Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter.
Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.
OCR for page 59
Appendix C
Recommendations from the Report of the
Space Shuttle Weather Forecasting
Advisory Pane! to the NASA Associate
Administrator for Space Flight,
October 1986
1. The National Aeronautics and Space Administration should
establish a Weather Support Office at the top level of Shuttle oper-
ations to plan, organize, focus, and direct the activities related to
Space Shuttle weather support. The head of this office should be
a senior atmospheric scientist or a senior technical manager with a
strong operations background, who IS knowledgeable about opera-
tional weather forecasting and research and development and who
commands respect in the meteorological and NASA communities.
Under the optimum organizational structure, the head of this once
would have line authority for all Shuttle weather support person-
ne! and programs. However, both the present and planned Shuttle
launching ranges are operated by the Air Force to meet both Shuttle
and additional requirements, and the Shuttle itself is operated by
NASA. The pane! recognizes that the optimum arrangement may be
impossible to implement in practice and reco~nmends that responsi-
bility and authority for programs and personnel be consolidated in
the Shuttle Weather Support Office to the extent possible.
2. There must be a small, highly qualified, well-trained, and
dedicated team of forecasters who provide weather support for Shut-
tle operations. These forecasters should be willing to be an integral
part of the Shuttle team and remain so for extended periods (5 to 10
years). Steps should be taken to ensure their continuity and devotion
to the task (by grade and/or salary adjustments or other incentives).
59
OCR for page 60
60
3. To ensure that this team has the very latest research results
and tools available and is trained to use these tools effectively, the
head of the Weather Support Office should expand Techniques Tran-
sition Units at each operational site. These units should consist of
one or two highly competent applied meteorologists and one or more
computer specialists to act as an interface between the research and
development community and the Shuttle forecast team.
4. There should be a standing advisory pane! of experts to
assist the Weather Support Office in charting its course, setting its
priorities, and aiding in contacts with the Shuttle Program Office to
secure continued support and visibility within NASA for the Space
Shuttle weather effort.
5. The Meteorological Interactive Data Display System
(MIDDS) can depict weather situations on a global basis. It is
thus a key ingredient in forecasting and in communications of poten-
tial hazards to decision makers. The system needs to be developed
at Johnson Space Center (JSC), and eventually Edwards Air Force
Base (EAFB) and Vandenberg Air Force Base (VAFB). At each site
having weather support responsibilities, MIDDS must be maintained
and periodically upgraded to ensure that it represents the state of
the art in rapid data access, analysis, and display capabilities.
6. The Doppler radar requirement to aid in the detection and
observation of weather developments should rely on the NEXRAD
facility, which will be installed and operated by the National Weather
Service near KSC. Research on the processing and application of
Doppler radar data should precede the completion of that installation
to ensure that the data can be utilized promptly.
7. The models that are used for Space Shuttle wind-Ioading
calculations need to be reexamined in view of the availability of
ground-based remote wind profilers and their planned installation at
KSC. Because the panel was unable to obtain access to the relevant
computer algorithms, it is not possible to comment here concerning
the adequate accuracy and resolution of these profilers for wind Toad
assessments. A thorough study of methods and modem for short-
range wind forecasting should be undertaken with these and other
technological advances under consideration, in view of the rapid wind
profile changes under way preceding the Challenger launch. Rapid
wind profile changes are undoubtedly common under many other
weather situations.
8. The mesonetwork at KSC needs quaTity-control review and
OCR for page 61
~1
probable augmentation for short-range wind and convective activity
forecasts.
9. At KSC, airborne instrumentation ~ required to quantify
the precipitation sizes that are observed over the launch site prior to
launch to determine whether the precipitation may pose a threat to
the orbiter thermal protection system.
10. A thorough study should be made of the available subsynop-
tic and mesosc ale models to provide guidance to the Shuttle forecast
team. Specific models should be selected and developed in parallel
to ongoing operations. The use of such modem as forecasting aids
may have near-term payoff.
11. Research on artificial intelligence (AT) at KSC should be con-
tinued at a modestly supported research level until it can be shown to
have real promise for the Shuttle forecast problem. Before investing
significant resources in Al, it would be advisable to wait until some
other group or agency has shown that this too] has potential for a
simper type of forecast environment.
Representative terms from entire chapter:
shuttle weather