Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
SECTION 6 17 STD/PS Considerations 6.1 Consequences of Having an STD/PS Below are the consequences of a secondary system in a CBTC project: 6.1.1 Investment Effort A secondary system requires a significant investment effort to deploy. In comparison to deploying CBTC without STD/PS, a CBTC project with STD/PS requires a higher capital cost and a longer schedule due to: ⢠More effort to design the STD/PS and the added complexity of integrating the STD/PS with CBTC. ⢠More equipment to purchase and install. Installation is usually the major cost and could be a major impact on the schedule for signaling upgrade projects. ⢠More tests in the field, with more issues to fix, in particular at the interface between STD/PS and CBTC. ⢠More agency oversight with both CBTC and STD/PS skills with a wider range of expertise. 6.1.2 Maintenance Effort The inclusion of STD/PS adds to the overall life cycle cost. Additionally, maintenance required for the STD/PS throughout the operating life of the new CBTC project is an added expense. Note that one of the arguments in favor of deploying CBTC technology is that CBTC requires less equipment on the track and therefore less maintenance actions by roadway workers. This is also seen as a method to improve safety for agency personnel. Having an STD/PS which needs maintenance actions on the track lower this CBTC benefit.  6.1.3 Impact on CBTC Operation Availability Transit agencies have increased focus on reliability and system availability during acquisitions and project development. The goal is to achieve highâreliability performance to minimize the impact of equipment failures on revenue service. An increase in devices may include components on or near the track, which are subject to adverse weather conditions or damage by other maintenance activities. Increasing equipment count and complexity inherently implies more probable failures and adverse effects on the availability of the signaling system. The impact on availability can be assessed analytically using reliability and availability methods. The negative impact on the CBTC operation availability appears to be one of the most important considerations by transit agencies for limiting the level of STD/PS. 6.1.4 Example of Technical Challenges for Integrating STD/PS in CBTC Project This section presents some of the reasons why integration of an STD/PS in a CBTC project is complex. One of the primary reasons for implementing CBTC technology is to improve system capacity by enabling more trains to operate on the same infrastructure. Technically, conventional signaling systems could be designed to meet performance close to CBTC performance, but it would require a large amount of wayside equipment to have similar capabilities. Conventional signaling systems are based on fixed blocks and assume that the train is running at its maximum authorized speed when calculating the safe distance between two trains. Block layout and signal spacing are based on the worstâcase conditions and therefore the system is generally not optimal for operation under normal conditions. On the other hand, CBTC, using the exact location andÂ
SECTION 6 â STD/PS CONSIDERATIONS 18 instantaneous speed of the trains, continuously calculates the varying safe separation which results in minimum possible distance between two trains at all times. The conventional signaling system may be capable of enforcing signals at stop, via devices mounted on the roadbed. The train stop arm activating a tripcock which opens the emergency brake lines on the train is one such example. To have the CBTC system provide its optimal train separation, allowing trains to be closer to each other than the conventional system, the conventional train separation enforcement system must not affect CBTC trains. The transit agency may also want to avoid the issue of having CBTC trains passing nonâproceed signals, even if those signals are dedicated for the nonâCBTC trains. In rare cases, transit agencies have decided that CBTC trains should respect the conventional signaling system with nonâoptimal train separation. There are several methods to avoid the conventional signaling system impeding on CBTC performance:  ⢠Disable the enforcement system and have a separation signal which is clearly only for the nonâCBTC trains, such as a particular color. ⢠Have the CBTC system override the enforcement system and override the signals so that signals present an aspect different for the CBTC trains than for the nonâCBTC trains. For example, a solid green indicates STD/PS proceed and a flashing green indicates CBTC proceed. This approach increases not only the complexity of the CBTC itself but also the complexity of the secondary system. 6.1.5 Evaluating the Adverse Consequences of STD/PS One undisputed benefit of having an STD/PS is that it allows operators better management of trains during CBTC failures. More sophisticated STD/PS will in turn have the most impact on the baseline CBTC system, such as: ⢠High capital investment with deployment of the new/replacement signaling system ⢠Higher maintenance efforts and life cycle cost ⢠Impact on overall system availability. Having an STD/PS allows continuing train operation without CBTC or in restricted CBTC modes and therefore it could be said to increase the complete signaling system availability. However, having an STD/PS whose failures affect CBTC operation decreases the probability of continuing to run in CBTC mode. As part of the assessment process, agencies should also consider not having an STD/PS, described in the next section, and rely on: ⢠Operating procedures in case of CBTC failure ⢠Equipping work trains with CBTC Depending on the CBTC system, operating procedures may also be needed to manage some STD/PS failures. However, failures of STD/PS are local to a specific geographical area around the failed equipment, whereas management of failures of the CBTC system implies using operating procedures to safely move one or more trains over a large portion of the territory.  Table 4 provides an example of an evaluation of the impacts of an STD/PS. The impacts are similar whether an STD/PS is track circuit or axle counter based. For each type, the STD/PS category is evaluated using zero percent (0%) where there is no STD/PS and one hundred percent (100%) where a complete conventional signaling system capable of peak service operates. Note that due to the need for integration between STD/PS and CBTC, the effort of a complete conventional signaling system as a secondary system to CBTC is higher than only having a complete conventional signaling system alone. Transit agencies considering a CBTC project may apply a similar evaluation approach based on its experience. Points noted in Table 4 are illustrative and might vary for each transit agency.Â
SECTION 6 â STD/PS CONSIDERATIONS 19 Table 4: Examples of STD/PS Drawbacks (percentages are illustrative and will vary depending on system characteristics) Type Category Subâcategory Investment effort (%) Maintenance effort (%) Impact on CBTC operation availability (%) Avg (%) Systems with STD/PS 1.A Secondary System capable of revenue service 1.A.1 Secondary System capable of peak revenue service 100 100 100 100 1.A.2 Secondary System capable of offâpeak revenue service 80 80 80 80 1.B Secondary System designed to handle a single nonâCBTC train 1.B.1 Capable of one train per interstation 40 30 40 36 1.B.2 Capable of one train in between two interlockings 1.B.2.1 With secondary detection method everywhere 40 30 30 33 1.B.2.2 With secondary detection method only at interlocking 20 10 10 13 1.B.3 Without territory specific headway performance 30 30 30 30 Systems without STD/PS 2 0 0 0 0 The following chart helps visualize the consequence of implementing an STD/PS for each CBTC category:Â
SECTION 6 â STD/PS CONSIDERATIONS 20 Table 5: Level of Consequences of STD/PS â Average effort of deployment and impact on maintenance and operation (percentages are illustrative and will vary depending on system characteristics) This graph shows the comparative level of effort required for each type of secondary system.  1. The difference between 1.B.2.2 with detection equipment only at interlocking and the group of 1.B.1, 1.B.2.1, and 1.B.3 with detection equipment everywhere is relatively important due to the difference in the amount of the equipment used for detection. The benefit of having detection equipment everywhere is that nonâequipped trains can be tracked with accuracy while in 1.B.2.2, nonâequipped trains can only be tracked with blocks as large as the distance between interlockings. 2. The difference in the level of efforts between 1.B.2.1/1.B.3 and 1.B.1 is low. This explains why there are few projects in the 1.B.2.1/1.B.3 Categories. For the similar amount of effort, the secondary system can manage a nonâequipped train per interstation with minimal operating procedure. 3. The gap between 1.B.1 and 1.A.2 is significant and explains why it is important to only implement a system capable of peak or offâpeak revenue service when absolutely needed. In summary, the proposed generic example may explain why most new CBTC projects around the world, greenfield and brownfield, are selecting Category 1.B.1. For transit agencies unwilling to operate without a secondary system, this option allows managing a single train with CBTC failure and work trains with a relatively low investment on the secondary system.  Though the drawbacks of STD/PS are important during the selection process, they are not always directly influencing the choice of a CBTC system. One of the reasons may be the difficulty in quantifying the negative impacts. 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 1.A.1 â System capable of peak service 1.A.2 â System capable of off peak service 1.B.1 â System capable of one train per interstation 1.B.2.1 â System capable of one train in between two interlockings â System with detection devices everywhere 1.B.2.2 âSystem capable of one train in between two interlockings â System with detection devices only at interlocking 1.B.3 â Without territory specific headway performance 2 â No Secondary System Average Negative Effects (Effort of deployment â Impact on operation and maintenance)
SECTION 6 â STD/PS CONSIDERATIONS  21 6.2 Consequences of Having No or Minimal STD/PS Not having an STD/PS could have the following impacts during initial deployment phases and during revenue service.  6.2.1 Relying Heavily on Operating Procedures Handling of nonâCBTC equipped trains, and trains with CBTC failure have been very challenging for systems without STD/PS in terms of the impact on system availability and operations. For equipment failures, as an example, location tracking of trains with CBTC failure is not possible, which makes automatic protection unlikely. In such cases, one must manually ensure: ⢠Protection of the nonâequipped train or train with CBTC failure from the other CBTC trains. ⢠Protection of CBTC trains from the nonâequipped train or train with CBTC failure. These protections are accomplished at the control center by the ATS system operator. The protections rely on the ATS operator and train driver managing operating procedures.  Note that even in projects with STD/PS, handling trains with CBTC failure always requires relying partially on the secondary system and partially on operating procedures. The level of operating procedure is very minimal in project Categories 1.A and increases in projects in 1.B.1, 1.B.2, and 1.B.3.  Finally, operating procedures to handle trains not detected by the STD/PS should always be in place. Nonâshunting vehicles, which may include hiârail vehicles, for example, are managed entirely by operating procedures, whether an STD/PS is present or not. 6.2.2 Equipping Work Trains Another consequence of not having STD/PS at all (Category 2) or having projects with low STD/PS level (Category 1.B.2) is that the need for equipping work trains may be more important. Section 8 â Work Trains presents the different methods of equipping work trains.Â