National Academies Press: OpenBook
« Previous: 5 Applicability of PCAPP Munitions Treatment Unit at BGCAPP
Suggested Citation:"6 General Findings and Recommendations." National Research Council. 2008. Review and Assessment of Developmental Issues Concerning the Metal Parts Treater Design for the Blue Grass Chemical Agent Destruction Pilot Plant. Washington, DC: The National Academies Press. doi: 10.17226/12074.
×
Page 40
Suggested Citation:"6 General Findings and Recommendations." National Research Council. 2008. Review and Assessment of Developmental Issues Concerning the Metal Parts Treater Design for the Blue Grass Chemical Agent Destruction Pilot Plant. Washington, DC: The National Academies Press. doi: 10.17226/12074.
×
Page 41

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

6 General Findings and Recommendations The following general findings and recommendations Finding. The MTU could be substituted for the MPT are based on the discussions and the detailed findings in at BGCAPP; however, it would be necessary to do the Chapters 2 through 5 of this report. following: Finding. The full-scale MPT as currently designed for • Use supplemental decontamination units and auto- BGCAPP can decontaminate projectile bodies and secondary claves to treat secondary waste, and closure waste, and it will be able to achieve its target • Find another means of treating the detonators in the throughput rates provided that the BPBGT is able to resolve M417 rocket fuzes, the following issues: • Modify the MTU design to accommodate 8-in. projectiles, • Successful implementation of new designs for door • Modify the footprint of the building to accommodate closure and seals, for roller bearings on conveyors, the units, and and for the superheated steam header; • Modify the existing permits. • Effective thermal treatment of secondary waste with- out excessive fouling of the duct work leading to the Finding. For BGCAPP, the TRRP testing did not address a bulk oxidizer; method to thermally treat the fuzes and a limited number of • Successful integration of the MPT with its flameless igniters from contaminated propellant that are not decom- thermal oxidizer (i.e., the bulk oxidizer) and cyclone; posed in the energetics batch hydrolyzers. and • Complete destruction of energetic materials in the Recommendation 6-1. The BPBGT needs to develop a waste stream of the energetics batch hydrolyzer method to collect and pop the igniters and fuzes that will not without adversely affecting the MPT. adversely affect the operation of the MPT. Finding. The current range of heat-up times of munitions in Recommendation 6-2. To reduce the technical risks in treat- the MPT should not affect the overall schedule of BGCAPP ing secondary waste in the MPT, the BPBGT should continue operations. to strive to send secondary waste off-site whenever possible and minimize the use of halogenated materials. • Heat-up times in the TRRP tests are close to target and appear to be capable of being improved by rais- Recommendation 6-3. To reduce the load on the off-gas ing the wall temperature of the full-scale MPT. treatment system, the BPBGT should consider obtaining • CFD modeling predicts correct trends in temperature- permits that allow the use of the Airborne Exposure Limit time profiles and locations of cold spots and should Guidelines to operate the MPT at lower temperatures for the be useful in guiding the design and testing of the thermal treatment of secondary waste whenever possible. full-scale MPT. •  processing rate of projectile bodies in the MPT is The Finding. TRRP testing demonstrated the validity of using not on the critical path of the process throughput. The an MPT for thermal decontamination. It also identified design calls for two MPTs. The second is intended many changes and design improvements that will be neces- to be used for secondary waste, but it could also be sary to achieve an acceptable throughput rate and control used for treating munitions bodies in an emergency. maintenance and operating costs. Further testing with var- 40

GENERAL FINDINGS AND RECOMMENDATIONS 41 ied secondary waste materials including halogenated waste TRRP tests. This test plan should be conducted at the fabrica- is still required. These changes and improvements may tion facility and should include time for the repeated trials require several iterations before satisfactory results are needed to arrive at acceptable performance for the overall achieved. full-scale MPT. A similar test plan should be prepared for testing the integrated full-scale off-gas treatment system for Recommendation 6-4. A test plan should be prepared for all the MPT at BGCAPP. This test plan should include the test- design changes identified for the MPT but not verified in the ing of a full range of secondary, energetics batch hydrolyzer, and closure waste at the full-scale design rates.

Next: References »
Review and Assessment of Developmental Issues Concerning the Metal Parts Treater Design for the Blue Grass Chemical Agent Destruction Pilot Plant Get This Book
×
 Review and Assessment of Developmental Issues Concerning the Metal Parts Treater Design for the Blue Grass Chemical Agent Destruction Pilot Plant
Buy Paperback | $29.00 Buy Ebook | $23.99
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

The United States is in the process of destroying its chemical weapons stockpile. In 1996, Congress mandated that DOD demonstrate and select alternative methods to incineration at the Blue Grass and Pueblo sites. The Assembled Chemical Weapons Alternatives (ACWA) program was setup to oversee the development of these methods, and pilot plants were established at both sites. One of the new technologies being developed at the Blue Grass pilot plant are metal parts treaters (MPTs) to be used for the empty metal munitions cases. During recent testing, some issues arose with the MPTs that caused the ACWA to request a review by the NRC to investigate and determine their causes. This book presents a discussion of the MPT system; an assessment of the MPT testing activities; an analysis of thermal testing, modeling, and predicted throughput of the MPT; and an examination of the applicability of munitions treatment units under development at Pueblo for the Blue Grass pilot plant.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!