Skip to main content

VIEW LARGER COVER

TRB’s National Cooperative Highway Research Program (NCHRP) Synthesis 484: Influence of Geotechnical Investigation and Subsurface Conditions on Claims, Change Orders, and Overruns documents the extent and type of claims, change orders, and cost overruns from subsurface conditions for state departments of transportation (DOTs). The report also identifies practices used by agencies to reduce such claims, change orders, and cost overruns.

Suggested Citation

National Academies of Sciences, Engineering, and Medicine. 2016. Influence of Geotechnical Investigation and Subsurface Conditions on Claims, Change Orders, and Overruns. Washington, DC: The National Academies Press. https://doi.org/10.17226/21926.

Import this citation to:

Publication Info

76 pages |  8.5 x 11 |  DOI: https://doi.org/10.17226/21926

What is skim?

The Chapter Skim search tool presents what we've algorithmically identified as the most significant single chunk of text within every page in the chapter. You may select key terms to highlight them within pages of each chapter.

loading iconLoading stats for Influence of Geotechnical Investigation and Subsurface Conditions on Claims, Change Orders, and Overruns...