FIRST COMMITTEE MEETING SEPTEMBER 9-10, 2015 RICHMOND, KENTUCKY
Objectives: To conduct introductory discussions and briefings (i.e. administrative actions, including committee introductions and composition/balance/bias discussions for committee members), discuss the Statement of Task and conduct a background review with sponsor, receive briefings and engage in dialogue with Blue Grass Chemical Agent Destruction Pilot Plant staff, review the report realization process and project plan, review and flesh out the Initial Report Outline, make committee writing assignments, and set future meeting dates and next steps.
Presentations
BGCAPP Process Overview, George Lucier, BGCAPP Deputy Chief Scientist
History Leading Up to Washout Deletion—Original Design and Reasons for Engineering Change, Neil Frenzl, BGCAPP Resident Engineering Manager
Process and Infrastructure Changes Due to Washout Deletion, Neil Frenzl, BGCAPP Resident Engineering Manager
Impacts of Washout Deletion on Metal Parts Treater and Thermal Oxidizer, George Lucier, BGCAPP Deputy Chief Scientist
Destruction Efficiency Calculations, John McArthur, BGCAPP Environmental Manager
Process & Throughput Modeling, Charles Oclassen, BGCAPP/PCAPP Throughput Engineer
SECOND COMMITTEE MEETING OCTOBER 20-21, 2015 WASHINGTON, D.C.
Objectives: To discuss the report draft, discuss any additional data gathering needed, conduct report drafting, achieve a First Full-Message Draft, make committee writing assignments, and discuss next steps.
THIRD COMMITTEE MEETING DECEMBER 1-2, 2015 WASHINGTON, D.C.
Objectives: To discuss report draft, conduct report drafting, achieve a Preconcurrence Draft, identify final tweaks, and discuss next steps.
VIRTUAL COMMITTEE MEETING DECEMBER 17, 2015
Objective: Conduct final report draft review and achieve concurrence.