Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
  6 Tas Man This chapt Managem appropria sustainab The resea web page need for s with impl outline an implemen focuses o implemen with infor been gath 6.1 An The resea context, c included i an effort t 6.1.1 A This sectio acknowle wish to be 6.1.2 Ex This sectio DOT exec recomme 6.1.3 In This sectio structure 6.1.4 S This sectio them, em implemen 6.1.4.1 This sectio portion of k 6 â Dev agemen er describes ent of Sustai te way to org le DOT EIP de rch team stru  formats. The ustainable D ementing the d provides th tation examp n ânext steps tation examp mation from ered through notated O rch team dev oncepts, and n the guide a o relate tech cknowledgm n will provid dgments will  named.  ecutive Sum n will provid utive and sen ndations. troduction n will descri of the docum ustainable D n will presen erging needs ting these ne Introduction n will provid  the guide/w elop An t of DOT the work per nable Inform anize the ou velopment a ctured the a  team separa OT EIPs, the c m. The secon e reader wit les (includin â by addressi les from sta  the first thre out the first utline eloped the a  challenges t re examples nology recom ents  e a list of all include the p mary e a concise s ior managem be the purpo ent and its c OT EIPs t the rationa  associated w eds. e a general in ebsite. notated O EIPs Gu formed in Ta ation Portals tputs of the p nd managem nnotated out ted the guid urrent meth d section is h sustainable g diagrams), ng the challe te DOTs. To d e interim rep five tasks.  nnotated out hat were iden of early adop mendations parties that c anel membe ummary of th ent level wh se of the doc ontent. le for sustain ith technolo troduction t utline fo ide sk 6 of NCHR .â  The purpo revious task ent guide an line so that t ance into thr ods used to d inspired by a  DOT EIP req and migratio nges identifie evelop the fu orts, as well line as show tified at the tion of some  to existing D ontributed to rs, as well as e guideâs co o need to qu ument by int able DOT EIP gical advance o the inform  r Develo P 20â103, âG se of Task 6 s and develo d the associa he guide cou ee sections. T esign them, typical syste uirements, o n recommen d in the first ll guide, the as any other n on the follo workshop an  of the prese OT practices  the content  interviewees ntent and wi ickly obtain a roducing the s, the curren ment, and th ation that wi pment a uidance for D was to determ p an annotat ted website. ld be used in he first sect and the iden m requireme perating env dations. The  section and  outline was f relevant info wing pages t d in previous nted concep .  presented in  and survey ll target an au n understan  research and t methods us e identified ll be provided nd evelopment ine the mos ed outline fo    both report ion describes tified challen nt specificati ironments, third section providing ea urther popu rmation that o explain the  tasks. Also, ts and practic  the guide. T respondents dience at th ding of the gu  describing t ed to design challenges w  throughout 213  and t r a and  the ges on  rly lated  had  es in he that e ideâs he  ith  thisÂ
  6.1.4.2 This sectio functions 6.1.4.2.1 In the gui EIP busine 2 intervie 6.1.4.2.2 In the gui provided 6.1.4.3 This sectio grow. 6.1.4.4 This sectio sustainab will be pro page. 6.1.4.5 This sectio rational fo 6.1.4.6 This sectio technolog 6.1.4.6.1 This sectio well as th 6.1.4.6.2 This sectio concepts 6.1.4.6.3 This sectio DOT proc 6.1.4.6.4 This sectio DOT and c DOT EIPs n will define that EIPs imp DOT Intervi dance docum ss and use ca w process wi DOT Portal dance docum in one of the Context n will presen Industry Prac n will presen le EIPs. In the vided in one Microservices n will introd r using it wh Challenges n will descri ies and conc IT Concepts n will introd e associated Workforce n will introd by the curren Procureme n will introd urement prac Legal n will introd urrent state  DOT EIPs an lement.  ew ent, this sect ses. It will be ll be provided Analysis ent, this sect appendices. t the current tices t the current  guidance do  of the appen Architecture uce the micro en implemen be the curren epts.  uce the orga benefits and uce the chall t DOT workf nt uce the chall tices. uce the chall legal restrict d the concep ion will refer  provided in  on this page ion will refer In the websit  and future c  practices an cument, this dices. In the  services arc ting sustaina t challenges nizational cha perceived ris enges related orce. enges related enges related ions. t of sustainab  to the Task 2  one of the a .  to where the e version, th ontext in wh d technologi  section will r  website vers hitecture, its ble EIPs. that DOTs ar llenges relat ks.  to the imple  to the acqu  to the imple  ility.  It will a  interview p ppendices. In  Task 2 DOT e full results ich DOT EIPs es used in th efer to wher ion, the surv advantages a e experiencin ed to commu mentation o isition of new mentation o lso describe rocess used t  the website  portal analys will be provid  are expected e IT industry e the Task 3 ey will be pro nd disadvan g when impl nicating new f new IT tech  IT technolog f new IT tech the various o develop DO  version, the is results wil ed on this pa  to operate a to implemen industry surv vided on thi tages and the ementing ne  IT concepts nologies and ies by the cu nologies by t 214 T Task l be ge. nd t ey s  w IT , as  rrent heÂ
  6.1.4.7 This sectio be retaine 6.1.5 S This sectio architectu provide su migration 6.1.5.1 This sectio sustainab 6.1.5.2 This sectio architectu 6.1.5.3 This sectio requireme 6.1.5.4 This sectio sustainab 6.1.5.5 This sectio sustainab 6.1.5.6 This sectio technolog all the dia provided 6.1.5.7 This sectio traditiona 6.1.6 O This sectio identified 6.1.6.1 This sectio next steps Key Points for n will summ d. ustainable D n will presen re. This secti stainable DO  recommend Introduction n will provid le DOT EIP de Terminology n will introd re. Sustainable E n will list the nts and reso Operating En n will presen le DOT EIP. Technology R n will descri le DOT EIP. Implementati n will presen ies and their grams will be on this page. Migration Str n will discus l architecture vercoming n will focus  in the first se Introduction n will provid  portion of t a Sustainabl  arize the con OT EIP Des t how sustai on will be str T EIP require ations. e a general in sign portion uce the read IP Requireme  various des urce require vironment t a descriptio ecommendat be the identif on Examples t examples o  associated d  provided in  ategy s the recomm  to microser Challenges on describing ction and pr e a general in he guide/web e DOT EIP tent of the S ign nable DOT EI uctured follo ments, oper troduction t of the guide/ er to the vari nts ign requirem ments of a su n of the env ions ied technolo f DOT EIP co iagrams. In th one of the ap ended meth vices architec  the relevant ovide examp troduction t site. ustainable DO Ps could be i wing a typica ating environ o the inform website. ous terms an ents, perform stainable DO ironment ne gy recomme mponents im e guidance d pendices. In ods and app ture.  actions that les of early im o the inform  T EIPs sectio mplemented l system eng ments, imple ation that wi d concept of ance require T EIP. eded for the ndations for plementatio ocument, th  the website roaches whe  can be taken plementatio ation that wi n using a list  using a micro ineering spec mentation e ll be provided the microser ments, exter implementat each of the c ns using the is section wi version, the n migrating E  to address t n in some St ll be provided  of key point services ification and xamples, and  throughout vices nal interface ion of a omponent of recommende ll refer to wh diagrams will IPs from a he challenge ate DOTs.  throughout 215 s to  will   the   a d ere  be s  theÂ
  6.1.6.2 This sectio advantage 6.1.6.3 This sectio 6.1.6.4 This sectio 6.1.6.5 This sectio 6.1.6.6 In the gui concepts 6.1.6.7 This sectio workshop this sectio 6.1.6.7.1 The Virgin EIP compo available demand a 6.1.6.7.2 The Texas ATMS solu request w 6.1.6.7.3 The Utah process o industry. 6.1.6.7.4 The Utah following 6.1.6.7.5 The Texas to procure the Penns IT Concepts n will presen s in a nonâte Workforce n will presen Procurement n will presen Legal n will presen Presentation dance docum and workforc Case Studies n will provid . These exam n will provid Virginia DO ia DOTâs rea nent that w âelastic and a fter snowfall Texas DOT  DOT is curre tion from M aiver from th Utah DOT D DOT, like mo f implementi Utah DOT S DOT has rece the adoption Texas DOT  DOT has cre  the cloudâb ylvania Turn t the various chnical fashi t workforce t procureme t legal pract ent, this sect e, procurem e case studie ples will like e full case stu T Realâtime S lâtime snow p ould benefit f daptableâ in s. Statewide Tra ntly hosting idwestern So e Texas Dep ata Strategy st state DOTs ng a new app torage Web S ntly adopted  of such serv IT Procureme ated a dedica ased system. pike Commiss  IT concepts on intended t practices rele nt practices ices relevant ion will refer ent, and lega s for each of ly have been dy descriptio now Plow Loc low tracking rom being m frastructure t ffic Analysis its STARS II en ftware Syste artment of In , has been fa roach inspire ervices Impl  the use of c ices by the st nt Example ted IT procu  The system ion to pursu relevant to s o be underst vant to the i relevant to th to the implem  to a master l recommend  the best pra discussed thr ns. ation Service  web applicat igrated to a s o reduce cos and Reportin tirely on the m. In order to formation Re cing challeng d by the curr ementation loudâbased se ate of Utah. rement proce is available to e IT acquisitio  ustainable DO ood by a var mplementati e implement entation of Power Point ed practices ctices that we oughout oth  (www.vdotp ion provides ustainable D ts and suppo g System (STA  AWS cloud u  utilize this s sources to st es managing ent practices rvices for m ss at the sta  other state n. T EIPs and t iety of audie on of sustain ation of sust  sustainable D presentation . re discovere er sections o lows.org)  a case study OT EIP archit rt the interm RS II) sing a third olution, the ore data in t  its data and  used in the ost of its data te level, whic agencies and heir associate nces. able DOT EIP ainable DOT OT EIPs.  presenting t d during the f the guide, b  example of a ecture to uti ittent and su party cloudâb Texas DOT ha he cloud. is currently i healthcare  storage h made it ea  has been us 216 d s. EIPs. he IT ut  DOT lize rging ased d to n the sier ed byÂ
  6.1.7 D This sectio content w recomme 6.1.8 R 6.1.8.1 This sectio research p 6.1.8.2 This sectio each. 6.1.9 A In the gui containing full survey 6.1.10 C This sectio additiona 6.2 We Figure 86 Sustainab ownloads n will includ ill include po ndations. eferences References n will includ roject. Glossary n will includ ppendices  dance docum  content wil . ontact Infor n will includ l information bsite Site shows how t le DOT EIP De e contain link wer point pr e references e a list of the ent, this sect l be better se mation  e the contact  about the re Map he various co velopment a s to content esentation, s to all docum  technical ter ion will inclu rved in an ap  information search. mponent of nd Managem that the read ustainable DO ents, books, a ms used in th de an append pendix rathe  of the releva the outline co ent Guide W  er will be ab T EIP requir rticles or we e guidance a ix for each o r than in mai nt people av uld be imple ebsite. le to downlo ements, and bpages used nd a brief ex f the aforem n text of the ailable to dis mented as a ad and use. T technology  during this planation of entioned sec guide, such a cuss and prov  sitemap for 217 he tions s the ide theÂ
  Fig  ure 86: Sitemap for susta  inable DOT EIP developme  nt and management guide website. 218 Â