Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

33 REFERENCES Federal Highway Administration (FHWA), FHWA Guide for Construction Contract Time Determination Procedures, FHWA, Washington, D.C., 2002 [Online]. Available: http://www.fhwa.dot.gov/ construction/contracts/t508015.cfm [accessed May 31, 2016]. Federal Highway Administration (FHWA) Research Project, Quantification of Cost, Benefits and Risk Associated with Alternate Contracting Methods and Accelerated Performance Specifications, DTFH61-13-R-00019, FHWA, Washington, D.C., 2013. Gransberg, D. and S. Senadheera, “Design-Build Contract Award Methods for Transportation Projects,” Journal of Transportation Engineering, ASCE, Vol. 125, No. 6, Nov. 1999, pp. 565–567. Gransberg, D.D., K.R. Molenaar, and J.N. Datin, NCHRP Synthesis 376: Quality Assurance in Design-Build Projects, Transportation Research Board of the National Academies, Washington, D.C., 2008. Gransberg, D. and J. Shane, NCHRP Synthesis 402: Construction Manager-at-Risk Project Delivery for Highway Programs, Transportation Research Board of the National Academies, Washington, D.C., 2010. Hancher, D. and R. Werkmeister, KY-CTDS Kentucky Contract Time Determination System, Tech. No. KYSPR-99-195, University of Kentucky, Kentucky Transportation Cabinet, Federal Highway Administration, Lexington, 2000. Kentucky Transportation Center (KYTC), Implementation of KYTC Contract Time Determination Sys- tem, KYTC, Frankfurt, 2014 [Online]. Available: http://transportation.ky.gov/Highway-Design/ Documents/Implementation%20of%20KYTC%20Contract%20Time%20Determination% 20System%2007212015.pdf [accessed June 8, 2016]. Oklahoma Department of Transportation, Development of an Improved System for Contract Time Determination (Phase I & II), Report FHWA-OK-08-02, Oklahoma City, 2008. Scott, S., K. Molenaar, D. Gransberg, and N. Smith, NCHRP Report 561: Best Value Procurement for Highway Construction Projects, Transportation Research Board of the National Academies, Washington, D.C., 2006. Stoll, B., J. O’Reilly, and L. Bell, Methodologies for Determining Construction Contract Time and Evaluating Contract Time Extensions, SCDOT Research Project 652, Clemson University, Clemson, S.C., 2006. Taylor, T., M. Brockman, D. Zhai, P. Goodrum, and R. Sturgill, “Accuracy Analysis of Selected Tools for Estimating Contract Time on Highway Construction Projects,” 2012 Construction Research Congress, West Lafayette, Ind. Taylor, T., et al., Updating the Kentucky Contract Time Determination System, Kentucky Transportation Center KTC-13-22/SPR411-11-1F, Frankfurt, 2013. Williams, R.C., “The Framework of a Multi-Level Database of Highway Construction Performance Times,” Thesis, Virginia Polytechnic Institute and State University Web, Blacksburg, April 8, 2006 [Online]. Available: http://scholar.lib.vt.edu/theses/available/etd-05032006-172014/unrestricted/ RCW_Thesis.pdf. Zhai, D., et al., “Using Parametric Modeling to Estimate Highway Construction Contract Time,” Transportation Research Record: Journal of the Transportation Research Board, No. 2573, Transportation Research Board of the National Academies, Washington, D.C., 2016, pp. 1–9.

Next: Appendix A - Survey Questionnaire »
Practices for Establishing Contract Completion Dates for Highway Projects Get This Book
×
 Practices for Establishing Contract Completion Dates for Highway Projects
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB's National Cooperative Highway Research Program (NCHRP) Synthesis 502: Practices for Establishing Contract Completion Dates for Highway Projects documents current methodologies and procedures used by state transportation agencies to estimate contract time for various highway project delivery methods. Establishing contract time is an important part of the highway project development process because it directly impacts project costs, the public, and risk for contractors.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!