Skip to main content

Influence of Geotechnical Investigation and Subsurface Conditions on Claims, Change Orders, and Overruns

View Cover

Overview

Contributors

Description

TRB’s National Cooperative Highway Research Program (NCHRP) Synthesis 484: Influence of Geotechnical Investigation and Subsurface Conditions on Claims, Change Orders, and Overruns documents the extent and type of claims, change orders, and cost overruns from subsurface conditions for state departments of transportation (DOTs). The report also identifies practices used by agencies to reduce such claims, change orders, and cost overruns.

Topics

Suggested Citation

National Academies of Sciences, Engineering, and Medicine. 2016. Influence of Geotechnical Investigation and Subsurface Conditions on Claims, Change Orders, and Overruns. Washington, DC: The National Academies Press.https://doi.org/10.17226/21926.

Import this citation to:

Publication Info

76 pages |8.5 x 11
DOI: https://doi.org/10.17226/21926
Contents
Rights

Copyright Information

The National Academies Press and the Transportation Research Board have partnered with Copyright Clearance Center to offer a variety of options for reusing our content. You may request permission to:

  • Republish or display in another publication, presentation, or other media
  • Use in print or electronic course materials and dissertations
  • Share electronically via secure intranet or extranet
  • And more

For most Academic and Educational uses no royalties will be charged although you are required to obtain a license and comply with the license terms and conditions.

Click here to obtain permission forInfluence of Geotechnical Investigation and Subsurface Conditions on Claims, Change Orders, and Overruns.

Translation and Other Rights

For information on how to request permission to translate our work and for any other rights related query please click here.

Copyright.com Customer Service

For questions about using the Copyright.com service, please contact:

Copyright Clearance Center
22 Rosewood Drive
Danvers, MA 01923
Tel (toll free): 855/239-3415 (select option 1)
E-mail: info@copyright.com
Web: https://www.copyright.com
Stats

Loading stats for Influence of Geotechnical Investigation and Subsurface Conditions on Claims, Change Orders, and Overruns...