National Academies Press: OpenBook

Staffing for Alternative Contracting Methods (2018)

Chapter: Acronyms and Abbreviations

« Previous: References
Page 75
Suggested Citation:"Acronyms and Abbreviations." National Academies of Sciences, Engineering, and Medicine. 2018. Staffing for Alternative Contracting Methods. Washington, DC: The National Academies Press. doi: 10.17226/25211.
×
Page 75

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

75 AASHTO American Association of State Highway and Transportation Officials ACM Alternative Contracting Method Caltrans California Department of Transportation CDOT Colorado Department of Transportation CM/GC Construction Manager/General Contractor D-B Design–Build D-B-B Design-Bid-Build DOT Department of Transportation FDOT Florida Department of Transportation FHWA Federal Highway Administration GDOT Georgia Department of Transportation MnDOT Minnesota Department of Transportation MoDOT Missouri Department of Transportation NCDOT North Carolina Department of Transportation ODOT Ohio Department of Transportation PPP or P3 Public–Private Partnerships VDOT Virginia Department of Transportation Acronyms and Abbreviations

Next: Appendix A - National Survey Questionnaire »
Staffing for Alternative Contracting Methods Get This Book
×
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB's National Cooperative Highway Research Program (NCHRP) Synthesis 518: Staffing for Alternative Contracting Methods documents current practices in state departments of transportation (DOTs) staffing and organizational structure for alternative contracting methods (ACMs). ACMs include design–build, construction manager/general contractor, public–private partnerships, and other innovative contracting techniques. ACMs shift more responsibility to industry for delivering and managing construction projects than traditional design-bid-build projects. As a result, DOTs must make decisions regarding the appropriate levels and mix of staffing for their ACM projects.

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!