National Academies Press: OpenBook

TCRP Annual Report of Progress 2017 (2017)

Chapter: Summary of Project Status

« Previous: Publications of the Transit Cooperative Research Program
Page 35
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 35
Page 36
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 36
Page 37
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 37
Page 38
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 38
Page 39
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 39
Page 40
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 40
Page 41
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 41
Page 42
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 42
Page 43
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 43
Page 44
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 44
Page 45
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 45
Page 46
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 46
Page 47
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 47
Page 48
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 48
Page 49
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 49
Page 50
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 50
Page 51
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 51
Page 52
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 52
Page 53
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 53
Page 54
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 54
Page 55
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 55
Page 56
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 56
Page 57
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 57
Page 58
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 58
Page 59
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 59
Page 60
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 60
Page 61
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 61
Page 62
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 62
Page 63
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 63
Page 64
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 64
Page 65
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 65
Page 66
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 66
Page 67
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 67
Page 68
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 68
Page 69
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 69
Page 70
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 70
Page 71
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2017. TCRP Annual Report of Progress 2017. Washington, DC: The National Academies Press. doi: 10.17226/24981.
×
Page 71

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

35 C on tra ct A m ou nt TA B LE 5 S U M M A R Y O F PR O JE C T ST A TU S TH R O U G H D EC EM B ER 3 1, 2 01 7 N o. Ti tle C on tra ct or E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s A : O PE R A TI O N S A -0 1 Fa re P ol ic ie s, S tru ct ur es , an d Te ch no lo gi es M ul tis ys te m s 4/ 1/ 19 93 6/ 30 /1 99 7 $4 49 ,9 41 $4 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 0 A -0 2 U se r's M an ua l f or A ss es si ng S er vi ce - D el iv er y S ys te m s fo r R ur al P as se ng er T ra ns po rta tio n E co so m et ric s 5/ 15 /1 99 3 5/ 19 /1 99 5 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 6 A- 03 A id s fo r R ai l C ar S id e- D oo r O bs er va tio n Te le ph on ic s C or p 6/ 7/ 19 93 2/ 28 /1 99 5 $1 99 ,7 89 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 4 A -0 4 E le ct ro ni c O n- V eh ic le P as se ng er In fo rm at io n D is pl ay s (V is ua l a nd A ud ib le ) M un ic ip al ity o f M et ro po lit an S ea ttl e 3/ 1/ 19 94 3/ 31 /1 99 6 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - P ub lis he d as R R D 5 A -0 5 In te gr at io n of L ig ht R ai l Tr an si t i nt o C ity S tre et s K or ve E ng in ee rin g 3/ 1/ 19 94 2/ 28 /1 99 6 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 7 A -0 5A (0 1) S ec on d Tr ai n C om in g W ar ni ng S ig n D em on st ra tio n Pr oj ec t Lo s An ge le s C ou nt y M et ro po lit an T ra ns it A ut ho rit y 4/ 14 /1 99 7 1/ 31 /2 00 2 $2 00 ,0 00 $2 00 ,0 00 FT A D em on st ra tio n - C om pl et ed - P ub lis he d as R R D 5 1 A -0 5A (0 2) S ec on d Tr ai n C om in g W ar ni ng S ig n D em on st ra tio n Pr oj ec t M as s Tr an si t A ge nc y, B al tim or e, M D 2/ 26 /1 99 7 1/ 31 /2 00 1 $2 00 ,0 00 $2 00 ,0 00 FT A D em on st ra tio n - C om pl et ed - P ub lis he d as R R D 5 1 A -0 6 A H an db oo k fo r A cq ui rin g D em an d- R es po ns iv e Tr an si t S of tw ar e S ys ta n 2/ 22 /1 99 4 7/ 20 /1 99 6 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 8 A -0 7 O pe ra tio na l A na ly si s of B us L an es o n A rte ria ls W ilb ur S m ith A ss oc 5/ 1/ 19 94 6/ 30 /1 99 6 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 2 6 A -0 7A O pe ra tio na l A na ly si s of B us L an es o n Ar te ria ls : A pp lic at io n an d R ef in em en t W ilb ur S m ith A ss oc 6/ 16 /1 99 7 8/ 31 /1 99 9 $7 0, 00 0 $7 0, 00 0 C om pl et ed - P ub lis he d as R R D 3 8 A -0 8 R ai l T ra ns it C ap ac ity Tr an sp or t C on su lt Lt d 3/ 1/ 19 94 10 /3 1/ 19 95 $1 99 ,6 40 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 3

36 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) A -0 9 G ui de lin es fo r T ra ns it Fa ci lit y S ig ni ng a nd G ra ph ic s K R W 4/ 18 /1 99 4 1/ 17 /1 99 6 $2 49 ,9 52 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 2 A -1 0 G ui de lin es fo r t he Lo ca tio n an d D es ig n of B us S to ps Te xa s A& M R es ea rc h Fo un da tio n 11 /1 /1 99 4 7/ 30 /1 99 6 $2 50 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 9 A -1 0A E va lu at io n of B us B ul bs Te xa s A &M R es ea rc h Fo un da tio n 2/ 27 /1 99 8 8/ 30 /2 00 0 $1 75 ,0 00 $1 75 ,0 00 C om pl et ed - P ub lis he d as R ep or t 6 5 an d W eb D oc um en t 1 9 A -1 1 Tr an si t S ch ed ul in g: B as ic an d A dv an ce d M an ua ls Tr an sp or ta tio n M an ag em en t & D es ig n 10 /1 /1 99 4 1/ 15 /1 99 7 $1 99 ,8 46 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 3 0 A -1 2 P as se ng er In fo rm at io n S er vi ce s: A G ui de bo ok fo r Tr an si t S ys te m s Te xa s A& M R es ea rc h Fo un da tio n 3/ 1/ 19 96 2/ 28 /1 99 8 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 4 5 A -1 3 Li gh t R ai l S er vi ce : P ed es tri an a nd V eh ic ul ar S af et y K or ve E ng in ee rin g 4/ 23 /1 99 6 11 /3 0/ 20 00 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - In te rim R ep or t Pu bl is he d as R R D 3 4; F in al R ep or t P ub lis he d as R ep or t 69 A -1 4 M ul tip ur po se T ra ns it P ay m en t M ed ia M ul tis ys te m s 1/ 29 /1 99 6 9/ 30 /1 99 7 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R R D 1 6 an d R ep or t 3 2 A -1 5 Tr an si t C ap ac ity a nd Q ua lit y of S er vi ce M an ua l: Fi rs t E di tio n K itt el so n an d As so c 11 /1 /1 99 6 1/ 31 /1 99 9 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R R D 3 5; W eb D oc um en t 6 ; an d as C R P -C D -2 A -1 5A Tr an si t C ap ac ity a nd Q ua lit y of S er vi ce M an ua l: S ec on d E di tio n K itt el so n an d As so c 10 /2 9/ 19 99 9/ 1/ 20 03 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 00 A -1 5B U pd at e of T ra ns it C ha pt er s of H ig hw ay C ap ac ity M an ua l K itt el so n an d As so c 9/ 10 /2 00 3 3/ 31 /2 00 4 $2 2, 00 0 $2 2, 00 0 C om pl et ed - Fo rw ar de d to H C M C om m itt ee A -1 5C Tr an si t C ap ac ity a nd Q ua lit y of S er vi ce M an ua l, Th ird E di tio n K itt el so n an d As so c 9/ 22 /2 01 0 3/ 15 /2 01 3 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 65

37 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) A -1 6 Im pr ov ed T ra ffi c S ig na l P rio rit y fo r T ra ns it U o f A riz on a 2/ 17 /1 99 7 2/ 28 /1 99 8 $1 05 ,2 70 $1 05 ,2 70 Te rm in at ed A -1 6A Im pr ov ed T ra ffi c S ig na l P rio rit y fo r T ra ns it G ar de ne r Tr an sp or ta tio n S ys te m s, In c. 6/ 7/ 19 99 11 /3 0/ 20 06 $1 94 ,7 30 $1 94 ,7 30 C om pl et ed - N ot P ub lis he d A -1 7 Jo in t O pe ra tio n of L ig ht R ai l T ra ns it or D ie se l M ul tip le U ni t V eh ic le s w ith R ai lro ad s E dw ar ds a nd K el ce y 10 /7 /1 99 6 9/ 30 /1 99 8 $2 49 ,8 20 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 5 2 A -1 7A S up pl em en tin g an d U pd at in g TC R P R ep or t 5 2: Jo in t O pe ra tio n of L ig ht R ai l T ra ns it or D ie se l M ul tip le U ni t V eh ic le s w ith R ai lro ad s E dw ar ds a nd K el ce y 8/ 18 /2 00 0 4/ 18 /2 00 1 $3 9, 99 5 $4 0, 00 0 C om pl et ed - P ub lis he d as R R D 4 3 A -1 8 E ffe ct iv e P ra ct ic es to R ed uc e B us A cc id en ts Te ch no lo gy & M an ag em en t S ys te m s 12 /1 /1 99 6 9/ 30 /1 99 9 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 6 6 A -1 9 In te gr at in g S ch oo l B us a nd P ub lic T ra ns po rta tio n S er vi ce s in N on -U rb an C om m un iti es M ul tis ys te m s 12 /1 /1 99 6 4/ 21 /1 99 9 $1 99 ,7 51 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 5 6 an d W eb D oc um en t 1 1 A -1 9A (1 ) S co pi ng S tu dy fo r P ro je ct A -1 9A (2 ) M ul tis ys te m s 4/ 1/ 20 01 12 /3 1/ 20 01 $8 ,0 59 $9 ,0 00 C om pl et ed A -1 9A (2 ) V eh ic le G ui de fo r In te gr at in g N on -U rb an S ch oo l a nd P ub lic Tr an sp or ta tio n S er vi ce s Te am , I nc . 5/ 1/ 20 02 1/ 30 /2 00 7 $1 63 ,9 86 $1 66 ,0 00 C an ce lle d A -2 0A (1 ) S tra te gi es fo r I m pr ov ed Tr av el er In fo rm at io n C ha rle s R iv er A ss oc . 6/ 22 /1 99 8 1/ 31 /2 00 2 $9 0, 41 7 $9 0, 41 7 C om pl et ed - R es ul ts to A - 20 A( 2) A -2 0A (2 ) S tra te gi es fo r I m pr ov ed Tr av el er In fo rm at io n M ul tis ys te m s, In c. 7/ 1/ 20 02 3/ 3/ 20 03 $5 0, 00 0 $3 59 ,5 83 C om pl et ed - P ub lis he d as R ep or t 9 2 A -2 0B (1 ) Tr ai ni ng fo r N ew Te ch no lo gy B at te lle 1/ 4/ 19 99 7/ 6/ 20 00 $1 09 ,1 05 $1 09 ,1 05 Te rm in at ed

38 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) A -2 0B (2 ) Tr ai ni ng fo r N ew Te ch no lo gy K le in A ss oc ia te s, In c. 1/ 3/ 20 01 2/ 15 /2 00 3 $9 0, 89 5 $9 0, 89 5 $5 0, 00 0 C om pl et ed - P ub lis he d as R ep or t 9 6 A -2 1 G ui de bo ok fo r C ha ng e an d In no va tio n at R ur al a nd S m al l U rb an T ra ns it S ys te m s K FH G ro up 8/ 25 /1 99 9 2/ 24 /2 00 1 $1 48 ,6 62 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 7 0 A -2 2 S im ul at or s an d B us S af et y: G ui de lin es fo r A cq ui rin g an d U si ng Tr an si t B us O pe ra to r D riv in g S im ul at or s M ile st on e G ro up 8/ 19 /1 99 9 7/ 30 /2 00 1 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 7 2 A -2 3 Im pl em en ta tio n G ui de lin es fo r B us R ap id T ra ns it S ys te m s D an ie l, M an n, Jo hn so n & M en de nh al l ( D M JM ) 5/ 24 /2 00 0 5/ 1/ 20 03 $2 49 ,9 80 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 9 0, V ol um es 1 a nd 2 A -2 3A B us R ap id T ra ns it P ra ct iti on er 's G ui de K itt el so n & A ss oc ia te s, In c. 11 /1 5/ 20 03 9/ 30 /2 00 6 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 18 a nd W eb -O nl y D oc um en t 3 9 A -2 4 A T oo lk it fo r S el f-S er vi ce , B ar rie r-F re e Fa re C ol le ct io n M ul tis ys te m s 8/ 30 /2 00 0 3/ 1/ 20 02 $2 49 ,9 21 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 8 0 A -2 5 Fa re P ol ic ie s, S tru ct ur es an d Te ch no lo gi es : U pd at e M ul tis ys te m s 7/ 1/ 20 01 4/ 15 /2 00 3 $2 49 ,9 39 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 9 4 A -2 6 S m ar t C ar d In te ro pe ra bi lit y Is su es fo r t he T ra ns it In du st ry A cu m en B ui ld in g E nt er pr is e 10 /1 5/ 20 03 4/ 30 /2 00 6 $2 49 ,3 23 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 15 A -2 7 S ha re d U se o f R ai lro ad In fra st ru ct ur e W ith N on - C om pl ia nt P ub lic T ra ns it R ai l V eh ic le s: A P ra ct iti on er 's G ui de B oo z- A lle n & H am ilt on 8/ 31 /2 00 5 9/ 30 /2 00 8 $1 98 ,5 64 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 30 A -2 8 G ui de bo ok fo r M iti ga tin g Fi xe d- R ou te B us -a nd - P ed es tri an C ol lis io ns S ci en ce A pp lic at io ns In te rn at io na l C or po ra tio n 11 /2 /2 00 5 9/ 15 /2 00 7 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 25

39 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) A -2 9 C on tro lli ng S ys te m C os ts : B as ic a nd A dv an ce d S ch ed ul in g M an ua ls a nd C on te m po ra ry Is su es in Tr an si t S ch ed ul in g D an B oy le & A ss oc ia te s 7/ 31 /2 00 6 3/ 15 /2 00 9 $3 75 ,0 00 $3 75 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 35 a nd W eb -O nl y D oc um en t 4 5 A -3 0 Im pr ov in g P ed es tri an a nd M ot or is t S af et y A lo ng L ig ht R ai l T ra ns it A lig nm en ts iT ra ns C on su lti ng , Lt d. 9/ 8/ 20 06 6/ 30 /2 00 9 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 37 a nd W eb -O nl y D oc um en t 4 2 A -3 1 Tr an si t, C al l C en te rs , a nd 51 1: A G ui de fo r D ec is io n M ak er s B at te lle 12 /1 5/ 20 06 6/ 30 /2 00 9 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 34 A -3 2 O pe ra tio n of L ig ht R ai l Tr an si t t hr ou gh U ng at ed C ro ss in gs a t S pe ed s O ve r 35 m ph S ci en ce A pp lic at io ns In te rn at io na l C or po ra tio n 11 /2 6/ 20 08 12 /3 1/ 20 11 $2 94 ,9 24 $2 95 ,0 00 C om pl et ed - P ub lis he d as W eb -O nl y D oc um en t 5 3 A -3 3 C om m un ic at io n w ith V ul ne ra bl e P op ul at io ns : A Tr an sp or ta tio n an d E m er ge nc y M an ag em en t To ol ki t Th e Lo ui s B er ge r G ro up , I nc . 8/ 27 /2 00 9 9/ 26 /2 01 1 $3 49 ,8 88 $3 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 50 A -3 3A U si ng P ic to gr am s to M ak e Tr an si t E as ie r t o N av ig at e fo r C us to m er s w ith C om m un ic at io n B ar rie rs Th e Lo ui s B er ge r G ro up , I nc . 12 /6 /2 01 1 9/ 30 /2 01 2 $9 9, 88 7 $1 00 ,0 00 C om pl et ed - P ub lis he d as W eb -O nl y D oc um en t 5 9 A -3 4 Im pr ov in g S af et y- R el at ed R ul es C om pl ia nc e in th e P ub lic T ra ns po rta tio n In du st ry Fo st er -M ille r, In c. 9/ 30 /2 00 9 9/ 1/ 20 11 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 49 A -3 5 Im pr ov in g S af et y C ul tu re in P ub lic T ra ns po rta tio n S am S ch w ar tz E ng in ee rin g 12 /1 5/ 20 10 10 /1 /2 01 4 $5 00 ,0 00 $5 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 74 A -3 6 C om m an d- Le ve l D ec is io n M ak in g fo r T ra ns it E m er ge nc y M an ag er s E ng in ee rin g & C om pu te r S im ul at io ns 11 /1 /2 01 0 12 /3 1/ 20 18 S . P ar ke r $6 85 ,5 51 R . L yo ns R . C he n $4 35 ,0 00 $2 25 ,8 29 (N C H R P) $1 55 ,0 00 $2 20 ,0 00 (N C H R P) In iti al R es ea rc h P ub lis he d as W eb -O nl y D oc um en t 6 0; A dd iti on al R es ea rc h in P ro gr es s

40 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) A -3 7 P ar at ra ns it E m er ge nc y O pe ra tio ns a nd P re pa re dn es s H an db oo k B C G T ra ns po rta tio n G ro up 11 /4 /2 01 0 6/ 30 /2 01 2 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 60 A -3 8 G ui de bo ok o n P ed es tri an C ro ss in gs o f P ub lic T ra ns it R ai l S er vi ce s Te xa s A& M Tr an sp or ta tio n In st itu te 2/ 1/ 20 13 11 /3 0/ 20 14 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 75 a nd W eb -O nl y D oc um en t 6 3 A -3 9 Im pr ov in g Tr an sp or ta tio n N et w or k E ffi ci en cy Th ro ug h Im pl em en ta tio n of Tr an si t-S up po rti ve R oa dw ay S tra te gi es K itt le so n & A ss oc ia te s 1/ 31 /2 01 3 10 /3 1/ 20 15 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P re -p ub lis he d as R ep or t 1 83 a nd W eb -O nl y D oc um en t 6 6 A -4 0 M an ua l t o Im pr ov e R ai l Tr an si t S af et y at P la tfo rm /T ra in a nd P la tfo rm /G ui de w ay In te rfa ce s O re go n S ta te U ni ve rs ity 12 /2 0/ 20 13 5/ 31 /2 01 6 D . S ch w ag er $2 74 ,4 31 P . C en to la nz i $2 75 ,0 00 C om pl et ed - P ub lis he d as R es ea rc h R ep or t 1 89 A -4 1 Im pr ov in g th e R es ili en cy o f Tr an si t S ys te m s Th re at en ed b y N at ur al D is as te rs Lo ui s B er ge r G ro up , In c. 2/ 24 /2 01 5 5/ 31 /2 01 7 S . P ar ke r $3 49 ,9 61 N . C hu ng A . S ch ild ge $3 50 ,0 00 C om pl et ed - P ub lis he d as W eb -O nl y D oc um en t 7 0 A -4 2 M in ut es M at te r: A G ui de to B us T ra ns it S er vi ce R el ia bi lit y P ar so ns B rin ck er ho ff 1/ 4/ 20 16 9/ 30 /2 01 8 S . P ar ke r $2 50 ,0 00 E . P ap et ti $2 50 ,0 00 R es ea rc h in P ro gr es s B : SE R VI C E C O N FI G U R A TI O N B -0 1 Tr an si t O pe ra tio ns fo r In di vi du al s w ith D is ab ili tie s E G &G D yn at re nd 6/ 1/ 19 93 3/ 31 /1 99 7 $3 44 ,9 69 $2 00 ,0 00 $1 45 ,0 00 C om pl et ed - P ub lis he d as R R D 1 , R ep or t 9 , a nd W eb D oc um en t 2 B -0 1A D em on st ra tio n of P ar at ra ns it/ Fi xe d- R ou te Fe ed er S er vi ce fo r A D A C om pl ia nc e $2 40 ,0 00 $2 40 ,0 00 FT A D em on st ra tio n - C an ce lle d B -0 2 A H an db oo k: In te gr at in g M ar ke t R es ea rc h in to Tr an si t M an ag em en t N or th w es t R es ea rc h G ro up 7/ 1/ 19 93 1/ 31 /1 99 6 $3 39 ,3 68 $6 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 3 7 an d W eb D oc um en t 3

41 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) B -0 3 W or kb oo k fo r E st im at in g D em an d fo r R ur al P as se ng er T ra ns po rta tio n S G A ss oc ia te s, In c. 6/ 1/ 19 93 2/ 28 /1 99 5 $1 99 ,6 85 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 3 B- 04 Tr an sp or ta tio n D em an d M an ag em en t ( TD M ) S tra te gi es C O M SI S C or p 6/ 15 /1 99 3 3/ 31 /1 99 6 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R R D 1 8 an d W eb D oc um en t 22 B -0 5 G ui de bo ok fo r A ttr ac tin g P ar at ra ns it P at ro ns to Fi xe d- R ou te S er vi ce s B io ne tic s C or p, K et ro n D iv is io n 2/ 22 /1 99 4 3/ 21 /1 99 6 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 2 4 B -0 6 G ui de lin es fo r E nh an ci ng S ub ur ba n M ob ili ty U si ng P ub lic T ra ns po rta tio n U rb itr an A ss oc 12 /1 /1 99 4 12 /3 1/ 19 96 $2 74 ,9 93 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 5 5 B -0 7 S tra te gi es to A ss is t L oc al Tr an sp or ta tio n A ge nc ie s in B ec om in g M ob ili ty M an ag er s C ra in & A ss oc 10 /3 /1 99 4 8/ 31 /1 99 7 $2 99 ,9 52 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 2 1 B -0 8 A G ui de bo ok fo r M ar ke tin g Tr an si t S er vi ce s to B us in es s M ul tis ys te m s 1/ 15 /1 99 6 7/ 31 /1 99 8 $1 49 ,9 85 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 5 1 an d W eb D oc um en t 8 B- 09 A H an db oo k: U si ng M ar ke t S eg m en ta tio n to In cr ea se Tr an si t R id er sh ip N or th w es t R es ea rc h G ro up 5/ 1/ 19 96 5/ 15 /1 99 8 $2 49 ,9 99 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 3 6 B -1 0 Th e R ol e of P as se ng er A m en iti es a nd V eh ic le C ha ra ct er is tic s in B ui ld in g Tr an si t R id er sh ip : A m en iti es fo r T ra ns it H an db oo k an d th e Tr an si t D es ig n G am e W or kb oo k P ro je ct fo r P ub lic S pa ce s 2/ 1/ 19 96 11 /3 0/ 19 98 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 4 6 B -1 1 A H an db oo k fo r M ea su rin g C us to m er S at is fa ct io n an d S er vi ce Q ua lit y M .O .R . P A C E 1/ 2/ 19 96 4/ 15 /1 99 8 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 4 7

42 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) B -1 2 U pd at in g th e Tr av el er R es po ns e to Tr an sp or ta tio n S ys te m C ha ng es H an db oo k R ic ha rd H . P ra tt C on su lta nt , I nc . 2/ 1/ 19 97 11 /5 /1 99 9 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as W eb D oc um en t 1 2 B- 12 A B- 12 B B- 12 C C on tin ui ng U pd at e of th e Tr av el er R es po ns e to Tr an sp or ta tio n S ys te m s C ha ng es H an db oo k R ic ha rd H . P ra tt A ss oc 11 /5 /1 99 9 12 /3 1/ 20 12 $3 00 ,0 00 $3 00 ,0 00 $7 5, 00 0 $8 1, 60 0 C om pl et ed - P ub lis he d as R ep or t 9 5 se rie s B- 13 A H an db oo k of P ro ve n M ar ke tin g S tra te gi es fo r P ub lic T ra ns it Te xa s A& M R es ea rc h Fo un da tio n 1/ 6/ 19 97 10 /6 /1 99 8 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 5 0 B -1 4 A na ly zi ng th e C os ts o f O pe ra tin g S m al l T ra ns it V eh ic le s K FH G ro up 8/ 1/ 19 97 4/ 6/ 20 00 $1 49 ,5 03 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 6 1 B -1 5 C ha ra ct er is tic s of U rb an Tr av el D em an d C am br id ge S ys te m at ic s 8/ 18 /1 99 7 9/ 30 /2 00 1 $2 49 ,9 98 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 7 3 B- 16 Th e R ol e of th e Pr iv at e- fo r- H ire V eh ic le In du st ry in P ub lic T ra ns it N or th C ar ol in a St at e U . 3/ 9/ 19 98 7/ 30 /2 00 1 $2 49 ,9 90 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 7 5 an d C R P- C D -1 6 B -1 7 G ui de bo ok fo r S el ec tin g A pp ro pr ia te T ec hn ol og y S ys te m s fo r S m al l U rb an an d R ur al P ub lic Tr an sp or ta tio n O pe ra to rs N or th C ar ol in a St at e U . 4/ 20 /1 99 8 7/ 30 /2 00 1 $1 99 ,9 05 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 7 6 an d W eb D oc um en t 2 0 B -1 8 Im pr ov in g P ub lic Tr an sp or ta tio n A cc es s to La rg e A irp or ts Le ig h Fi sh er A ss oc ia te s 12 /1 4/ 19 98 6/ 13 /2 00 0 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 6 2 B -1 8A S tra te gi es fo r I m pr ov in g P ub lic T ra ns po rta tio n A cc es s to L ar ge A irp or ts Le ig h Fi sh er A ss oc ia te s 6/ 20 /2 00 0 5/ 17 /2 00 2 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 8 3 B -1 9 Im pr ov in g P ub lic T ra ns it O pt io ns fo r O ld er P er so ns W es ta t, In c. 10 /4 /1 99 9 4/ 12 /2 00 2 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 8 2

43 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) B- 20 B- 20 A E nh an ci ng th e V is ib ili ty an d Im ag e of T ra ns it in th e U ni te d S ta te s an d C an ad a W irt hl in W or ld w id e 7/ 15 /1 99 9 9/ 1/ 20 00 $3 10 ,0 00 $2 50 ,0 00 $6 0, 00 0 C om pl et ed - P ub lis he d as R ep or t 6 3 B -2 1 E ffe ct iv e A pp ro ac he s to M ee tin g R ur al In te rc ity B us Tr an sp or ta tio n N ee ds K FH G ro up 9/ 27 /1 99 9 11 /1 6/ 20 01 $9 9, 95 7 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 7 9 B -2 2 N ew P ar ad ig m s fo r R ur al an d S m al l U rb an T ra ns it S er vi ce D el iv er y U ni ve rs ity o f A riz on a 5/ 31 /2 00 0 3/ 31 /2 00 2 $8 2, 00 0 $8 2, 00 0 C om pl et ed - S ee P ro je ct B -2 2A B -2 2A C as e S tu di es in N ew P ar ad ig m s fo r R ur al a nd S m al l U rb an T ra ns it S er vi ce D el iv er y K FH G ro up 6/ 30 /2 00 3 1/ 31 /2 00 4 $1 7, 99 5 $1 8, 00 0 C om pl et ed - P ub lis he d as R ep or t 9 9 B -2 3 R es ou rc e R eq ui re m en ts Fo r D em an d- R es po ns iv e Tr an sp or ta tio n S er vi ce s N or th w es te rn U ni ve rs ity 11 /1 /2 00 0 10 /1 /2 00 3 $2 49 ,9 71 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 9 8 B- 24 To ol ki t f or R ur al C om m un ity C oo rd in at ed Tr an sp or ta tio n S er vi ce s W es ta t, In c. 8/ 20 /2 00 1 12 /1 5/ 20 03 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 01 B -2 5 G ui de bo ok fo r E va lu at in g, S el ec tin g, a nd Im pl em en tin g S ur bu rb an Tr an si t S er vi ce s U rb itr an A ss oc ia te s, In c. 11 /1 /2 00 3 5/ 1/ 20 06 $2 99 ,9 77 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 16 a nd W eb -O nl y D oc um en t 3 4 B -2 6 C ar -S ha rin g: W he re a nd H ow It S uc ce ed s N el so n\ N yg aa rd 10 /1 0/ 20 03 10 /9 /2 00 5 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 08 B -2 7 C os t B en ef it An al ys is o f P ro vi di ng N on -E m er ge nc y M ed ic al T ra ns po rta tio n A lta ru m 12 /3 0/ 20 03 11 /1 /2 00 5 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R R D 7 5 an d W eb -O nl y D oc um en t 2 9 B -2 8 Im pr ov in g A D A C om pl em en ta ry P ar at ra ns it D em an d E st im at io n N el so n\ N yg aa rd 8/ 24 /2 00 4 3/ 31 /2 00 7 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 19

44 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) B -2 8A Im pr ov in g A D A P ar at ra ns it D em an d E st im at io n: R eg io na l M od el in g N el so n/ N yg aa rd 5/ 15 /2 00 8 4/ 30 /2 01 2 $3 30 ,0 00 $3 30 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 58 B- 29 Le ve ra gi ng IT S D at a fo r Tr an si t M ar ke t R es ea rc h: A P ra ct io ne r's G ui de bo ok P or tla nd S ta te U ni ve rs ity 2/ 3/ 20 05 11 /3 0/ 20 07 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 26 B -3 0 To ol ki t f or In te gr at in g N on - D ed ic at ed V eh ic le s in P ar at ra ns it S er vi ce N el so n\ N yg aa rd 9/ 1/ 20 04 10 /1 /2 00 7 $2 49 ,9 21 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 21 B -3 1 G ui de bo ok fo r M ea su rin g, A ss es si ng , a nd Im pr ov in g P er fo rm an ce o f D em an d- R es po ns e Tr an sp or ta tio n K FH G ro up 9/ 8/ 20 05 9/ 15 /2 00 7 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 24 B -3 1A G ui de bo ok fo r R ur al D em an d- R es po ns e Tr an sp or ta tio n: M ea su rin g, A ss es si ng , a nd Im pr ov in g P er fo rm an ce K FH G ro up 9/ 30 /2 00 7 8/ 31 /2 00 9 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 36 B -3 2 U nd er st an di ng H ow to M ot iv at e C om m un iti es to S up po rt an d R id e Pu bl ic Tr an sp or ta tio n S R B I 9/ 29 /2 00 5 10 /3 0/ 20 07 $3 24 ,5 42 $3 00 ,0 00 $2 5, 00 0 (C U TA ) C om pl et ed - P ub lis he d as R ep or t 1 22 B -3 3 P ra ct ic al M ea su re s to In cr ea se T ra ns it In du st ry A dv er tis in g R ev en ue s D en ne en & C om pa ny 3/ 19 /2 00 7 2/ 15 /2 00 9 $2 85 ,0 00 $2 85 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 33 B -3 4 R es ou rc e G ui de fo r C om m in gl in g A D A a nd N on -A D A P ar at ra ns it R id er s Tr an S ys te m s, In c. 8/ 30 /2 00 6 9/ 30 /2 01 0 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 43 B -3 5 A G ui de fo r P la nn in g an d O pe ra tin g Fl ex ib le P ub lic Tr an sp or ta tio n S er vi ce s D M P G ro up 8/ 16 /2 00 7 3/ 30 /2 01 0 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 40

45 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) B -3 6 M et ho ds fo r F or ec as tin g D em an d an d Q ua nt ify in g N ee d fo r R ur al P as se ng er Tr an sp or ta tio n: F in al W or kb oo k V an es se H an ge n B ru st lin , I nc . 12 /4 /2 00 7 9/ 30 /2 01 2 $5 99 ,1 80 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 61 a nd W eb -O nl y D oc um en t 5 8 B -3 7 E st im at io n of D em an d fo r R ur al In te rc ity B us S er vi ce s K FH G ro up , I nc . 12 /1 1/ 20 07 3/ 31 /2 01 1 $1 99 ,4 11 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 47 B -3 8 G ui de lin es fo r P ro vi di ng A cc es s to P ub lic Tr an sp or ta tio n St at io ns K itt le so n & A ss oc 9/ 17 /2 00 8 10 /1 /2 01 1 $4 89 ,2 88 $5 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 53 ; L ite ra tu re R ev ie w P ub lis he d as W eb - O nl y D oc um en t 4 4 B- 39 A ud ie nc e M ea su re m en t f or Tr an si t A dv er tis in g P eo pl e C ou nt 12 /1 /2 00 9 5/ 1/ 20 12 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - P ub lis he d as W eb -O nl y D oc um en t 5 7 B -4 0 S tra te gy G ui de to E na bl e an d P ro m ot e th e U se o f Fi xe d- R ou te T ra ns it by P eo pl e w ith D is ab ili tie s Tr an S ys te m s 9/ 30 /2 01 1 1/ 30 /2 01 4 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 63 B -4 1 Tr av el T ra in in g fo r O ld er A du lts : A H an db oo k W es ta t, In c. 11 /4 /2 01 1 1/ 31 /2 01 4 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 68 , P ar ts I an d II B -4 2 C om m un ity T oo ls to Im pr ov e Tr an sp or ta tio n O pt io ns fo r V et er an s, M ili ta ry S er vi ce M em be rs , an d Th ei r F am ili es K FH G ro up 4/ 13 /2 01 2 2/ 1/ 20 14 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 64 B- 43 U se o f W eb -B as ed R id er Fe ed ba ck to Im pr ov e P ub lic T ra ns it S er vi ce s G eo rg ia T ec h R es ea rc h C or po ra tio n 1/ 11 /2 01 3 4/ 1/ 20 15 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 79 B -4 4 Im pa ct o f t he T re nd To w ar d Se pa ra te S ta te w id e M ed ic ai d Tr an sp or ta tio n B ro ke ra ge s on H um an S er vi ce Tr an sp or ta tio n C oo rd in at io n Te xa s A& M Tr an sp or ta tio n In st itu te 1/ 10 /2 01 4 10 /3 1/ 20 17 D . S ch w ag er $3 00 ,0 00 R . O ps te lte n $3 00 ,0 00 R es ea rc h in P ro gr es s

46 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) B -4 5 Tr an sp or ta tio n to D ia ly si s C en te rs : H ea lth /T ra ns po rta tio n P ol ic y In te rs ec tio n K FH G ro up , I nc . 12 /3 /2 01 6 6/ 1/ 20 18 D . S ch w ag er $3 50 ,0 00 D . N el so n $3 50 ,0 00 R es ea rc h in P ro gr es s C : EN G IN EE R IN G O F VE H IC LE S A N D E Q U IP M EN T C -0 1 P er so na l M ob ili ty A id S ec ur em en t a nd P as se ng er R es tra in t o n Tr an si t V eh ic le s C le ve la nd C lin ic Fo un da tio n 7/ 15 /1 99 3 1/ 13 /1 99 6 $2 99 ,9 71 $3 00 ,0 00 C om pl et ed - N ot P ub lis he d C -0 2 A pp lic ab ili ty o f L ow -F lo or Li gh t R ai l V eh ic le s in N or th A m er ic a B oo z- A lle n & H am ilt on 6/ 8/ 19 93 1/ 31 /1 99 5 $1 98 ,4 97 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 2 C -0 3 W he el /R ai l N oi se C on tro l M an ua l W ils on , I hr ig & A ss oc 3/ 1/ 19 94 10 /1 5/ 19 96 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R R D 1 9 an d R ep or t 2 3 C -0 3A W he el a nd R ai l V ib ra tio n A bs or be r T es tin g an d D em on st ra tio n W ils on , I hr ig & A ss oc 9/ 1/ 19 97 10 /3 1/ 20 00 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 6 7 C -0 4 P ro cu re m en t S pe ci fic at io n G ui de lin es fo r M as s Tr an si t V eh ic le W in do w s G la zi ng U o f D ay to n 9/ 26 /1 99 4 3/ 25 /1 99 6 $1 99 ,8 75 $2 00 ,0 00 C om pl et ed - P ub lis he d as R R D 9 a nd R ep or t 1 5 C -0 5 Im pa ct o f R ad io F re qu en cy R ef ar m in g on T ra ns it C om m un ic at io ns A rth ur D L itt le 9/ 26 /1 99 4 12 /3 1/ 19 95 $1 42 ,1 51 $1 25 ,0 00 $1 7, 15 1 C om pl et ed - P ub lis he d as R ep or t 1 1 C -0 6 Im pr ov ed M et ho ds fo r In cr ea si ng W he el /R ai l A dh es io n in th e P re se nc e of N at ur al C on ta m in an ts Tr an er gy C or p 12 /1 /1 99 4 8/ 15 /1 99 6 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R R D 1 7 C -0 6A D em on st ra tio n of Im pr ov ed M et ho ds fo r In cr ea si ng W he el /R ai l A dh es io n in th e P re se nc e of N at ur al C on ta m in an ts V in ce nt T er ril l 11 /1 /1 99 7 6/ 30 /1 99 8 $1 8, 82 0 $2 62 ,0 00 S co pi ng S tu dy C om pl et ed . D em on st ra tio n Pr oj ec t C an ce lle d.

47 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) C -0 7 Te ch no lo gy A ss es sm en t o f R ef ue lin g- C on ne ct io n D ev ic es fo r C N G , L N G , an d P ro pa ne S A IC 3/ 15 /1 99 6 9/ 14 /1 99 7 $1 49 ,9 89 $1 50 ,0 00 C om pl et ed - P ub lis he d as R R D 2 5 C -0 8 E va lu at in g Fu el C ho ic es fo r T ra ns it B us O pe ra tio ns A R C AD IS G er ag ht y & M ill er , I nc . 4/ 1/ 19 96 3/ 15 /1 99 8 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 3 8 C -0 9 P ar at ra ns it V eh ic le S pe ci fic at io ns a nd R el at ed S pe ci al M ai nt en an ce R eq ui re m en ts B io ne tic s C or p, K et ro n D iv is io n 2/ 1/ 19 96 10 /3 1/ 19 99 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ar aS P E C S of tw ar e D ev el op ed C -1 0A U nd er st an di ng a nd A pp ly in g A dv an ce d O n- B oa rd B us E le ct ro ni cs Jo hn J . S ch ia vo ne , Te ch ni ca l & C or po ra te C om m un ic at io ns 6/ 16 /1 99 7 10 /1 5/ 19 98 $1 70 ,0 00 $1 70 ,0 00 C om pl et ed - P ub lis he d as R ep or t 4 3 C -1 0B H yb rid E le ct ric T ra ns it B us es : S ta tu s, B en ef its , an d Is su es N or th ea st A lte rn at iv e V eh ic le C on so rti um 6/ 15 /1 99 9 2/ 15 /2 00 0 $4 4, 58 5 $4 5, 00 0 C om pl et ed - P ub lis he d as R ep or t 5 9 C -1 0C N ew D es ig ns a nd O pe ra tin g E xp er ie nc es w ith L ow -F lo or T ra ns it B us es R ol la nd K in g 7/ 1/ 19 97 4/ 30 /1 99 8 $3 5, 00 0 $3 5, 00 0 C om pl et ed - P ub lis he d as R ep or t 4 1 C -1 1 A lte rn at iv e- Fu el T ra ns it B us H az ar d As se ss m en t M od el S A IC 12 /1 /1 99 7 12 /3 1/ 20 00 $2 99 ,9 21 $3 00 ,0 00 C om pl et ed - P ub lis he d as R R D 3 9 an d C R P- C D -4 C -1 2 S ta nd ar d Te ch ni ca l S pe ci fic at io ns fo r 3 5/ 40 - Fo ot L ow -F lo or a nd C N G Tr an si t B us es A m er ic an P ub lic Tr an sp or ta tio n A ss oc ia tio n 9/ 1/ 19 98 6/ 30 /2 00 1 $2 69 ,0 00 $2 69 ,0 00 C om pl et ed - S pe ci fic at io ns P ub lis he d by A PT A C -1 3 30 -F oo t T ra ns it B us Te ch ni ca l S pe ci fic at io n A m er ic an P ub lic Tr an sp or ta tio n A ss oc ia tio n 9/ 14 /2 00 0 6/ 30 /2 00 2 $9 2, 00 0 $9 2, 00 0 C om pl et ed - S pe ci fic at io ns P ub lis he d by A PT A

48 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) C -1 4 Te ch ni ca l A ss is ta nc e fo r D ev el op m en t o f T ra ns it B us S ta nd ar ds A m er ic an P ub lic Tr an sp or ta tio n A ss oc ia tio n 10 /1 /2 00 1 9/ 30 /2 00 8 $1 ,2 75 ,0 00 $1 25 ,0 00 (0 1) $2 50 ,0 00 (0 2) $2 50 ,0 00 (0 3) $2 50 ,0 00 (0 4) $2 50 ,0 00 (0 5) $1 50 ,0 00 (0 6) C om pl et ed - S ta nd ar ds pu bl is he d by A PT A C -1 5 A ss es sm en t o f H yb rid - E le ct ric T ra ns it B us Te ch no lo gy W es t V irg in ia U ni ve rs ity 12 /2 0/ 20 04 7/ 31 /2 00 9 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 32 C -1 6 C en te r T ru ck P er fo rm an ce of L ow -F lo or L ig ht R ai l V eh ic le s In te rfl ee t Te ch no lo gy , I nc . 10 /1 9/ 20 04 4/ 18 /2 00 6 $2 49 ,1 70 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 14 C -1 7 D ev el op m en t o f C ra sh E ne rg y M an ag em en t P er fo rm an ce R eq ui re m en ts fo r L ig ht - R ai l V eh ic le s A pp lie d R es ea rc h A ss oc ia te s, In c. 9/ 22 /2 00 5 3/ 31 /2 00 8 $2 99 ,9 90 $3 00 ,0 00 C om pl et ed - P ub lis he d as W eb -O nl y D oc um en t 4 0 C -1 8 S tra te gi c Pl an fo r M ee tin g Tr an si t I nd us try W ire le ss C om m un ic at io n N ee ds S ci en ce A pp lic at io ns In te rn at io na l C or p. 10 /2 2/ 20 08 10 /3 1/ 20 12 $2 72 ,9 72 $2 25 ,0 00 $ 4 8, 00 0 $ 5 0, 00 0 C om pl et ed - R es ou rc es to A P TA C -1 9 G ui de bo ok fo r E va lu at in g Fu el C ho ic es fo r P os t- 20 10 T ra ns it B us P ro cu re m en ts S ci en ce A pp lic at io ns In te rn at io na l C or po ra tio n 11 /1 5/ 20 07 12 /3 1/ 20 10 $3 00 ,0 00 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 46 C -2 0 U se o f M ob ili ty D ev ic es o n P ar at ra ns it V eh ic le s an d B us es O re go n S ta te U ni ve rs ity 11 /4 /2 01 1 12 /3 1/ 20 13 $3 99 ,1 57 $4 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 71 C -2 1 P os iti ve T ra in C on tro l (P TC ) R ad io S pe ct ru m P la nn in g fo r P as se ng er C om m ut er R ai l O pe ra to rs in th e U ni te d S ta te s C an ce lle d C -2 2 B us O pe ra to r W or ks ta tio n D es ig n fo r I m pr ov in g O cc up at io na l H ea lth a nd S af et y V irg in ia T ec h 1/ 15 /2 01 4 3/ 1/ 20 16 $2 75 ,0 00 $2 75 ,0 00 C om pl et ed - P ub lis he d as TC R P R ep or t 1 85

49 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) C -2 3 A ss es si ng a nd M iti ga tin g E le ct ric al F ire s on T ra ns it V eh ic le s TR C E ng in ee rin g S er vi ce s 1/ 5/ 20 17 1/ 4/ 20 19 S . P ar ke r $3 00 ,0 00 E . M ad is on $1 50 ,0 00 $1 50 ,0 00 R es ea rc h in P ro gr es s C -2 4 Tr ac tio n Po w er C ab le s: R ep la ce m en t G ui de lin es S . P ar ke r $2 50 ,0 00 M . M or ri In D ev el op m en t D : EN G IN EE R IN G O F FI XE D F A C IL IT IE S D -0 1 R ai l C or ru ga tio n M iti ga tio n in T ra ns it A ss oc o f A m er ic an R ai lro ad s 8/ 22 /1 99 4 11 /3 0/ 19 97 $2 70 ,0 00 $5 00 ,0 00 C om pl et ed - P ub lis he d as R R D 2 6 D -0 2 D er ai lm en t o f T ra ns it V eh ic le s in S pe ci al Tr ac kw or k Ze ta -T ec h As so c 4/ 1/ 19 94 6/ 30 /1 99 6 $3 99 ,9 56 $4 00 ,0 00 C om pl et ed - P ub lis he d as R R D 1 5 D -0 3 Tu nn el T ra ck R ec on st ru ct io n M et ho ds U si ng P re ca st C on cr et e S ys te m s Lo ui s B er ge r & A ss oc 6/ 1/ 19 94 12 /3 1/ 19 94 $3 0, 89 5 $4 50 ,0 00 Te rm in at ed D -0 3A Tu nn el T ra ck R ec on st ru ct io n M et ho ds U si ng P re ca st C on cr et e S ys te m s Th om as D ye r 9/ 1/ 19 95 12 /3 1/ 19 96 $3 9, 92 1 $3 9, 92 1 C om pl et ed - N ot P ub lis he d D -0 4 R ed uc in g th e V is ua l Im pa ct o f O ve rh ea d C on ta ct S ys te m s U rb itr an A ss oc 12 /1 5/ 19 93 5/ 31 /1 99 5 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 7 D -0 5 P er fo rm an ce o f D ire ct - Fi xa tio n Tr ac k St ru ct ur e: D es ig n G ui de lin es a nd S of tw ar e B at te lle M em or ia l In st 2/ 23 /1 99 5 6/ 22 /1 99 9 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as C R P -C D -3 D -0 6 Tr ac k D es ig n H an db oo k fo r L ig ht R ai l T ra ns it P ar so ns , B rin ck er ho ff, Q ua de , & D ou gl as 1/ 2/ 19 96 8/ 30 /1 99 9 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 5 7

50 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) D -0 7 Jo in t R ai l-R el at ed R es ea rc h w ith th e A ss oc ia tio n of A m er ic an R ai lro ad s/ TT C I Tr an sp or ta tio n Te ch no lo gy C en te r, In c. 10 /2 8/ 19 99 12 /3 1/ 20 18 S . P ar ke r $1 ,7 76 ,8 96 T. W ill ia m s $2 50 ,0 00 (9 9) $2 00 ,0 00 (0 0) $1 50 ,0 00 (0 2) $1 50 ,0 00 (0 3) $ 5 0, 00 0 (0 4) $1 50 ,0 00 (0 5) $1 50 ,0 00 (0 7) $2 00 ,0 00 (0 9) $4 76 ,8 96 (1 1) $2 50 ,0 00 (1 5) C on tin ui ng P ro je ct - S ee D -7 Ta bl e D -0 8 Im pr ov in g P ed es tri an S af et y at U ns ig na liz ed R oa dw ay C ro ss in gs Te xa s Tr an sp or ta tio n In st itu te 10 /1 /2 00 2 3/ 6/ 20 06 $5 50 ,0 00 $2 75 ,0 00 (T C R P) $2 75 ,0 00 (N C H R P) C om pl et ed - P ub lis he d as R ep or t 1 12 a nd W eb -O nl y D oc um en t 3 0 D -0 9 Tr an si t V eh ic le s an d Fa ci lit ie s on S tre et s an d H ig hw ay s P ar so ns B rin ck er ho ff Q ua de & D ou gl as 11 /1 /2 00 2 6/ 30 /2 00 7 $3 49 ,9 69 $3 50 ,0 00 C om pl et ed - P ub lis he d by A A SH TO D -1 0 A ud ib le S ig na ls fo r P ed es tri an S af et y in L ig ht R ai l T ra ns it E nv iro nm en ts K or ve E ng in ee rin g 10 /3 /2 00 3 1/ 31 /2 00 7 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - P ub lis he d as R R D 8 4 an d W eb -O nl y D oc um en t 3 5 D -1 1 D es ig n, O pe ra tio n, a nd S af et y of A t-G ra de C ro ss in gs o f E xc lu si ve B us w ay s B M I - S G 9/ 29 /2 00 4 2/ 15 /2 00 7 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 17 a nd W eb -O nl y D oc um en t 3 6 D -1 2 G ro un d- B or ne N oi se a nd V ib ra tio n in B ui ld in gs C au se d by R ai l T ra ns it A ce nt ec h, In c. 9/ 16 /2 00 5 12 /3 1/ 20 09 $4 24 ,8 67 $4 25 ,0 00 C om pl et ed - P ub lis he d as W eb -O nl y D oc um en t 4 8 D -1 3 A G ui de fo r I m pl em en tin g B us -o n- Sh ou ld er (B O S ) S ys te m s W ilb ur S m ith A ss oc ia te s, In c. 9/ 15 /2 00 6 4/ 30 /2 01 1 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 51 D -1 4 Tr ac k D es ig n H an db oo k fo r L ig ht R ai l T ra ns it, S ec on d E di tio n P B A m er ic as , I nc . 9/ 24 /2 00 9 11 /3 0/ 20 11 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 55

51 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) D -1 5 E ffe ct iv e P ra ct ic es fo r t he P ro te ct io n of Tr an sp or ta tio n In fra st ru ct ur e fro m C yb er In ci de nt s C ou nt er m ea su re s A ss es sm en t a nd S ec ur ity E xp er ts , LL C 5/ 2/ 20 13 12 /3 1/ 20 15 $3 00 ,0 00 $1 50 ,0 00 (T C R P) $1 50 ,0 00 (N C H R P) C om pl et ed - P ub lis he d as W eb -O nl y D oc um en t 6 7 D -1 6 Im pr ov in g th e S af et y an d S us ta in ab ili ty o f S tra y C ur re nt C on tro l o f D C - P ow er ed R ai l T ra ns it S ys te m s C or rp ro C om pa ni es , In c. 2/ 16 /2 01 2 3/ 30 /2 01 8 S . P ar ke r $3 49 ,9 21 R . C he n $3 50 ,0 00 R es ea rc h in P ro gr es s D -1 7 D et ec tin g an d M iti ga tin g Lo w -L ev el D C L ea ka ge an d Fa ul t C ur re nt s in Tr an si t U ni ve rs ity o f A kr on 10 /2 4/ 20 14 9/ 30 /2 01 7 S . P ar ke r $2 50 ,0 00 T. W ill ia m s $2 50 ,0 00 C om pl et ed - P ub lic at io n P en di ng D -1 8 A T ra ns it A ge nc y G ui de to E va lu at in g S ec on da ry Tr ai n D et ec tio n/ P ro te ct io n S ys te m s in C om m un ic at io ns -B as ed Tr ai n C on tro l ( C B TC ) S ys te m s C H 2M H ill 2/ 5/ 20 16 7/ 3/ 20 17 S . P ar ke r $1 97 ,6 24 P . C en to la nz i $2 00 ,0 00 C om pl et ed - P ub lic at io n P en di ng E : M A IN TE N A N C E E- 01 Le ve ra gi ng In fo rm at io n fo r B et te r T ra ns it M ai nt en an ce R AN D C or p 9/ 1/ 19 93 11 /3 0/ 19 95 $3 49 ,8 90 $3 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R R D 1 3 E -0 2 A rti fic ia l I nt el lig en ce Te ch no lo gy fo r T ra ns it R ai lc ar D ia gn os tic s A N S TE C 5/ 17 /1 99 3 6/ 16 /1 99 4 $1 49 ,5 97 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 E -0 2A D em on st ra tio n of A rti fic ia l In te llig en ce T ec hn ol og y fo r R ai lc ar D ia gn os tic s A N S TE C 2/ 27 /1 99 7 10 /3 1/ 19 98 $1 99 ,9 47 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 4 4 E -0 3 A D es k G ui de fo r I nv en to ry M an ag er s in th e Tr an si t In du st ry K lic k, K en t, & A lle n, In c. 12 /1 /1 99 3 7/ 31 /1 99 5 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R R D 2 8 an d W eb D oc um en t 4

52 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) E -0 3A R ev is ed In ve nt or y M an ag em en t D es k G ui de D ra yc ot t C on su lti ng 10 /1 /1 99 7 3/ 31 /2 00 0 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R R D 4 0 an d W eb D oc um en t 17 E -0 4 G ui de lin es fo r t he D ev el op m en t o f P ub lic Tr an sp or ta tio n Fa ci lit ie s an d E qu ip m en t M an ag em en t S ys te m s P ar so ns , B rin ck er ho ff, Q ua de , & D ou gl as 6/ 10 /1 99 4 9/ 30 /1 99 5 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 5 E -0 5 G ui de bo ok fo r D ev el op in g an d S ha rin g Tr an si t B us M ai nt en an ce P ra ct ic es Tr an si t R es ou rc e C en te r 9/ 26 /2 00 3 7/ 15 /2 00 5 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 09 E -0 6 Tr an si t B us M ec ha ni cs : B ui ld in g fo r S uc ce ss - Th e A S E Tr an si t B us M ai nt en an ce C er tif ic at io n Te st S er ie s N at io na l I ns tit ut e fo r A ut om ot iv e S er vi ce E xc el le nc e (A S E ) 8/ 1/ 20 04 6/ 30 /2 01 2 $8 45 ,6 08 $4 50 ,0 00 (0 4) $3 00 ,0 00 (0 5) $3 00 ,0 00 (0 7) $2 75 ,0 00 (0 8) C om pl et ed - 8 AS E T ra ns it B us T es ts N ow O ffe re d E -0 7 E st ab lis hi ng a N at io na l Tr an si t I nd us try R ai l V eh ic le T ec hn ic ia n Q ua lif ic at io n P ro gr am : B ui ld in g fo r S uc ce ss Tr an sp or ta tio n Le ar ni ng C en te r 7/ 18 /2 00 8 3/ 1/ 20 14 $1 ,9 00 ,0 00 $4 00 ,0 00 (0 8) $4 00 ,0 00 (0 9) $4 00 ,0 00 (1 0) $2 00 ,0 00 (1 1) $5 00 ,0 00 (1 2) C om pl et ed - P ub lis he d as R ep or t 1 70 E -0 8 E xt en di ng a nd D ee pe ni ng N at io na l T ra ns it Tr ai ni ng S ta nd ar ds Tr an sp or ta tio n Le ar ni ng C en te r (T LC ) 7/ 14 /2 00 8 10 /1 3/ 20 09 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - R es ul ts U se d by T LC E- 09 S ta te o f G oo d R ep ai r: P rio rit iz in g th e R eh ab ilit at io n an d R ep la ce m en t o f E xi st in g C ap ita l A ss et s an d E va lu at in g th e Im pl ic at io ns fo r T ra ns it S py P on d Pa rtn er s 10 /6 /2 01 0 3/ 31 /2 01 2 $1 50 ,0 00 $1 50 ,0 00 (1 0) C om pl et ed - P ub lis he d as R ep or t 1 57 E -0 9A G ui da nc e fo r D ev el op in g a Tr an si t A ss et M an ag em en t P la n S py P on d Pa rtn er s 9/ 25 /2 01 2 6/ 30 /2 01 4 $3 50 ,0 00 $3 50 ,0 00 (1 2) C om pl et ed - P ub lis he d as R ep or t 1 72

53 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) E -1 0 M ai nt en an ce T ec hn ic ia n S ta ffi ng L ev el s fo r M od er n P ub lic T ra ns it Fl ee ts E D S I C on su lti ng 1/ 23 /2 01 3 7/ 30 /2 01 5 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 84 E -1 1 Th e R el at io ns hi p B et w ee n Tr an si t A ss et C on di tio n an d S er vi ce Q ua lit y S py P on d Pa rtn er s 11 /5 /2 01 5 3/ 30 /2 01 8 D . S ch w ag er $3 50 ,0 00 M . S ch ill in g M . S m ith $3 50 ,0 00 R es ea rc h in P ro gr es s E -1 2 G ui da nc e fo r C al cu la tin g th e R et ur n on In ve st m en t in T ra ns it S ta te o f G oo d R ep ai r S py P on d Pa rtn er s 10 /2 1/ 20 16 4/ 20 /2 01 8 D . S ch w ag er $3 00 ,0 00 E . H u $3 00 ,0 00 R es ea rc h in P ro gr es s F : H U M A N R ES O U R C ES F- 01 Fi tn es s- fo r-D ut y Te st in g in th e Tr an si t W or kp la ce B at te lle M em or ia l In st 6/ 1/ 19 93 10 /3 1/ 19 96 $4 74 ,3 50 $3 00 ,0 00 $5 00 ,0 00 C om pl et ed - N ot P ub lis he d F- 02 In no va tiv e La bo r- M an ag em en t P ra ct ic es M er ce r M an ag em en t C on su lt 7/ 15 /1 99 3 10 /3 1/ 19 94 $1 99 ,9 35 $2 50 ,0 00 C om pl et ed - N ot P ub lis he d F- 03 A Q ua lit y Jo ur ne y: A T Q M R oa dm ap fo r P ub lic Tr an sp or ta tio n M ac D or m an & A ss oc 5/ 10 /1 99 3 11 /1 0/ 19 95 $5 00 ,0 00 $5 00 ,0 00 C om pl et ed - P ub lis he d as R R D 3 a nd R ep or t 8 F- 04 B us O pe ra to r W or ks ta tio n E va lu at io n an d D es ig n G ui de lin es P en n S ta te U 5/ 1/ 19 94 2/ 28 /1 99 7 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 2 5 an d W eb D oc um en t 1 F- 05 C lo si ng th e K no w le dg e G ap fo r T ra ns it V eh ic le M ai nt en an ce E m pl oy ee s- - A S ys te m s Ap pr oa ch R AN D C or p 10 /1 0/ 19 94 9/ 9/ 19 96 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 2 9 F- 06 G ui de lin es fo r t he E ffe ct iv e U se o f U ni fo rm ed T ra ns it P ol ic e/ S ec ur ity P er so nn el In te ra ct iv e E le m en ts 12 /1 2/ 19 94 5/ 29 /1 99 7 $3 99 ,4 90 $4 00 ,0 00 C om pl et ed - P ub lis he d as W eb D oc um en t 1 5 F- 06 A G ui de lin es fo r C ol le ct in g, A na ly zi ng , a nd R ep or tin g Tr an si t C rim e D at a Te ch no lo gy & M an ag em en t S ys te m s, In c. 4/ 1/ 19 98 3/ 31 /2 00 0 $1 50 ,0 00 $1 75 ,0 00 C om pl et ed - P ub lis he d as R R D 4 1

54 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) F- 07 P ar t-T im e Tr an si t O pe ra to rs : T he T re nd s an d Im pa ct s C ha rle s R iv er A ss oc 10 /1 5/ 19 97 10 /3 1/ 20 00 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 6 8 F- 09 M an ag in g Tr an si t's W or kf or ce in th e N ew M ill en ni um M cG lo th in D av is , I nc . 2/ 1/ 20 00 1/ 30 /2 00 2 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 7 7 F- 10 To ol bo x fo r T ra ns it O pe ra to r F at ig ue Fo st er -M ill er , I nc . 10 /1 5/ 20 00 6/ 30 /2 00 2 $2 99 ,8 28 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 8 1 F- 11 P os iti on in g th e P ub lic Tr an sp or ta tio n O pe ra tin g A ge nc y as a n Em pl oy er o f C ho ic e W at so n W ya tt W or ld w id e 9/ 12 /2 00 2 10 /1 5/ 20 03 $2 99 ,7 05 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 03 F- 12 E m pl oy ee C om pe ns at io n G ui de lin es fo r T ra ns it P ro vi de rs in R ur al a nd S m al l U rb an A re as K FH G ro up 9/ 27 /2 00 5 3/ 3/ 20 08 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 27 F- 13 V eh ic le O pe ra to r R ec ru itm en t, R et en tio n an d P er fo rm an ce in A D A C om pl em en ta ry P ar at ra ns it O pe ra tio ns Tr an S ys te m s 9/ 4/ 20 07 1/ 30 /2 01 0 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 42 F- 14 G ui de bo ok fo r R ec ru iti ng , D ev el op in g, a nd R et ai ni ng Tr an si t M an ag er s fo r F ix ed - R ou te a nd P ar at ra ns it S ys te m s IC F, In c. 9/ 12 /2 00 8 2/ 26 /2 01 0 $2 49 ,9 98 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 39 F- 15 A P ra ct ic al G ui de fo r R ec ru iti ng M in or iti es fo r C hi ef E xe cu tiv e O ffi ce rs a t P ub lic T ra ns po rta tio n A ge nc ie s G en er at or G ro up , LL C 12 /5 /2 00 8 3/ 30 /2 01 1 $2 49 ,9 45 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 48 F- 16 B ui ld in g a Su st ai na bl e W or kf or ce in th e P ub lic Tr an sp or ta tio n In du st ry - A S ys te m s A pp ro ac h Tr an sp or ta tio n Le ar ni ng C en te r 9/ 29 /2 01 0 3/ 28 /2 01 1 $1 49 ,2 78 $1 50 ,0 00 C om pl et ed - R es ul ts to F -1 6A

55 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) F- 16 A B ui ld in g a Su st ai na bl e W or kf or ce in th e P ub lic Tr an sp or ta tio n In du st ry - A S ys te m s A pp ro ac h IC F, In c. 9/ 30 /2 01 1 4/ 30 /2 01 3 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 62 F- 17 D ev el op in g B es t P ra ct ic e G ui de lin es fo r I m pr ov in g B us O pe ra to r H ea lth a nd R et en tio n Tr an sp or ta tio n Le ar ni ng C en te r 10 /1 3/ 20 11 11 /3 0/ 20 13 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 69 F- 18 P ol ic in g an d S ec ur ity P ra ct ic es fo r S m al l- an d M ed iu m -S iz ed T ra ns it S ys te m s C ou nt er m ea su re A ss es sm en t a nd S ec ur ity E xp er ts , LL C 9/ 30 /2 01 1 11 /1 3/ 20 14 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 80 F- 19 A N at io na l T ra in in g an d C er tif ic at io n P ro gr am fo r Tr an si t V eh ic le M ai nt en an ce In st ru ct or s Tr an sp or ta tio n Le ar ni ng C en te r 1/ 21 /2 01 3 10 /3 1/ 20 14 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 78 F- 20 La bo r- M an ag em en t P ar tn er sh ip s in P ub lic Tr an sp or ta tio n A E C O M T ec hn ic al S er vi ce s, In c. 11 /1 2/ 20 12 8/ 15 /2 01 5 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 81 , V ol um es 1 a nd 2 F- 21 To ol s an d S tra te gi es fo r E lim in at in g A ss au lts A ga in st T ra ns it O pe ra to rs C ou nt er -m ea su re s A ss es sm en t & S ec ur ity E xp er ts , LL C 12 /1 3/ 20 13 7/ 30 /2 01 7 G . C hi sh ol m $3 00 ,0 00 J. P ow el l $3 00 ,0 00 C om pl et ed . W ill b e pu bl is he d as R es ea rc h R ep or t 1 93 . F- 22 Id en tif yi ng B es t P ra ct ic es an d Sh ar in g R es ou rc es fo r Tr an si t T ec hn ic al T ra in in g IC F, In c. 10 /2 8/ 20 15 3/ 30 /2 01 8 G . C hi sh ol m $3 00 ,0 00 B . J ac ks on $3 00 ,0 00 R es ea rc h in P ro gr es s F- 23 K no w le dg e M an ag em en t R es ou rc e to S up po rt S tra te gi c W or kf or ce D ev el op m en t f or T ra ns it A ge nc ie s IC F, In c. 11 /3 /2 01 5 8/ 30 /2 01 7 D . S ch w ag er $3 00 ,0 00 T. D ex te r $3 00 ,0 00 R es ea rc h C om pl et ed . P ub lic at io n P en di ng .

56 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) F- 24 O ve rc om in g B ar rie rs to Im pl em en tin g B es t a nd In no va tiv e Tr ai ni ng P ra ct ic es fo r P ub lic Tr an sp or ta tio n' s Fr on tli ne W or kf or ce IC F, In c, 10 /2 8/ 20 15 3/ 30 /2 01 8 G . C hi sh ol m $3 00 ,0 00 B . J ac ks on $3 00 ,0 00 R es ea rc h in P ro gr es s F- 25 Im pr ov in g th e S af et y, H ea lth , a nd P ro du ct iv ity o f Tr an si t O pe ra to rs T hr ou gh A de qu at e R es tro om A cc es s R es ea rc h Fo un da tio n of C ity U ni ve rs ity o f N ew Yo rk 2/ 2/ 20 17 11 /1 /2 01 8 G . C hi sh ol m $3 00 ,0 00 H . J en se n $3 00 ,0 00 R es ea rc h in P ro gr es s F- 26 Im pr ov in g th e H ea lth a nd S af et y of th e Tr an si t W or kf or ce w ith C or re sp on di ng Im pa ct s on th e B ot to m -L in e: M ed ic al Q ua lif ic at io n, H ea lth C ar e an d U se o f R x/ O TC L. G ol ds te in K . B la ck s $2 50 ,0 00 In D ev el op m en t G : A D M IN IS TR A TI O N G -0 1 In fo rm at io n Te ch no lo gi es -- S ta te -o f-t he -A rt A pp lic at io ns fo r T ra ns it P ro pe rti es C as tle R oc k C on su lt 12 /1 /1 99 3 5/ 31 /1 99 5 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - N ot P ub lis he d G -0 2 B ar C od in g in T ra ns it O pe ra tio ns a nd M ai nt en an ce Te le ph on ic s C or p 11 /1 5/ 19 93 9/ 14 /1 99 5 $1 49 ,9 99 $1 50 ,0 00 C om pl et ed - P ub lis he d as W eb D oc um en t 1 0 G -0 3 Tr an si t R is k M an ag er fo r B us S ys te m s R is k M an ag em en t C en te r 10 /1 /1 99 4 5/ 31 /1 99 6 $1 92 ,9 64 $1 95 ,0 00 C om pl et ed - P ub lis he d as R R D s 11 a nd 1 2; R is k M an ag er S of tw ar e D ev el op ed G -0 4 D ev el op in g St an da rd s fo r S ys te m a nd S ub sy st em In te rfa ce s in E le ct ric R ai l P as se ng er V eh ic le s Th om as J M cG ea n 1/ 15 /1 99 6 10 /1 /1 99 7 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - P ro je ct C on tin ue d as G -0 4A

57 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) G -0 4A G -0 4B D ev el op in g S ta nd ar ds fo r S ys te m a nd S ub sy st em In te rfa ce s in E le ct ric R ai l P as se ng er V eh ic le s - E xt en si on Th om as J M cG ea n 9/ 1/ 19 97 2/ 28 /2 00 2 $7 55 ,1 48 $2 75 ,0 00 $3 25 ,0 00 $3 00 ,0 00 $3 20 ,0 00 C om pl et ed - P ub lis he d as R R D 4 4 G -0 4C D ev el op in g St an da rd s fo r S ys te m a nd S ub sy st em In te rfa ce s in E le ct ric R ai l P as se ng er V eh ic le s - Tr an si tio n to A P TA A m er ic an P ub lic Tr an sp or ta tio n A ss oc ia tio n 4/ 1/ 20 02 7/ 31 /2 00 3 $7 5, 00 0 $7 5, 00 0 C om pl et ed - A P TA S ta nd ar ds P ub lis he d G -0 5 M an ag em en t T oo lk it fo r S m al l U rb an a nd R ur al P ub lic T ra ns po rta tio n S ys te m s K FH G ro up 2/ 1/ 19 97 3/ 31 /1 99 9 $2 49 ,8 96 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 5 4 G -0 6 A G ui de bo ok fo r D ev el op in g a Tr an si t P er fo rm an ce - M ea su re m en t S ys te m K itt le so n & A ss oc ia te s 6/ 28 /2 00 1 11 /2 8/ 20 02 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 8 8 an d R R D 5 6 G -0 7 M an ag in g C ap ita l C os ts o f M aj or F ed er al ly F un de d P ub lic T ra ns po rta tio n P ro je ct s B oo z, A lle n & H am ilt on 9/ 10 /2 00 3 12 /1 /2 00 5 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R R D 7 8 an d W eb -O nl y D oc um en t 3 1 G -0 8 A G ui de bo ok fo r t he E va lu at io n of P ro je ct D el iv er y M et ho ds N or th ea st er n U ni ve rs ity 10 /1 /2 00 6 10 /3 1/ 20 08 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 31 a nd W eb -O nl y D oc um en t 4 1 G -0 9 S ha rin g th e C os ts o f H um an S er vi ce s Tr an sp or ta tio n W es ta t 10 /1 5/ 20 06 9/ 30 /2 01 0 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 44 G -1 0 E st im at in g S of t C os ts fo r M aj or P ub lic Tr an sp or ta tio n Fi xe d G ui de w ay P ro je ct s A E C O M C on su lt 8/ 24 /2 00 7 12 /1 /2 00 9 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 38

58 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) G -1 1 A M et ho do lo gy fo r P er fo rm an ce M ea su re m en t a nd P ee r C om pa ris on in th e Pu bl ic Tr an sp or ta tio n In du st ry K itt le so n & A ss oc ia te s 11 /1 /2 00 7 3/ 1/ 20 10 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 41 G -1 2 Fu el P ur ch as in g S tra te gi es fo r P ub lic T ra ns it A ge nc ie s S ci en ce A pp lic at io ns In te rn at io na l C or po ra tio n 12 /1 1/ 20 09 3/ 2/ 20 12 $2 99 ,9 97 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 56 G -1 3 D ev el op in g an IT S Te ch no lo gy W eb P or ta l f or Tr an si t S ys te m L ea de rs C on ce ns us S ys te m s Te ch no lo gi es C or p. 11 /1 5/ 20 11 12 /3 1/ 20 15 $9 9, 99 3 $1 00 ,0 00 C om pl et ed - R es ul ts to A P TA G -1 4 C on tra ct in g C om m ut er R ai l S er vi ce s Te xa s A& M Tr an sp or ta tio n In st itu te 2/ 18 /2 01 5 2/ 28 /2 01 8 G . C hi sh ol m $3 00 ,0 00 S . M ai a $3 00 ,0 00 R es ea rc h in P ro gr es s G -1 5 P ub lic T ra ns po rta tio n R es ou rc e fo r S m al l- an d M ed iu m -s iz ed P 3 In iti at iv es P ar so ns , B rin ck er ho ff 9/ 25 /2 01 5 1/ 24 /2 01 7 D . S ch w ag er $1 50 ,0 00 T. Y ed in ak $1 50 ,0 00 C om pl et ed - P ub lis he d as TC R P R es ea rc h R ep or t 1 91 G -1 6 D ev el op m en t o f Tr an sa ct io na l D at a S pe ci fic at io ns fo r D em an d- R es po ns iv e Tr an sp or ta tio n D em an d Tr an s S ol ut io n 11 /1 6/ 20 16 5/ 15 /2 01 8 D . S ch w ag er $2 50 ,0 00 $2 50 ,0 00 R es ea rc h in P ro gr es s G -1 7 A ss es si ng L ife cy cl e an d H um an C os ts o f B us O pe ra to r W or ks ta tio n D es ig n an d C om po ne nt s S . P ar ke r S . P er ei ra D . S pr at lin g $2 50 ,0 00 In D ev el op m en t H : PO LI C Y A N D P LA N N IN G H -0 1 Tr an si t a nd U rb an F or m P ar so ns , B rin ck er ho ff, Q ua de , & D ou gl as 6/ 10 /1 99 3 3/ 31 /1 99 6 $6 00 ,0 00 $6 00 ,0 00 C om pl et ed - P ub lis he d as R R D 7 a nd R ep or t 1 6 H -0 2 M ea su rin g an d V al ui ng Tr an si t B en ef its a nd D is be ne fit s C am br id ge S ys te m at ic s 5/ 26 /1 99 3 5/ 31 /1 99 6 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 2 0

59 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) H -0 3 S tra te gi es to A ttr ac t A ut o U se rs to P ub lic Tr an sp or ta tio n P or tla nd S ta te U 5/ 2/ 19 94 10 /3 1/ 19 96 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 4 0 H -0 4A B ui ld in g Tr an si t R id er sh ip : A n E xp lo ra tio n of T ra ns it' s M ar ke t S ha re a nd th e P ub lic P ol ic ie s th at In flu en ce It C ha rle s R iv er A ss oc 10 /1 7/ 19 94 10 /1 6/ 19 97 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 2 7 H -0 4B Tr an si t M ar ke ts o f t he Fu tu re - Th e C ha lle ng e of C ha ng e U o f A riz on a 2/ 1/ 19 95 4/ 30 /1 99 7 $2 49 ,9 95 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 2 8 H -0 4C In st itu tio na l B ar rie rs to In te rm od al T ra ns po rta tio n P ol ic ie s an d P la nn in g in M et ro po lit an A re as C ra in & A ss oc 10 /3 /1 99 4 6/ 30 /1 99 6 $2 49 ,9 98 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 4 H -0 4D Th e R ol e of T ra ns it in C re at in g Li va bl e M et ro po lit an C om m un iti es P ro je ct fo r P ub lic S pa ce s 10 /3 /1 99 4 7/ 31 /1 99 7 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 2 2 H -0 4D (2 ) Tr an si t-F rie nd ly S tre et s: D es ig n an d Tr af fic M an ag em en t S tra te gi es to S up po rt Li va bl e C om m un iti es P ro je ct fo r P ub lic S pa ce s 7/ 1/ 19 96 7/ 31 /1 99 7 $7 5, 00 0 $7 5, 00 0 C om pl et ed - P ub lis he d as R ep or t 3 3 H -0 4E S us ta in ab le T ra ns po rta tio n TR B S tu di es a nd In fo rm at io n Se rv ic es D iv is io n 5/ 1/ 19 94 12 /3 1/ 19 96 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as TR B S pe ci al R ep or t 2 51 H -0 5 R es ea rc h A ge nd a fo r In cr ea si ng T ra ns it R id er sh ip N /A 11 /1 8/ 19 94 11 /1 9/ 19 94 $5 4, 82 8 $2 00 ,0 00 C om pl et ed - P ub lis he d as R R D 6 H -0 6 C oo rd in at ed In te rm od al Tr an sp or ta tio n P ric in g an d Fu nd in g St ra te gi es M ul tis ys te m s 12 /1 /1 99 4 6/ 30 /1 99 7 $1 50 ,0 00 $2 00 ,0 00 C om pl et ed - P ub lis he d as R R D 1 4 H -0 7 Fu nd in g St ra te gi es fo r P ub lic T ra ns po rta tio n P ric e W at er ho us e 2/ 15 /1 99 6 12 /3 1/ 19 97 $1 99 ,8 36 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 3 1

60 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) H -0 8 U si ng P ub lic Tr an sp or ta tio n to R ed uc e th e E co no m ic , S oc ia l, an d H um an C os ts o f P er so na l Im m ob ilit y C ra in & A ss oc 2/ 12 /1 99 6 6/ 30 /1 99 9 $2 99 ,9 96 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 4 9; C as e St ud ie s P ub lis he d as W eb D oc um en t 7 H -0 9 E co no m ic Im pa ct A na ly si s of T ra ns it In ve st m en ts : G ui de bo ok fo r P ra ct iti on er s C am br id ge S ys te m at ic s 1/ 2/ 19 96 12 /1 /1 99 7 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 3 5 H -1 0 C os ts o f S pr aw l-- 20 00 R ut ge rs U C en te r f or U rb an P ol ic y R es ea rc h 4/ 1/ 19 96 4/ 30 /2 00 1 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - In te rim R ep or t P ub lis he d as R ep or t 3 9; Fi na l R ep or t P ub lis he d as R ep or t 7 4 H -1 1 A ss es sm en t o f t he E co no m ic Im pa ct s of R ur al P ub lic T ra ns po rta tio n E co so m et ric s 1/ 15 /1 99 6 10 /1 4/ 19 97 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 3 4 H -1 2 In te gr at ed U rb an M od el s fo r S im ul at io n of T ra ns it an d La nd -U se P ol ic ie s: G ui de lin es fo r Im pl em en ta tio n an d U se U o f T or on to 6/ 1/ 19 97 9/ 30 /1 99 8 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 4 8 an d W eb D oc um en t 9 H -1 3A C on se qu en ce s of th e In te rs ta te H ig hw ay S ys te m fo r T ra ns it P ar so ns , B rin ck er ho ff, Q ua de , & D ou gl as 5/ 31 /1 99 6 12 /3 1/ 19 97 $1 25 ,0 00 $1 25 ,0 00 C om pl et ed - In te rim R ep or t Pu bl is he d as R R D 2 1; F in al R ep or t P ub lis he d as R ep or t 42 H -1 3B Tr en ds in S in gl e- O cc up an t V eh ic le a nd V eh ic le M ile s of T ra ve l G ro w th in th e U .S . C ha rle s R iv er A ss oc 4/ 16 /1 99 6 10 /1 6/ 19 97 $1 25 ,0 00 $1 25 ,0 00 C om pl et ed - P ub lis he d as R R D 3 0 an d W eb D oc um en t 5 H -1 4 M ak in g Tr an si t W or k: In si gh t f ro m W es te rn E ur op e, C an ad a an d th e U ni te d S ta te s TR B S tu di es a nd In fo rm at io n Se rv ic es 3/ 10 /1 99 7 12 /3 0/ 20 00 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - P ub lis he d as TR B S pe ci al R ep or t 2 57 H -1 5 P ro je ct s to S up po rt "M ob ili ty fo r t he 2 1s t C en tu ry " N /A $1 50 ,0 00 C om pl et ed - W or ks ho p C on du ct ed A pr il 19 97

61 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) H -1 5A G ui de bo ok fo r D ev el op in g W el fa re -to -W or k Tr an sp or ta tio n S er vi ce s M ul tis ys te m s 5/ 11 /1 99 8 6/ 30 /2 00 0 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 6 4 an d W eb D oc um en t 1 6 H -1 6 A N at io na l T ra ns it In du st ry La bo r-M an ag em en t C oo pe ra tio n P ro gr am : N ew P ar ad ig m s fo r L ab or - M an ag em en t R el at io ns in th e Tr an si t I nd us try o f t he 21 st C en tu ry C or ne ll U ni ve rs ity 8/ 6/ 19 98 1/ 31 /2 00 2 $7 5, 00 0 $1 50 ,0 00 C om pl et ed - Th re e W or ks ho ps C on du ct ed H -1 7 N ew F or m s of La bo r/M an ag em en t C oo pe ra tio n: A S er ie s of M ee tin gs L ea di ng to a D em on st ra tio n of In no va tiv e W or ki ng A ss ig nm en ts $1 50 ,0 00 C an ce lle d H -1 9 H -1 9A E st im at in g th e B en ef its an d C os ts o f P ub lic T ra ns it P ro je ct s: A G ui de bo ok fo r P ra ct iti on er s P ar so ns , B rin ck er ho ff, Q ua de , & D ou gl as 3/ 23 /1 99 9 10 /3 1/ 20 01 $2 50 ,0 00 $2 00 ,0 00 $5 0, 00 0 C om pl et ed - P ub lis he d as R ep or t 7 8 H -2 0 U si ng G eo gr ap hi c In fo rm at io n Sy st em s (G IS ) fo r W el fa re to W or k Tr an sp or ta tio n P la nn in g an d S er vi ce D el iv er y M ul tis ys te m s 10 /1 9/ 19 98 2/ 15 /2 00 0 $1 24 ,9 70 $1 25 ,0 00 C om pl et ed - P ub lis he d as R ep or t 6 0 an d W eb D oc um en t 1 4 H -2 1 Tr av el M at te rs : M iti ga tin g C lim at e C ha ng e w ith S us ta in ab le S ur fa ce Tr an sp or ta tio n C en te r f or N ei gh bo rh oo d Te ch no lo gy 6/ 7/ 20 01 3/ 7/ 20 03 $1 74 ,9 53 $1 75 ,0 00 C om pl et ed - P ub lis he d as R ep or t 9 3 H -2 1A Tr av el M at te rs : M iti ga tin g C lim at e C ha ng e w ith S us ta in ab le S ur fa ce Tr an sp or ta tio n C en te r f or N ei gh bo rh oo d Te ch no lo gy 6/ 7/ 20 03 10 /1 /2 00 4 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - P ub lis he d as W eb D oc um en t 2 6 H -2 2A E va lu at io n of th e N at io na l Tr an si t D at ab as e FT A P ro je ct w ith K P M G P ea t M ar w ic k 2/ 1/ 20 00 5/ 31 /2 00 1 $9 00 ,0 00 C om pl et ed - FT A R ep or t Pr ep ar ed

62 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) H -2 2B E va lu at io n of th e N at io na l Tr an si t D at ab as e- TR B C om m itt ee TR B D iv is io n B 8/ 1/ 20 00 4/ 30 /2 00 1 $1 00 ,0 00 C om pl et ed - Le tte r R ep or ts Pr ep ar ed H -2 2C Im pl em en ta tio n of th e R ed es ig ne d N at io na l Tr an si t D at ab as e FT A Pr oj ec t $1 ,5 00 ,0 00 FT A P ro je ct - C om pl et ed H -2 3 A ss es sm en t o f t he B en ef its o f N ew T ra ns it In ve st m en ts v s. In ve st m en ts in E xi st in g In fra st ru ct ur e FT A Pr oj ec t $2 00 ,0 00 FT A P ro je ct - C om pl et ed H -2 4 P ub lic T ra ns it B oa rd G ov er na nc e G ui de bo ok S im on & S im on R es ea rc h an d A ss oc . 10 /1 1/ 20 00 7/ 15 /2 00 2 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 8 5 an d W eb D oc 2 1 H -2 4A P ub lic T ra ns po rta tio n B oa rd E ffe ct iv en es s: A S el f-A ss es sm en t H an db oo k A E C O M C on su lti ng Tr an sp or ta tio n G ro up 1/ 13 /2 00 3 6/ 13 /2 00 4 $1 75 ,0 00 $1 75 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 04 a nd W eb D oc um en t 2 4 H -2 5 S tra te gi es fo r I nc re as in g th e E ffe ct iv en es s of C om m ut er B en ef its P ro gr am s IC F C on su lti ng , I nc . 10 /1 3/ 20 00 11 /1 5/ 20 02 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 8 7 H -2 5A A na ly zi ng th e E ffe ct iv en es s of C om m ut er B en ef it P ro gr am s IC F C on su lti ng , I nc . 4/ 8/ 20 03 6/ 30 /2 00 5 $1 60 ,0 00 $1 60 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 07 a nd W eb -O nl y D oc um en t 2 7 H -2 6 E co no m ic B en ef its o f C oo rd in at in g H um an S er vi ce T ra ns po rta tio n an d Tr an si t S er vi ce s W es ta t 10 /1 5/ 20 00 4/ 15 /2 00 3 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 9 1 H -2 7 Tr an si t-O rie nt ed D ev el op m en t i n A m er ic a: E xp er ie nc es , C ha lle ng es , an d P ro sp ec ts U C - B er ke le y 9/ 1/ 20 01 1/ 30 /2 00 4 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 02 H -2 7A E ffe ct s of T O D o n H ou si ng , P ar ki ng a nd Tr av el P ar so ns B rin ck er ho ff Q ua de & D ou gl as 10 /1 /2 00 4 4/ 30 /2 00 8 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 28

63 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) H -2 8 U se o f A rc hi ve d A V L- A PC D at a to Im pr ov e Tr an si t P er fo rm an ce a nd M an ag em en t N or th ea st er n U ni ve rs ity 8/ 1/ 20 01 4/ 30 /2 00 6 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - In te rim R ep or t P ub lis he d as W eb D oc um en t 23 ; F in al R ep or t P ub lis he d as R ep or t 1 13 H -2 9 Fr om H an ds ha ke to C om pa ct : G ui da nc e to Fo st er C ol la bo ra tiv e, M ul tim od al D ec is io n M ak in g Tr an sM an ag em en t, In c. 8/ 1/ 20 01 10 /2 8/ 20 04 $3 50 ,0 00 $2 00 ,0 00 (T C R P) $1 50 ,0 00 (N C H R P) C om pl et ed - P ub lis he d as R ep or t 1 06 H -3 0 H -3 0A S tra te gi es to In cr ea se C oo rd in at io n of Tr an sp or ta tio n S er vi ce s fo r th e Tr an sp or ta tio n D is ad va nt ag ed Tr an S ys te m s 7/ 16 /2 00 2 10 /9 /2 00 4 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 05 H -3 1 U nd er st an di ng H ow In di vi du al s M ak e Tr av el an d Lo ca tio n D ec is io ns : Im pl ic at io ns fo r P ub lic Tr an sp or ta tio n Tr an S ys te m s 10 /2 2/ 20 03 8/ 31 /2 00 7 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 23 H -3 2 E le m en ts N ee de d to C re at e H ig h R id er sh ip Tr an si t S ys te m s Tr an S ys te m s 11 /4 /2 00 4 10 /3 0/ 20 06 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 11 H -3 3A S ta te a nd N at io na l T ra ns it In ve st m en t A na ly si s: Q ui ck -R es po ns e A na ly se s fo r S A FE TE A -L U C om m is si on C am br id ge S ys te m at ic s 2/ 21 /2 00 6 12 /3 0/ 20 06 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - R es ul ts to A P TA H -3 3B S ta te a nd N at io na l T ra ns it In ve st m en t A na ly si s: A dd iti on al A na ly se s fo r A A SH TO B ot to m L in e R ep or t a nd R el at ed A P TA R ep or ts C am br id ge S ys te m at ic s 10 /1 6/ 20 07 10 /1 5/ 20 08 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - R es ul ts to AA SH TO a nd A P TA H -3 4 Lo ca l a nd R eg io na l Fu nd in g M ec ha ni sm s fo r P ub lic T ra ns po rta tio n C am br id ge S ys te m at ic s 8/ 8/ 20 06 9/ 15 /2 00 8 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 29

64 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) H -3 5 Th e R ol e of T ra ns it in E m er ge nc y E va cu at io n N A S /T R B 11 /1 /2 00 6 7/ 31 /2 00 8 $6 5, 00 0 $6 5, 00 0 C om pl et ed - P ub lis he d as TR B S pe ci al R ep or t 2 94 H -3 6 R ei nv en tin g th e U rb an In te rs ta te : A N ew P ar ad ig m fo r M ul tim od al C or rid or s D ow lin g A ss oc ia te s 10 /2 6/ 20 07 11 /1 /2 01 0 $3 49 ,9 84 $4 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 45 H -3 7 C ha ra ct er is tic s of P re m iu m Tr an si t S er vi ce s th at A ffe ct C ho ic e of M od e R S G , I nc . 12 /2 8/ 20 07 12 /3 0/ 20 13 $7 74 ,9 45 $3 75 ,0 00 $4 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 66 H -3 8 D ev el op in g, E nh an ci ng an d S us ta in in g Tr ib al Tr an si t S er vi ce s: A G ui de bo ok LS C T ra ns po rta tio n C on su lta nt s, In c. 9/ 30 /2 00 8 12 /3 1/ 20 11 $3 99 ,3 66 $4 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 54 a nd W eb -O nl y D oc um en t 5 4 H -3 9 M et ho do lo gy fo r D et er m in in g th e E co no m ic D ev el op m en t I m pa ct s of Tr an si t P ro je ct s R ut ge rs U ni ve rs ity 11 /1 1/ 20 08 6/ 23 /2 01 2 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - P ub lis he d as W eb -O nl y D oc um en t 5 6 H -4 0 G ui de lin es fo r F er ry Tr an sp or ta tio n S er vi ce s A ru p 10 /3 0/ 20 08 11 /3 0/ 20 11 $1 99 ,2 86 $2 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 52 H -4 1 A ss es si ng a nd C om pa rin g E nv iro nm en ta l P er fo rm an ce o f M aj or Tr an si t P ro je ct s C am br id ge S ys te m at ic s, In c. 12 /2 4/ 20 09 3/ 1/ 20 12 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - P ub lis he d as R es ea rc h R es ul ts D ig es t 1 05 an d W eb -O nl y D oc um en t 5 5 H -4 2 M ak in g E ffe ct iv e Fi xe d - G ui de w ay T ra ns it In ve st m en ts : I nd ic at or s of S uc ce ss U ni ve rs ity o f C al ifo rn ia - B er ke le y 11 /1 9/ 20 10 1/ 15 /2 01 4 $5 00 ,0 00 $4 00 ,0 00 $1 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 67 H -4 3 Tr an sf or m in g P ub lic Tr an sp or ta tio n In st itu tio na l an d B us in es s M od el s H ig h S tre et C on su lti ng G ro up 10 /1 /2 01 0 10 /3 1/ 20 12 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 59 H -4 4 D ev el op in g P ar tn er sh ip s B et w ee n Tr an sp or ta tio n A ge nc ie s an d th e D is ab ili ty an d U nd er re pr es en te d C om m un iti es S im on & S im on R es ea rc h A ss oc ia te s 9/ 21 /2 01 0 9/ 30 /2 01 2 $7 4, 95 5 $7 5, 00 0 C om pl et ed - P ub lis he d as R es ea rc h R es ul ts D ig es t 1 07

65 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) H -4 5 Li va bl e Tr an si t C or rid or s: M et ho ds , M et ric s, a nd S tra te gi es C FA C on su lta nt s 1/ 20 /2 01 2 6/ 1/ 20 16 D . S ch w ag er $4 00 ,0 00 A . L ou i $4 00 ,0 00 C om pl et ed - P ub lis he d as TC R P R es ea rc h R ep or t 1 87 H -4 6 Q ua nt ify in g Tr an si t's Im pa ct o n G H G E m is si on s an d En er gy U se -T he L an d U se C om po ne nt IC F, In c. 10 /1 1/ 20 11 12 /1 /2 01 4 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 76 H -4 7 Li nk in g Tr an si t A ge nc ie s an d La nd U se D ec is io n- M ak in g: G ui de bo ok fo r Tr an si t A ge nc ie s P ar so ns B rin ck er ho ff 1/ 25 /2 01 2 10 /2 4/ 20 15 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - P ub lis he d as TC R P R ep or t 1 82 H -4 8 V al ue C ap tu re fo r Fi na nc in g Tr an si t C an ce lle d H -4 9 Im pr ov in g Tr an si t In te gr at io n A m on g M ul tip le Tr an si t P ro vi de rs N el so n/ N yg aa rd 1/ 2/ 20 13 10 /1 /2 01 4 $2 99 ,7 83 $3 00 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 73 , V ol um es I an d II H -5 0 Lo ca l E co no m ic D ev el op m en t M ea su re m en t T oo l f or Tr an si t E co no m ic R es ea rc h D ev el op m en t G ro up 2/ 11 /2 01 5 4/ 1/ 20 16 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - P ub lis he d as R ep or t 1 86 H -5 1 U nd er st an di ng C ha ng es in D em og ra ph ic s, P re fe re nc es a nd M ar ke ts fo r t he T ra ns it In du st ry R es ou rc e S ys te m s G ro up , I nc . 10 /2 3/ 20 15 2/ 28 /2 01 8 D . S ch w ag er $3 50 ,0 00 P . M az ur ek J. R ya n $3 50 ,0 00 R es ea rc h in P ro gr es s H -5 2 D ec is io n- M ak in g To ol bo x to P la n an d M an ag e P ar k- an d- R id e Fa ci lit ie s fo r P ub lic T ra ns po rta tio n Te xa s A& M E ng in ee rin g E xp er im en t S ta tio n 2/ 1/ 20 15 1/ 11 /2 01 7 D . S ch w ag er $3 00 ,0 00 K . C er ve nk a $3 00 ,0 00 C om pl et ed - P ub lis he d as TC R P R es ea rc h R ep or t 1 92 H -5 3 To ol s fo r a S us ta in ab le Tr an si t A ge nc y IC F, In c. 10 /2 3/ 20 15 3/ 30 /2 01 8 D . S ch w ag er $3 00 ,0 00 A Q ua gl ia ta $3 00 ,0 00 R es ea rc h in P ro gr es s H -5 4 G ui de to E qu ity A na ly si s in R eg io na l T ra ns po rta tio n P la nn in g P ro ce ss es IC F, C on su lti ng 12 /1 4/ 20 16 12 /1 3/ 20 18 G . C hi sh ol m $2 00 ,0 00 K . C er ve nk a $3 00 ,0 00 R es ea rc h in P ro gr es s

66 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) H -5 5 G ui de bo ok fo r I nt eg ra tin g Tr an sp or ta tio n an d H ea lth C ar e P ro vi de rs D . S ch w ag er D . N el so n J. L yn ch $2 00 ,0 00 In D ev el op m en t J : S PE C IA L PR O JE C TS J- 01 D is se m in at io n an d Im pl em en ta tio n of T C R P R es ea rc h Fi nd in gs A m er ic an P ub lic Tr an sp or ta tio n A ss oc 2/ 15 /1 99 3 D . S ch w ag er F. H al l $4 00 ,0 00 (9 2) $6 00 ,0 00 (9 4) $2 50 ,0 00 (9 5) $4 50 ,0 00 (9 6) $6 96 ,0 00 (9 7) $5 96 ,0 00 (9 8) $6 66 ,6 00 (9 9) $6 96 ,6 05 (0 0) $6 91 ,6 00 (0 1) $7 00 ,0 00 (0 2) $6 96 ,0 00 (0 3) $7 00 ,0 00 (0 4) $7 36 ,0 00 (0 5) $7 50 ,0 00 (0 6) $7 75 ,0 00 (0 7) $7 50 ,4 00 (0 8) $7 56 ,0 00 (0 9) $6 95 ,0 00 (1 0) $7 20 ,0 00 (1 1) $4 04 ,6 00 (1 2) $3 13 ,6 50 (1 3) $3 08 ,2 19 (1 4) $4 20 ,0 00 (1 5) $5 00 ,0 00 (1 6) $4 50 ,0 00 (1 7) an tic ip at ed C on tin ui ng P ro je ct J- 02 TC R P S tra te gi c P la nn in g P ro ce ss a nd S tra te gi c P la n V ar io us 10 /2 8/ 19 92 12 /3 1/ 19 96 $5 0, 00 0 $5 0, 00 0 C om pl et ed

67 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) J- 03 In te rn at io na l T ra ns it S tu di es P ro gr am V ar io us 2/ 1/ 19 94 G . C hi sh ol m F. H al l $2 50 ,0 00 (9 2) $2 50 ,0 00 (9 4) $2 50 ,0 00 (9 5) $3 25 ,0 00 (9 6) $3 25 ,0 00 (9 7) $2 00 ,0 00 (9 8) $4 50 ,0 00 (9 9) $3 25 ,0 00 (0 0) $3 25 ,0 00 (0 1) $3 25 ,0 00 (0 2) $3 25 ,0 00 (0 3) $3 25 ,0 00 (0 4) $3 25 ,0 00 (0 5) $3 25 ,0 00 (0 6) $4 50 ,0 00 (0 7) $4 25 ,0 00 (0 8) $5 00 ,0 00 (0 9) $5 00 ,0 00 (1 0) $5 00 ,0 00 (1 1) P ro je ct o n H ol d; P ub lic at io ns - R R D s 20 , 2 2, 27 , 3 1, 3 3, 3 6, 4 2, 4 7, 4 9, 53 , 5 4, 5 8, 6 2, 6 4, 6 6, 6 8, 70 , 7 1, 7 7, 8 1, 8 5, 8 7, 8 8, 89 , 9 2, 9 5, 9 6, 1 01 ,1 02 , a nd 10 3 J- 04 In no va tio ns D es er vi ng E xp lo ra to ry A na ly si s- -T he Tr an si t I D E A P ro gr am Tr an sp or ta tio n R es ea rc h B oa rd 12 /1 /1 99 2 V . Ba se m er a- Fi tz pa tri ck R . O ps te lte n $5 00 ,0 00 (9 2) $5 00 ,0 00 (9 4) $4 00 ,0 00 (9 5) $4 00 ,0 00 (9 6) $5 00 ,0 00 (9 7) $5 00 ,0 00 (9 9) $5 00 ,0 00 (0 0) $5 00 ,0 00 (0 1) $2 00 ,0 00 (0 2) $5 00 ,0 00 (0 3) $5 00 ,0 00 (0 4) $5 00 ,0 00 (0 5) $5 00 ,0 00 (0 6) $5 00 ,0 00 (0 7) $5 60 ,0 00 (0 8) $5 60 ,0 00 (0 9) $5 60 ,0 00 (1 0) $5 60 ,0 00 (1 1) $4 60 ,0 00 (1 2) $3 00 ,0 00 (1 3) $3 00 ,0 00 (1 4) $5 60 ,0 00 (1 5) $3 60 ,0 00 (1 6) $5 85 ,0 00 (1 7) an tic ip at ed C on tin ui ng P ro je ct ; S ee J -4 Ta bl e

68 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) J- 05 Le ga l A sp ec ts o f T ra ns it an d In te rm od al Tr an sp or ta tio n Pr og ra m s Tr an sp or ta tio n R es ea rc h B oa rd 3/ 1/ 19 93 G . C hi sh ol m B . G ra ve s $1 50 ,0 00 (9 2) $1 75 ,0 00 (9 3) $3 00 ,0 00 (9 5) $1 50 ,0 00 (9 6) $1 75 ,0 00 (9 7) $3 00 ,0 00 (9 9) $1 20 ,0 00 (0 0) $1 50 ,0 00 (0 1) $1 50 ,0 00 (0 2) $1 00 ,0 00 (0 3) $ 2 5, 00 0 (0 4) $1 50 ,0 00 (0 5) $2 50 ,0 00 (0 6) $2 50 ,0 00 (0 7) $2 50 ,0 00 (0 8) $2 50 ,0 00 (0 9) $2 50 ,0 00 (1 0) $3 00 ,0 00 (1 1) $2 00 ,0 00 (1 2) $ 5 0, 00 0 (1 3) $2 50 ,0 00 (1 4) $2 50 ,0 00 (1 5) $1 25 ,0 00 (1 6) $2 50 ,0 00 (1 7) C on tin ui ng P ro je ct ; S ee J -5 Ta bl e - P ub lis he d as R R D 5 0

69 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) J- 06 TC R P Q ui ck R es po ns e fo r S pe ci al N ee ds V ar io us 1/ 1/ 19 94 To b e de te rm in ed $1 00 ,0 00 (9 3) $ 5 0, 00 0 (9 4) $3 29 ,1 39 (9 5) $1 00 ,0 00 (9 6) $1 75 ,0 00 (9 7) $1 25 ,0 00 (9 8) $5 35 ,8 87 (9 9) $3 35 ,0 00 (0 0) $ 7 5, 00 0 (0 1) $2 00 ,0 00 (0 2) $1 50 ,0 00 (0 3) $5 00 ,0 00 (0 4) $1 50 ,0 00 (0 5) $3 00 ,0 00 (0 6) $1 50 ,0 00 (0 7) $ 7 5, 00 0 (0 8) $2 50 ,0 00 (0 9) $2 05 ,0 00 (1 0) $1 50 ,0 00 (1 1) $1 00 ,0 00 (1 3) $1 00 ,0 00 (1 5) $ 5 0, 00 0 (1 6) C on tin ui ng P ro je ct ; S ee J -6 Ta bl e

70 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) J- 07 S yn th es is o f I nf or m at io n R el at ed to T ra ns it Pr ac tic es Tr an sp or ta tio n R es ea rc h B oa rd 12 /1 /1 99 2 G . C hi sh ol m F. H al l $1 ,8 00 ,0 00 (9 2- 94 ) $3 75 ,0 00 (9 5) $3 75 ,0 00 (9 6) $4 00 ,0 00 (9 7) $2 00 ,0 00 (9 8) $4 00 ,0 00 (9 9) $4 00 ,0 00 (0 0) $4 00 ,0 00 (0 1) $3 75 ,0 00 (0 2) $4 00 ,0 00 (0 3) $5 00 ,0 00 (0 4) $6 00 ,0 00 (0 5) $6 00 ,0 00 (0 6) $6 00 ,0 00 (0 7) $6 00 ,0 00 (0 8) $7 00 ,0 00 (0 9) $7 55 ,0 00 (1 0) $7 50 ,0 00 (1 1) $6 50 ,0 00 (1 2) $3 50 ,0 00 (1 3) $5 50 ,0 00 (1 4) $6 50 ,0 00 (1 5) $7 50 ,0 00 (1 6) $8 57 ,0 00 (1 7) C on tin ui ng P ro je ct ; S ee J -7 Ta bl e; P ub lic at io ns - R R D s 2, 8 , 3 7, 4 8, 6 3, 6 7, 7 3, 8 0, 86 , 9 1, 9 8, 1 04 , 1 08 , 1 10 , 11 1, a nd 1 13 J- 08 N ew P ar ad ig m s fo r P ub lic Tr an si t $1 71 ,0 00 (9 6) C om pl et ed J- 08 A N ew P ar ad ig m s fo r P ub lic Tr an sp or ta tio n: A S co pi ng S tu dy E no T ra ns po rta tio n Fo un da tio n 2/ 25 /1 99 7 2/ 24 /1 99 8 $1 54 ,0 00 $1 54 ,0 00 (9 6) C om pl et ed - Fu tu re S ea rc h H el d M ay 1 99 7; P ub lis he d as R R D 2 4 J- 08 B /C N ew P ar ad ig m s fo r L oc al P ub lic T ra ns po rta tio n O rg an iz at io ns C am br id ge S ys te m at ic s 5/ 11 /1 99 8 9/ 30 /2 00 3 $3 23 ,2 83 $3 25 ,0 00 (9 7) $4 00 ,0 00 (9 9) C om pl et ed - Ta sk 1 P ub lis he d as R ep or t 5 3; Ta sk 5 P ub lis he d as R ep or t 58 ; P ha se II I I ss ue P ap er Pu bl is he d as R R D 5 5; F in al R ep or t P ub lis he d as R ep or t 97

71 N o. Ti tle C on tra ct or C on tra ct A m ou nt E nd D at e S ta rt D at e FT A Li ai so n( s) S ta ff O ffi ce r A llo ca tio n S ta tu s TA B LE 5 (c on tin ue d) J- 09 e- Tr an si t: E le ct ro ni c B us in es s S tra te gi es fo r P ub lic T ra ns po rta tio n $4 00 ,0 00 (0 0) $1 75 ,0 00 (0 2) $2 10 ,0 00 (0 3) $1 00 ,0 00 (0 4) $1 00 ,0 00 (0 5) $1 00 ,0 00 (0 6) C om pl et ed - S ee J -9 T ab le J- 10 P ub lic T ra ns po rta tio n S ec ur ity R es ea rc h $2 ,0 00 ,0 00 (0 2) $ 4 00 ,0 00 (0 3) $ 3 50 ,0 00 (0 4) C om pl et ed - S ee J -1 0 Ta bl e J- 11 Q ui ck R es po ns e R es ea rc h on L on g- Te rm S tra te gi c Is su es D . S ch w ag er $3 00 ,0 00 (0 7) $3 00 ,0 00 (0 8) $3 00 ,0 00 (0 9) $ 7 5, 00 0 (1 0) $1 98 ,0 00 (1 1) $ 2 8, 00 0 (1 3) $1 50 ,0 00 (1 4) $2 25 ,0 00 (1 5) $1 00 ,0 00 (1 6) $3 00 ,0 00 (1 7) C on tin ui ng P ro je ct - S ee J - 11 T ab le

Next: Summary of Project D-7 Status »
TCRP Annual Report of Progress 2017 Get This Book
×
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s Transit Cooperative Research Program (TCRP) has released its annual report, which provides background and an overview of the program, status of each of TCRP’s projects, and a summary of some of the program's accomplishments for the year.

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!