Suggested Citation:"Hypothetical Example for One Facility." National Research Council. 2001. Deferred Maintenance Reporting for Federal Facilities: Meeting the Requirements of Federal Accounting Standards Advisory Board Standard Number 6, as Amended. Washington, DC: The National Academies Press. doi: 10.17226/10095.
×
Page 34

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

DEFINITIONAL ISSUES AND POTENTIAL REVISIONS 34 for the site and utility system numbers in calculating the total amount of deferred maintenance and repair. If the site and utility system numbers are not included, the following formula may apply: BMAR = [Sum (MS%)*(RC%)] CRV Where: MS% = major system percentage of CRV; RC% = repair cost percentage of CRV, as designated by the generalized condition level; and CRV = current replacement value of the building. If site and utility system numbers are included, the site percentage of facility CRV is multiplied by the repair cost (as a percentage of CRV), as designated by the generalized condition level. This number is then multiplied by the CRV of the site work. The utility system percentage of facility CRV is multiplied by the repair cost (as a percentage of CRV), as designated by the general condition level. This number is then multiplied by the CRV. The amounts for systems, site, and utility systems are summed. The final number is the dollar amount of deferred maintenance. BMAR = [(Sum (MS%)*(RC%)) CRV] + [(RCS%)*(SWCRV)] + [(RCUS%)*(RCUSCRV)] Where: MS% = major system percentage of CRV; RC% = repair cost percentage of CRV, as designated by the generalized condition level; CRV = CRV of the building; RCS% = repair cost percentage of CRV, as designated by the generalized condition level of the site work; SWCRV= CRV of the site work; RCUS% = repair cost percentage of CRV, as designated by the generalized condition level of the utility systems; and USCRV = CRV of the utility systems. Hypothetical Example for One Facility Office and laboratory facility – 15 years old. The building has a new roof and excellent interior finishes. The electrical systems, plumbing systems, and structure are adequate. The airconditioning and heating systems have been problematic since new, and the occupants are unhappy with the temperatures and air changes. CRV= $4,500,000 for the building Exterior utility systems are considered as a separate facility. Condition Assessment: System Level % CRV % Facility Architectural 5 (0.01) (0.05) 0.0005 Roof 5 (0.01) (0.10) 0.0010 Electrical 4 (0.20) (0.15) 0.0300 Plumbing 4 (0.20) (0.15) 0.0300 HVAC 3 (0.50) (0.25) 0.1250 Structural 4 (0.20) (0.30) 0.0600 0.2465

Next: NASA Dryden Flight Research Center Statistical Model »
Deferred Maintenance Reporting for Federal Facilities: Meeting the Requirements of Federal Accounting Standards Advisory Board Standard Number 6, as Amended Get This Book
×
Buy Paperback | $47.00 Buy Ebook | $37.99
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

In 1996 the Federal Accounting Standards Advisory Board (FASAB) 1 enacted Standard Number 6, Accounting for Property, Plant, and Equipment (PP&E), the first government-wide initiative requiring federal agencies to report dollar amounts of deferred maintenance annually. The FASAB has identified four overall objectives in federal financial reporting: budgetary integrity, operating performance, stewardship, and systems and control. FASAB Standard Number 6, as amended, focuses on operating performance and stewardship. The FFC Standing Committee on Operations and Maintenance has prepared this report to identify potential issues that should be considered in any future amendments to the standard and to suggest approaches for resolving them. The committee's intent is to assist the CFO Council, federal agencies, the FASAB, and others as they consider how best to meet the objectives of federal financial reporting for facilities.

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!