake, or scale off.
RIB
A part of the tunnel support, usually of structural steel, curved to
suit the shape of the tunnel section. See also set.
ROADHEADER
See boomheader (currently a synonymous term).
178
OCR for page 179
ROCK
(a) Ordinarily any consolidated or coherent and relatively hard, nat-
urally formed mass of mineral matter; stone. (b) In engineering, a
natural aggregate of mineral particles connected by strong and perma-
nent cohesive forces (i.e., interlocking crystals, closely packed
grains, natural cement). {c) Any material which requires blasting or
the use of powerful, hardened equipment for effective removal.
ROCK BOLT
A round steel bar, sometimes very long but usually less than 25 ft
long, equipped with an expandable anchor at the far end, inserted in
drilled holes around the periphery of a tunnel to tie rock-blocks or
strata together and prevent their loosening or falling out. It may
be locked into the hole mechanically or with some type of grout. It
may be tensioned or untensioned.
ROCK BURST
A spontaneous and violent detachment of a slab or slabs from over-
stressed rock. See also popping rock.
ROCK DOWEL
A 5- to 40-ft long steel reinforcing bar inserted in drilled holes
around the periphery of a tunnel and anchored or sealed with mortar
or polyester resin to tie rock-blocks or strata together and prevent
their loosening or falling out.
ROCK QUALITY DES TGNATION (ROD)
A modified core recovery percentage in which only sound pieces of
rock core 4 in. or more in length are counted as recovery. ROD is
considered a more accurate gauge of a rock's engineering "quality" or
competence than is the gross recovery percentage. It is stated as
the cumulative percent of the core run occurring in pieces greater
than 4 in. long.
ROCK TUNNEL
A tunnel driven in consolidated natural material {i.e., "rock") which
requires use of rock excavation methods such as blasting, channeling,
wedging, or barring, or a tunneling machine making use of specially
hardened cutters.
ROLLER CUTTER
A cutter consisting of a circular metal disc with hardened rim or
teeth, mounted on bearings set in the rotating face of a TBM and
rolled in an arc across the rock face under force; the resulting con-
centration of force or of stress spells the rock. See also disc
cutter.
ROOF
The overhead portion of a tunnel, i.e. ceiling; a more common term
than the synonymous back. -
ROOF BOLT
Physically the same as a rock bolt.
ROUND
A cycle of rock excavation consisting of drilling blast holes, load-
ing, firing, and then mucking.
ROUTE FOOT
A measurement of alignment that distinguishes between single tube and
multiple tube configurations for the purpose of equating the utility
of borehole surveys. For example, one borehole may be used to survey
179
OCR for page 180
(theoretically) twice as many linear ft of tunnel for a double tube
system as for a single tube system. Thus, one route ft in a double
tube system comprises two linear ft of tunnel alignment; in a single
tube system, route ft and linear ft are the same.
RUN-IN
Relatively sudden, uncontrolled flow of material into a tunnel from
the face or the tunnel circumference.
RUNNING GROUND
Perfectly cohesionless materials (such as dry sand or clean, loose
gravel) above the water table which run from any unsupported lateral
face until a stable pile is built up at the angle of repose.
SCALING
The removal of loose pieces of rock adhering to the solid tunnel sur-
face after blasting.
SCHISTOSTTY
The foliation in schist or other coarse-grained, crystalline rock due
-
to the parallel, planar arrangement of mineral grains of the platy,
prismatic or ellipsoidal type, such as mica.
SEGMENTS
Sections of iron, steel, or precast concrete which can be bolted or
keyed together to make up a ring of support or lining. Iron or steel
segments are generally referred to as liner plates; concrete segments
may be referred to as "panels."
SET
SHOTCRETE
SHOVE
One steel rib or unit of timber framing to support the sides and roof
of a tunnel.
SHAFT
An excavation of limited area compared with its depth, constructed
for access, ventilation, or conveyance of water to an underground
opening. The term is often specifically applied to an approximately
vertical shaft as distinguished from an incline or inclined shaft.
SHEAR ZONE
A local geologic structure resulting from the relief of earth stress-
es by the formation of a multitude of minute, closely spaced frac-
tures with slight slipping or faulting along each.
SHIELD
A movable steel tube, framework, or canopy shaped to fit the excava-
tion line of a tunnel and used to provide immediate support for the
tunnel and protect the men excavating and providing the longer-term
supports. May be fitted with a cutting device for excavating the
tunnel and/or a form and mechanical devices for placing the tunnel
lining. See also soft-ground _hield and gripper shield.
A form of quick-setting concrete with aggregate generally no larger
than 3/4 in., sprayed on freshly excavated rock by air pressure to
provide early, flexible support and sometimes applied more thickly to
provide permanent support.
The act of advancing a mole or shield with hydraulic jacks.
180
OCR for page 181
SINE
To excavate a shaft downwards from the surface, in distinction from
raising.
SLABBY ROCK
Rock cut through by finely parallel joints and/or cleavage planes so
that it breaks into tabular plates upon exposure in an excavation.
SLAKING
The crumbling and disintegration of rock or hard soil upon exposure
to air or water.
SLICKENSIDES
The polished and sometimes striated surfaces on the walls of faults
and shear zones, resulting from rubbing during earth movements.
Sometimes referred to by construction people as "slicks. n
SLURRY SHIELD
A closed-face shield designed for tunneling in very soft, wet, or
running ground by use of circulating, pressurized clay slurry against
the face to counterbalance earth pressures, prevent ingress of water,
and also to carry away the cuttings.
SMOOTH BLASTING
A technique of using carefully controlled shot hole drilling and spe-
cially prepared charges in peripheral blast holes to reduce overbreak.
See also pre-splitting.
SOFT-GROUND SHIELD
Any tunnel shield which moves forward by reacting {i.e., exerting
shove forces) against the tunnel lining and generally utilizing drag
type excavation tools that can be mounted on a backhoe, rotating
wheel or oscillating arm.
SOFT-GROUND TUNNEL
Same as earth tunnel. The ground may be hard or soft in consistency,
the word "soft" differentiating it only from "hard" rock.
SOFT ROCK
In construction, rock having a weakly bonded nature such as to permit
excavation by air-operated hammers or other equipment only slightly
more powerful than earth excavation equipment. Generally includes
the more weakly bonded of the sedimentary rocks, such as clay shales.
SOIL
(a) In geology, any loose surface material overlying solid rock. (b)
Broadly and loosely, the regolith, or blanket of unconsolidated rock
material that lies on the bed rock. See earth for related definition.
SPALLING
The breaking off of thin surface sheets or plates in rock under ex-
cessive tension.
Spires, SPILING
Essentially the same as forepoling, but may also include steel bars
drilled ahead of a rock tunnel face.
SPRINGLTNE
The point where the curved portion of a tunnel roof meets the top of
the wall. In a circular tunnel the springlines are at the opposite
ends of the horizontal centerline.
SQUEEZING GROUND
Weak material, generally clayey, that behaves plastically under the
weight of overlying ground and tends to close a tunnel opening by
slowly advancing into it without perceptible volume increase.
181
OCR for page 182
STAND-UP TOME
See bridge action time.
STOPE
{a) A highly inclined or vertical excavation driven from the main
tunnel or drift in an upward direction. (b) Excessive overbreak oc-
curring for only a short distance and extending to a considerable
height above the crown of a tunnel; may also be referred to as a
"chimney."
SWELLING GROUND
Material that expands in volume by absorbing or adsorbing water so
that it tends to move into a tunnel opening or to exert great pres-
sure upon the supports.
TAIL VOID
The annular space at the back {tail) end of a shield between the
outside diameter of the shield and the outside of the primary lining.
TEMPORARY SUPPORT
Essentially the same as initial support, except that the elements can
be (and sometimes must be) removed because of non-contribution to or
incompatibility with the final lining.
TOP HEADING
The upper portion of a tunnel, often extending from springline to
crown, pre-excavated in order to install arch support before opening
the tunnel to full size.
TOP HEADING CONSTRUCTION
A tunneling method in which a complete top heading is excavated end-
to-end before excavation of the lower bench is begun. Distinguished
from heading-and-bench construction.
TUNNEL
An elongate, essentially linear excavated underground opening, gen-
erally with a length greatly exceeding its width or height.
TUNNEL BORING MACHINE (TBM)
A machine that excavates a circular tunnel by cutting and/or abrading
the heading to full size in one operation. Also referred to as a
mole. The term has so commonly been associated with rock tunneling
that when a TBM is used in earth it is often prefaced by the quali-
fier "soft-ground.'
TUNNELING MACHINE
A continuously excavating machine utilizing one or more rotating cut-
terheads which are revolved under force against the tunnel face.
WATER TABLE
The upper limit of the portion of the ground at which water levels
stand, as measured in piezometers or observation wells .
182
Representative terms from entire chapter:
boring machine