Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects (2015)

Chapter: Chapter 3 - Rail Project Costs and Financial Considerations

« Previous: Chapter 2 - U.S. Rail Industry Structure and Financial Dynamics
Page 23
Suggested Citation:"Chapter 3 - Rail Project Costs and Financial Considerations." National Academies of Sciences, Engineering, and Medicine. 2015. Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects. Washington, DC: The National Academies Press. doi: 10.17226/22149.
×
Page 23
Page 24
Suggested Citation:"Chapter 3 - Rail Project Costs and Financial Considerations." National Academies of Sciences, Engineering, and Medicine. 2015. Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects. Washington, DC: The National Academies Press. doi: 10.17226/22149.
×
Page 24
Page 25
Suggested Citation:"Chapter 3 - Rail Project Costs and Financial Considerations." National Academies of Sciences, Engineering, and Medicine. 2015. Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects. Washington, DC: The National Academies Press. doi: 10.17226/22149.
×
Page 25
Page 26
Suggested Citation:"Chapter 3 - Rail Project Costs and Financial Considerations." National Academies of Sciences, Engineering, and Medicine. 2015. Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects. Washington, DC: The National Academies Press. doi: 10.17226/22149.
×
Page 26
Page 27
Suggested Citation:"Chapter 3 - Rail Project Costs and Financial Considerations." National Academies of Sciences, Engineering, and Medicine. 2015. Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects. Washington, DC: The National Academies Press. doi: 10.17226/22149.
×
Page 27

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

23 3.1 Rail Project Costs Costs are involved in every stage of a typical rail project’s lifecycle. Figure 3-1 illustrates the typical steps in the railroad project (blue arrows) and the relative cost of each stage (orange columns). The most significant costs, and by extension the major funding and financing require- ments, occur during the construction and operating phases of the project. The funding and financing approaches and mechanisms in this Guidebook focus on these two key project phases. 3.2 Capital Expenditures (Capex) Depending on the project, a rail project’s design can involve the detailed design of the rail- road alignment and supporting infrastructure (e.g., bridges/culverts and signaling systems) as well as rolling stock design. A very rough rule of thumb is that detailed design represents 10% of a project’s total capital costs. The construction of a rail project accounts for the largest share of a project’s costs. Additional costs include purchase of (or securing access to) land for the rail project, including the right of way and associated facilities (e.g., stations, yards, and maintenance facilities). In broad terms, the capital cost of rail projects can be grouped into two categories: rail infrastructure and rolling stock. 3.2.1 Rail Infrastructure Rail infrastructure consists of two primary components: land (right of way) and rail infrastructure. Land (Right of Way) Rail infrastructure is constructed on what is known as the right of way. Ownership, possession, or guaranteed access to the right of way is a necessary precondition for any rail project implementa- tion and for securing financing. Two key characteristics of the right of way are its control (e.g., who controls it and owns the right to sub-lease or allow other rail operators to use it) and whether access to the full right of way is restricted or limited in any way (e.g., is access limited to conducting rail transport or does access extend to allowing other uses, or include air rights, or sub-surface rights). Generally, private freight railroads own and control most rail rights of way in the United States. Many railroad operators have reciprocal arrangements to access each other’s right of way. Approximately 27% of the freight line-miles in the United States include more than one freight operator. In some cases, the ability to use another railroad’s lines is simply a commercial trans- action (e.g., a trackage rights agreement allows Railroad Company A to operate on a specific section of Railroad Company B’s network for a fee, usually based on gross-ton-miles but also sometimes on trains, train-miles, or car-miles). The right for one rail company to use the right C H A P T E R 3 Rail Project Costs and Financial Considerations

24 Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects of way of another rail company may also be imposed by a court or regulatory authority (e.g., STB) as a condition of a merger or as a condition of a use agreement from a third party. Class I freight railroads in the United States and Canada are required to allow intercity passenger opera- tors Amtrak and VIA Rail, respectively, to operate on certain parts of their network (for a fee). The right to use the land over or under the right of way is also a valuable asset. Both public and private rail companies have developed property over and under their right of way or sold the rights for such development to others outside of the railroads sector (e.g., property development, access for fiber-optics, pipelines, and electrical power distribution). Few people are aware that much of downtown Chicago is built on the air rights over private rail rights of way. These rights can represent a significant asset value in financing rail projects. Rail Infrastructure Components Rail infrastructure components typically include • Basic rail system components such as the rail, crossties (also called sleepers in the international rail community), ballast, and the fastening systems that connect rail and crossties. • Supporting rail infrastructure, including bridges, tunnels, power stations and sub-stations, track switches and crossovers that allow trains to change tracks, maintenance depots, workshops, and storage or marshalling yards. These components add cost and complexity and many of them have their own financing possibilities. For example, rolling stock manufacturing companies have financed maintenance depots and workshops in exchange for equipment sales and long-term maintenance contracts. • Passenger stations, office buildings and other facilities such as parking lots. Each of these assets has financing mechanisms dependent on the revenue they are expected to generate. Sometimes passenger rail operators sell the development rights over and around stations in exchange for the developer building and maintaining the station to the specification of the rail company. Source: CPCS Figure 3-1. Rail project lifecycle costs (conceptual).

Rail Project Costs and Financial Considerations 25 • Signal and train control systems, such as display systems, signal boxes, some wayside sen- sors on the rail line, communications cables connecting the local signals with the rest of the network, and power distribution systems providing power to operate the systems. Some rail lines are electrified—using electric locomotives or trains—so the infrastructure may include a means to distribute electrical power including an overhead catenary or third-rail system. The per-mile cost of constructing and maintaining railroad infrastructure varies greatly depending on the type of railroad, taking into consideration a whole range of factors, including • Population density in the area, with more densely populated urban areas possibly requiring additional investment (e.g., underground or elevated tracks, among other options); • Geography/topography (e.g., bridges, tunnels, and urban construction); • Type and number of tracks required, and acceptable gradients and curvatures (e.g., a single- track line used by occasional slow diesel freight trains can be built to much lower standards than a heavy haul freight line or a line used by frequent high-speed electric trains); • Price and access to equipment (e.g., locomotives and signaling equipment); • Climate (e.g., humidity, cold, sand, and snow); and • Access to labor and cost of labor (e.g., expensive workers or lack of trained workers). Very generally, rail infrastructure construction costs can range from $2 million per mile in flat rural areas to $300 million per mile or more in urban areas. 3.2.2 Rolling Stock The other major category of rail asset is rolling stock. Examples of rolling stock are presented in Figure 3-2. Freight Rail Rolling Stock For freight railroads, rolling stock includes locomotives and freight cars of various types. Most freight locomotives operated in the United States are diesel-electric and use diesel for fuel, although some Class I companies are testing locomotive technology powered by liquefied natural gas (LNG). Freight cars are often designed specifically for the commodity to be carried (e.g., automobiles, lumber, coal, steel, intermodal containers, and liquid tank cars or grain hop- pers). Freight rail cars in the United States are owned by various companies—shippers, leasing companies, financial institutions and, of course, railroads. Freight locomotives generally cost in the range of $3 to $4 million each. The cost of freight cars is in the range of $50,000 to $100,000 each, depending on the car. Financing and Leasing Freight Rolling Stock In North America, rail freight cars and locomotives are generally easy to finance. Because freight rolling stock (both locomotives and freight cars) can be used on any North American rail system, it is considered fungible—if it must be repossessed, there is a large resale market providing underlying security to the equipment owner. This natural market security allows financing methods wherein the equip- ment is its own security, as in a mortgage instrument. This allows low-cost types of debt financing. For example, to finance rolling stock purchases, some railroads use equipment trust certificates, a type of bond issued by the railway to a financing entity (a bank). Equipment trust certificates are described in detail in Chapter 6.

26 Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects Passenger Rail Rolling Stock For passenger rail, rolling stock includes locomotives and passenger cars. The cost of passenger rail rolling stock can vary greatly, depending on their specifications. For example, bi-level cars with toilet facilities typically cost much more than a single-level coach with seats separated by a center aisle. Some passenger trains do not use a locomotive but have electric traction motors distributed among passenger cars that can be coupled together in trains of various sizes and operated from one end of the train or the other. These trains that use an electrical power supply are called elec- tric multiple unit trains (EMUs). Trains that use diesel engines to generate distributed traction power are called diesel multiple unit trains (DMUs). Many high-speed trains found worldwide are EMUs with traction motors distributed throughout the train. EMUs and DMUs are more specialized than locomotive-hauled passenger trains—with power supply, speed, and car size and shape often designed for a specific application. Passenger train locomotives typically cost about $5 million each.26 The cost of typical pas- senger cars generally ranges from $1 to $3 million each, depending on complexity. The cost of EMUs and DMUs vary but is generally between $2 million and $10 million per car. For example, the current Eurostar trainset is a 16-car EMU costing about $100 million. 26 Passenger locomotives are usually more expensive than freight locomotives because they have head-end-power systems and more sophisticated train control systems, more safety and environmental equipment, and more stringent crash standards. Freight Train (CSX) Source: Wikipedia (Various) Locomotive-Hauled Passenger Train (Amtrak) Diesel-electric locomotives (Metro North) Electric multiple-unit (EMU) train (Australian OSCAR) Figure 3-2. Examples of rolling stock.

Rail Project Costs and Financial Considerations 27 3.3 Operating Expenditures (Opex) Ongoing operations and maintenance are carried out to provide transport services safely and for using the infrastructure, rolling stock, and other facilities, for a prolonged period. Operating costs (opex) include labor costs, fuel costs, track access charges (as applicable), as well as any administrative or overhead cost associated with the rail service. Maintenance costs are the costs associated with keeping the rail infrastructure and rolling stock in a good state of repair. This may involve repairing or replacing track, bridges, and other infrastructure components, as well as routine periodic maintenance of the rolling stock and so forth. Financing Passenger Rolling Stock Passenger cars are generally more specialized for the services to be provided. Partly because of this specialization, they are slightly more difficult to finance than freight cars. In the United States, such equipment is most often purchased by a public body and is rarely leased or rented for short terms. Private financ- ing of public rolling stock is generally constrained by tax laws. Private financing, quite prevalent in the past, is no longer used except in the form of municipal bonds and similar instruments. Sometimes builders will finance passenger roll- ing stock, but public financing is almost always less expensive. Private passenger equipment (e.g., owned by private contractors who may be contracted to provide public passenger services) can be financed in the same way as freight equipment, but this is often more expensive because such stock is generally more specialized and less fungible in secondary markets. Railroads are a very capital-intensive business. They can function for years with minimal new investment due to the long lifespan of railroad assets. However, although trains can continue to run without regular investment, costs rise for materials and maintenance, and service quality and asset values decline. A rail- road that is not regularly investing is “eating” its assets. Over the longer term, the railroad becomes unsustainable. Source: World Bank “Railway Reform Toolkit,” 2011.

Next: Chapter 4 - Funding and Financing Rail Projects »
Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects Get This Book
×
 Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s National Cooperative Rail Research Program (NCRRP) Report 1: Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects identifies alternative funding and financing tools that can be used to realize passenger and freight rail project development, including capital investments, operations, and maintenance. The report summary is available online.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!