Description

TRB’s second Strategic Highway Research Program (SHRP 2) Report S2-R04-RR-1: Innovative Bridge Designs for Rapid Renewal documents the development of standardized approaches to designing and constructing complete bridge systems for rapid renewal.

The report also describes a demonstration project on US-6 over Keg Creek near Council Bluffs, Iowa, that was completed in 2011 using the accelerated bridge construction standards developed as part of Renewal Project R04.

The following three videos were also produced related to the Keg Creek project:

ABC for Everyday Bridges (18:39) highlights the specific techniques used to deliver a new bridge with only a 10-day closure.

One Design—10,000 Bridges (9:46) describes a tool kit for designing and constructing bridges that brings home the benefits of accelerated bridge construction techniques so local contractors can use typical equipment to build bridges quickly and efficiently.

Time-Lapse Video (1:30) shows accelerated bridge construction techniques being used by a local contractor with standard equipment to replace the Keg Creek three-span bridge.

SHRP 2 Renewal Project R04 also developed an Innovative Designs for Rapid Renewal: ABC Toolkit that describes standardized approaches to designing and constructing complete bridge systems for rapid renewals, as well as a case study on the accelerated bridge construction techniques used in the I-84 bridge project in New York. In addition, the project developed a half- and full-day presentations to help facilitate training on the accelerated bridge process to interested parties.

In June 2013, SHRP 2 released a Project Brief on Renewal Project R04.

​Software Disclaimer: This software is offered as is, without warranty or promise of support of any kind either expressed or implied. Under no circumstance will the National Academy of Sciences or the Transportation Research Board (collectively "TRB") be liable for any loss or damage caused by the installation or operation of this product. TRB makes no representation or warranty of any kind, expressed or implied, in fact or in law, including without limitation, the warranty of merchantability or the warranty of fitness for a particular purpose, and shall not in any case be liable for any consequential or special damages.

Topics

Suggested Citation

National Academies of Sciences, Engineering, and Medicine. 2014. Innovative Bridge Designs for Rapid Renewal. Washington, DC: The National Academies Press. https://doi.org/10.17226/22727.

Import this citation to:

Publication Info

357 pages | 8.5 x 11
DOI: https://doi.org/10.17226/22727
Contents
Rights

Copyright Information

The National Academies Press and the Transportation Research Board have partnered with Copyright Clearance Center to offer a variety of options for reusing our content. You may request permission to:

  • Republish or display in another publication, presentation, or other media
  • Use in print or electronic course materials and dissertations
  • Share electronically via secure intranet or extranet
  • And more

For most Academic and Educational uses no royalties will be charged although you are required to obtain a license and comply with the license terms and conditions.

Click here to obtain permission for Innovative Bridge Designs for Rapid Renewal.

Translation and Other Rights

For information on how to request permission to translate our work and for any other rights related query please click here.

Copyright.com Customer Service

For questions about using the Copyright.com service, please contact:

Copyright Clearance Center
22 Rosewood Drive
Danvers, MA 01923
Tel (toll free): 855/239-3415 (select option 1)
E-mail: info@copyright.com
Web: https://www.copyright.com
Stats

Loading stats for Innovative Bridge Designs for Rapid Renewal...