National Academies Press: OpenBook
« Previous: Chapter 6 - Tier 3 Optimal Risk-Based Approach
Page 93
Suggested Citation:"Chapter 7 - Summary." National Academies of Sciences, Engineering, and Medicine. 2009. A Guidebook for the Evaluation of Project Delivery Methods. Washington, DC: The National Academies Press. doi: 10.17226/14238.
×
Page 93
Page 94
Suggested Citation:"Chapter 7 - Summary." National Academies of Sciences, Engineering, and Medicine. 2009. A Guidebook for the Evaluation of Project Delivery Methods. Washington, DC: The National Academies Press. doi: 10.17226/14238.
×
Page 94

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

This guidebook was prepared with the objective of providing a systematic and logical approach for selecting the most appropriate delivery method for a transit project. Furthermore, this guide- book aims to help the user in documenting the process of decision-making in a Project Delivery Decision Report. It is recommended that transit agencies use industry professionals from out- side the agency to facilitate the implementation of this methodology. These professionals should have a thorough understanding of and experience with the type of project the agency is evaluat- ing, the various project delivery methods the agency is considering, and the potential risks asso- ciated with the type of project and various project delivery methods under consideration. The use of such professionals will ensure that the appropriate expertise and experience is incorpo- rated into the process. Facilitation of the process by outside professionals will also foster an objective selection of the most appropriate project delivery method, and minimize the likelihood of a predetermined outcome. The delivery methods considered in this guidebook are the traditional design-bid-build (DBB), CM-at-risk (CMR) or CM/GC, design-build (DB), and design-build-operate-maintain (DBOM). Until recently, the traditional DBB approach was transit agencies’ most common choice of the project delivery method mainly because of legal limitations and because agencies had experience with this delivery method. Legal limitations on using other delivery methods have mostly been removed, and this has provided more flexibility in the choice of project delivery method. Transit agencies have different motivations in selecting a delivery method other than DBB. The research team found that no single project delivery method was superior to all others and that transit agencies need to carefully analyze the characteristics of each project to find the project delivery method most suitable for meeting a project’s requirements. The most common reasons for choosing an alternative project delivery method given by project directors interviewed for this research were the following: 1. Reducing/compressing/accelerating the project delivery period, 2. Encouraging innovation, 3. Establishing a budget and involving a contractor early in the process, and 4. Meeting flexibility needs during the construction phase. Transit agencies should carefully study the risks, costs, and benefits associated with each project delivery method in relation to a particular project under consideration and select the project delivery method that best suits the legal, technical, and business environment in which the project must be built. This guidebook strives to facilitate this process by providing a three-tiered delivery selection system that covers all these factors. In this system, the user works through the three tiers sequentially and narrows down the viable delivery methods through a process of elim- inating the inferior choices. 93 C H A P T E R 7 Summary

In the Tier 1 approach, users evaluate the viability of each delivery method against 24 pertinent issues that can be of vital importance to a project’s success in achieving its goals and objectives. Among the 24 pertinent issues that affect the project delivery decision, there are 4 issues that may render one or more delivery methods inappropriate. These four issues are project schedule con- straints; federal, state, and local laws; third-party agreements; and labor union agreements. The transit agency needs to review project delivery methods in relation to these four issues to deter- mine whether any of the delivery methods should be eliminated. In other words, the agency should make a go/no-go decision on each delivery method based on how these four pertinent issues are affected by the delivery method. Following the go/no-go decision, the user examines the remaining project delivery choices against the larger list of pertinent issues and rates each delivery method based on its advantages and disadvantages in relation to each pertinent issue. The summary of these ratings is compiled in a table and analyzed to determine whether a decision on a delivery method can be made based on the ratings. If a clear choice emerges at this point, a Project Delivery Decision Report can be generated that describes the reasons for the choice of delivery method. If more than one delivery method remains viable after completing the Tier 1 approach, the user should move on to the Tier 2 approach. In Tier 2, a select subset of goals and pertinent issues are identified as “selection factors” that are of profound importance to the transit agency. Each selection factor is weighted according to instructions provided in this guide (see Chapter 5), and an overall score is computed for each delivery method. Again, a report documenting the decision- making process can be generated. If more than one delivery method remains viable after completion of the Tier 1 and Tier 2 approaches, the user moves on to the Tier 3 approach. In Tier 3, the user reviews and identifies project risks and prepares a risk-allocation matrix that provides a clear comparison among the remaining delivery methods in terms of risks that are inherent to them. This matrix should help the user select the delivery method that results in a more favorable risk profile. Project risks can also be quantified through well-established risk analysis techniques, and a decision regarding the most appropriate delivery method can be reached based on the costs of the risks associated with each delivery method. However, the quantitative approach requires significant effort and depends on the willingness of the owner agency to embark on this analysis and the availability of a risk assessment report for input into this process. This guidebook was tested by several transit project directors. The users found the process easy to follow and informative, and their overall assessment was very positive. Their comments and feedback were carefully reviewed and incorporated in the current guidebook. The guidebook in its current form is a valuable tool for transit agencies, especially those with limited experience with alternative project delivery methods. 94 A Guidebook for the Evaluation of Project Delivery Methods

Next: Appendix A - References »
A Guidebook for the Evaluation of Project Delivery Methods Get This Book
×
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s Transit Cooperative Research Program (TCRP) Report 131: A Guidebook for the Evaluation of Project Delivery Methods examines various project delivery methods for major transit capital projects. The report also explores the impacts, advantages, and disadvantages of including operations and maintenance as a component of a contract for a project delivery method.

A companion publication to TCRP Report 131 isTCRP Web-Only Document 41: Evaluation of Project Delivery Methods, which explores pertinent literature and research findings related to various project delivery methods for transit projects. TCRP Web-Only Document 41 also includes definitions of project delivery methods and highlights the existing selection approaches commonly used by transit agencies.

Appendix A: References and Appendix B: Definitions were published as part of TCRP Report 131. Appendices C through H of the report are available online.

Appendix C: Forms for Project Description and Goals

Appendix D: Forms for the Analytical Delivery Decision Approach (Tier 1)

Appendix E: Forms for the Weighted-Matrix Delivery Decision Approach (Tier 2)

Appendix F: Procedures for Determining the Weights of Selection Factors in the Weighted-Matrix Delivery Decision Approach (Tier 2)

Appendix G: Form for the Optimal Risk-Based Approach (Tier 3)

Appendix H: Application of the Tier 1 and Tier 2 Approaches to a Hypothetical Project

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!