Suggested Citation:"ACRP LEGAL RESEARCH DIGEST 38: LEGAL ISSUES RELATED TO LARGE-SCALE AIRPORT CONSTRUCTION." National Academies of Sciences, Engineering, and Medicine. 2020. Legal Issues Related to Large-Scale Airport Construction Projects. Washington, DC: The National Academies Press. doi: 10.17226/25723.
×
Page 1

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

Background ere are over 4,000 airports in the country and most of these airports are owned by governments. A 2003 sur- vey conducted by Airports Council International–North America concluded that city ownership accounts for 38 percent, followed by regional airports at 25 percent, single county at 17 percent, and multi-jurisdictional at 9 percent. Primary legal services to these airports are, in most cases, provided by municipal, county, and state attorneys. Research reports and summaries produced by the Airport Continuing Legal Studies Project and published as ACRP Legal Research Digests are developed to assist these attorneys seeking to deal with the myriad of legal problems encountered during airport development and operations. Such substantive areas as eminent domain, environmental concerns, leasing, contracting, security, insurance, civil rights, and tort liability present cutting- edge legal issues where research is useful and indeed needed. Airport legal research, when conducted through the TRB’s legal studies process, either collects primary data that usually are not available elsewhere or performs analysis of existing literature. Foreword Design-bid-build has been the traditional project deliv- ery method used by airports, but as the complexity of the airport construction projects has increased, along with the success of alternative delivery methods used in other large-scale transportation projects, airports are now also using a variety of alternative delivery methods. Alternative project delivery methods can provide cost savings, more ecient phasing of design and construc- tion, and more ecient project risk allocation, as well as address lifecycle cost considerations. Large-scale, complex airport construction projects have the same issues as construction projects on a smaller scale, but they present a series of specialized legal issues. e use of alternative delivery methods also have their own set of legal and procurement issues espe- cially for airports as public agencies. e legal issues that this digest will focus on are those causing most signi- cant risks during planning, design, permitting, procure- ment, and construction. is digest addresses the legal issues that airport attorneys and sta working on large-scale, complex air- port construction projects are likely to encounter and the potential options for addressing those issues. Legal Issues Related to Large-Scale Airport Construction Projects This digest was prepared under ACRP Project 11-01, “Legal Aspects of Airport Programs,” for which the Transportation Research Board (TRB) is the agency coordinating the research. Under Topic 10-02, this digest was prepared by Pramen P. Shrestha, University of Nevada, Las Vegas, NV; Brandon J. Davis, Nossaman LLP, Los Angeles, CA; and Ghada M. Gad, California State Polytechnic University, Pomona, CA. The responsible program officer is Marci A. Greenberger. The opinions and conclusions expressed or im- plied in this digest are those of the researchers who performed the research and are not necessarily those of the Transportation Research Board; the National Academies of Sciences, Engineering, and Medicine; or the program sponsors. FEBRUARY 2020 AIRPORT COOPERATIVE RESEARCH PROGRAM ACRP LRD38LEGAL RESEARCH DIGEST

Next: CONTENTS »
Legal Issues Related to Large-Scale Airport Construction Projects Get This Book
×
 Legal Issues Related to Large-Scale Airport Construction Projects
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

Large-scale, complex airport construction projects have the same issues as construction projects on a smaller scale, but they present a series of specialized legal issues.

The TRB Airport Cooperative Research Program's ACRP Legal Research Digest 38: Legal Issues Related to Large-Scale Airport Construction Projects focuses on those legal issues causing the most significant risks during planning, design, permitting, procurement, and construction.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!