National Academies Press: OpenBook

NCHRP 2018 Annual Report (2018)

Chapter: Status (as of 12/31/2018) of Projects Active or Pending During 2018

« Previous: Publications of the National Cooperative Highway Research Program 2018
Page 22
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 22
Page 23
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 23
Page 24
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 24
Page 25
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 25
Page 26
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 26
Page 27
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 27
Page 28
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 28
Page 29
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 29
Page 30
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 30
Page 31
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 31
Page 32
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 32
Page 33
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 33
Page 34
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 34
Page 35
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 35
Page 36
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 36
Page 37
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 37
Page 38
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 38
Page 39
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 39
Page 40
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 40
Page 41
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 41
Page 42
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 42
Page 43
Suggested Citation:"Status (as of 12/31/2018) of Projects Active or Pending During 2018." National Academies of Sciences, Engineering, and Medicine. 2018. NCHRP 2018 Annual Report. Washington, DC: The National Academies Press. doi: 10.17226/25346.
×
Page 43

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

22 Nat i on al Coo perat ive Highway Research Program Project TABLE 2 No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * STATUS (AS OF 12/31/2018) OF PROJECTS ACTIVE OR PENDING DURING 2018 AREA ONE : PAVEMENTS 01-52 A Mechanistic-Empirical Model for Top-Down Cracking of Asphalt Pavement Layers Texas A&M Transportation Institute 499,356 3/4/2013 3/30/2018 Completed---Agency report to be available as NCHRP Web-Only Document 257 01-53 Proposed Enhancements to Pavement ME Design: Improved Consideration of the Influence of Subgrade and Unbound Layers on Pavement Performance Texas A&M Transportation Institute 400,000 1/1/2014 12/31/2018 Completed---Publication decision pending 01-54 Guidelines for Limiting Damage to Flexible and Composite Pavements Due to the Presence of Water Applied Pavement Technology 349,881 8/1/2014 12/31/2018 Completed---Publication decision pending 01-57A Developing Standard Definitions for Comparable Pavement Cracking Data Oklahoma State University 249,592 10/13/2017 7/13/2019 Research in progress 01-58 Quantifying the Effects of Implements of Husbandry on Pavements University of Pittsburgh 400,000 9/1/2017 2/28/2020 Research in progress 01-59 Proposed Enhancements to Pavement ME Design: Improved Consideration of the Influence of Subgrade Soils Susceptible to Shrink/Swell and/or Frost Heave on Pavement Performance Arizona State University 500,000 8/15/2018 5/14/2021 Research in progress 01-60 Measuring the Characteristics of Pavement Surface Images and Developing Standard Practices for Calibration, Certification, and Verification of Imaging Systems Georgia Tech Research Corporation 593,633 9/10/2018 12/9/2021 Research in progress 01-61 Evaluation of Bonded Concrete Overlays on Asphalt Pavements Nichols Consulting Engineers 570,000 2/26/2018 2/26/2020 Research in progress AREA TWO : ADMINISTRATION--ECONOMICS 02-25 ----- 700,000 In development 02-26 ----- 500,000 In development 02-27 Attracting, Retaining, and Developing the Transportation Workforce: Design, Construction and Maintenances Implementation of Programmatic Life-Cycle Cost Analysis in a Transportation Asset Management Framework Making Targets Matter: Managing Performance to Enhance Decision- Making ----- 650,000 In development AREA THREE : TRAFFIC--OPERATIONS AND CONTROL 03-62 Guidelines for Accessible Pedestrian Signals (APS) University of North Carolina - Chapel Hill 1,070,000 10/4/2001 1/31/2018 Completed---Interim materials summarized in NCHRP Research Results Digest 278. Final publication decision pending.

23 2018 Annual Repor t Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 03-78C Kittelson & Associates 250,000 1/4/2017 1/3/2019 03-99A Kittelson & Associates 25,960 11/13/2017 2/13/2018 03-111 KLS Engineering LLC 749,961 6/24/2014 7/24/2019 03-113 North Carolina State University 1,099,875 6/13/2014 9/12/2018 03-117 Texas A&M Transportation Institute 298,697 5/11/2015 1/15/2018 03-118 Vanasse Hangen Brustlin, Inc. 600,000 8/13/2015 8/12/2019 Research in progress--- Contractor's final report under review Completed---Published by TRB as "Access Management Manual and Application Guidelines--Linked" Research in progress---Interim report pending Research in progress Completed---Published as NCHRP Research Report 881 Research in progress 03-119 George Mason University 599,134 9/28/2015 11/30/2019 Research in progress 03-120 Kittelson & Associates 800,000 8/11/2015 7/31/2018 03-121 Cambridge Systematics 549,301 7/5/2016 9/1/2019 03-122 Kittelson & Associates 600,000 4/14/2016 7/13/2018 03-123 Texas A&M Transportation Institute 350,000 7/1/2016 6/30/2019 03-124 Battelle Memorial Institute 749,939 11/3/2016 5/2/2019 03-125 University of Wisconsin - Madison 300,000 9/21/2016 9/20/2019 03-126 ----- 500,000 03-127 Southwest Research Institute 750,000 8/16/2017 8/15/2019 03-128 Applied Engineering Management Corporation 359,942 6/20/2018 9/19/2019 03-129 Training and Technology Transfer for Accessibility Guidelines for Roundabouts and Channelized Turn Lanes Linking the TRB Access Management Manual and the Access Management Application Guidelines Effectiveness of Work Zone Transportation Management Plan Strategies Guidance for Traffic Signals at Diverging Diamond Interchanges and Adjacent Intersections Traffic Control Devices and Measures for Deterring Wrong-Way Movements Decision-Making Guide for Traffic Signal Phasing Application of MASH Test Criteria to Breakaway Sign and Luminaire Supports and Crashworthy Work Zone Traffic Control Devices Assessing Interactions Between Access Management Treatments and Multimodal Users Incorporating Freight, Transit, and Incident Response Stakeholders into Integrated Corridor Management (ICM): Processes and Strategies for Implementation Performance-Based Management of Traffic Signals Proposed Practices for the Application of Dynamic Lane Use Control Principles and Guidance for Presenting Drivers with Dynamic Information on Active Traffic Management Evaluation of Change and Clearance Intervals Prior to the Flashing Yellow Arrow Permissive Left-Turn Indication Operational Standards for Highway Infrastructure Cybersecurity of Traffic Management Systems Business Intelligence Techniques for Transportation Agency Decision Making Essential Communications: A Guide to Land Mobile Radio (LMR) Commdex Consulting LLC 536,433 8/1/2018 7/31/2020 Completed---Published as NCHRP Research Report 900 Completed---To be published as NCHRP Research Report 899 Completed---Publication decision pending Research in progress Research in progress Research in progress In development Research in progress Research in progress Research in progress---Interim report pending

24 Nat i on al Coo perat ive Highway Research Program Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 03-130 Kittelson & Associates 750,000 6/1/2018 11/30/2020 Research in progress 03-131 Kapsch TrafficCom USA Inc. 499,306 5/7/2018 11/7/2019 Research in progress 03-132 Texas A&M Transportation Institute 300,000 5/14/2018 11/13/2019 Research in progress 03-133 Kittelson & Associates 500,000 4/25/2018 4/24/2020 Research in progress 03-134 ----- 500,000 In development 03-135 ----- 600,000 In development 03-136 ----- 300,000 In development 03-137 Guide for Roundabouts Guidance for Planning and Implementing Multimodal, Integrated Corridor Management Guidance for Safe and Effective Temporary Traffic Control for Mobile Operations on Two-Lane Two-Way Roadways Signal Timing Strategies for Non- Motorized Users Determination of Encroachment Conditions in Work Zones Wrong-Way Driving Prevention Solutions, Policy, and Guidance Evaluating the Performance of Right- Turn-On-Red Operation at Signalized Intersections (with single and dual right-turn lanes) Algorithms to Convert Basic Safety Messages into Traffic Measures ----- 400,000 In development AREA FOUR : MATERIALS AND CONSTRUCTION--GENERAL MATERIALS 04-40 Reliability-Based Geotechnical Resistance Factors for Axially-Loaded Micropiles University of Missouri 249,998 9/1/2017 8/31/2019 Research in progress 04-41 Deterioration Rates and Unit Costs for Geotechnical Assets ----- 400,000 Terminated AREA FIVE : TRAFFIC--ILLUMINATION AND VISIBILITY 05-21 Safety and Performance Criteria for Retroreflective Pavement Markers Texas A&M Transportation Institute 675,000 9/1/2015 6/30/2018 05-22 Guidelines for Solid-State Roadway Lighting WSP USA Inc. 399,993 6/1/2017 3/31/2019 05-23 Effects of LED Roadway Lighting on Driver Sleep Health and Alertness Virginia Polytechnic Institute 399,775 7/1/2018 6/30/2020 Completed---To be published as an NCHRP Research Report Research in progress Research in progress 05-24 Guidelines for Vehicle and Equipment Color, Marking, and Lighting Texas A&M Transportation Institute 600,000 6/1/2018 11/30/2020 Research in progress AREA SIX : MAINTENANCE--SNOW AND ICE CONTROL 06-18 Guide for Snow and Ice Control Operations ----- 300,000 In development AREA SEVEN : TRAFFIC--TRAFFIC PLANNING 07-22 Planning and Preliminary Engineering Applications Guide to the Highway Capacity Manual Kittelson & Associates 566,000 6/4/2013 1/30/2018 Completed---Published as NCHRP Report 825

25 2018 Annual Repor t Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 07-23 Texas A&M Transportation Institute 900,000 6/20/2013 2/28/2019 Research in progress 07-24 WSP USA Inc. 299,920 1/26/2017 12/31/2018 Completed---To be published as an NCHRP Research Report 07-25 Kittelson & Associates 400,000 4/12/2017 2/12/2019 Research in progress 07-26 ----- 500,000 In development 07-27 ----- 400,000 In development 07-28 Access Management in the Vicinity of Interchanges Estimating the Value of Truck Travel- Time Reliability Guide for Pedestrian and Bicycle Safety at Alternative Intersections and Interchanges (AII) Highway Capacity Manual Methodologies for Analyzing Freeway Merging and Diverging Bottlenecks Considering Different Geometric Characteristics and Mitigation Strategies An Update of the Green Book Design Vehicles and Minimum Turning Paths Assessing the Impacts of Turn Lanes in Different Contexts and Modal Considerations to Increase Safety Performance ----- 650,000 In development AREA EIGHT : TRANSPORTATION PLANNING--FORECASTING 08-36/Task 116 Development of Transportation Asset Management Plan Templates RAND Corporation 234,718 6/12/2013 7/15/2018 Completed---Final report sent to AASHTO 08-36/Task 125A Transportation Asset Management Knowledge Portal (Continuation) RAND Corporation 70,000 1/10/2017 4/15/2018 Completed---Final report sent to AASHTO 08-36/Task 127 Employment Data for Planning: Do You Know What You’re Getting, Who’s Your Supplier, and How Good are the Goods? Cambridge Systematics 99,975 6/18/2015 2/28/2018 Completed---Final report sent to AASHTO 08-36/Task 135A Addressing Margins of Error in Small Areas of Data Delivered through the American FactFinder or the Census Transportation Planning Products Program RAND Corporation 29,956 8/23/2017 8/22/2018 Completed---Final report sent to AASHTO 08-36/Task 137 Assessing the Utility and Costs of Statewide Travel Demand Models RAND Corporation 124,697 6/21/2016 4/30/2018 Completed---Final report sent to AASHTO 08-36/Task 139 Planning Research Digest RAND Corporation 124,401 6/21/2016 6/29/2018 Completed---Final report sent to AASHTO 08-36/Task 140 Assessing Actual Transportation Impacts of the 2005 BRAC Decisions WSP USA Inc. 124,995 7/20/2016 4/30/2018 Completed---Final report sent to AASHTO 08-36/Task 141 Evaluation of Walk and Bicycle Demand Modeling Practice RAND Corporation 99,996 5/30/2017 1/31/2019 Research in progress 08-36/Task 142 Advancing Sustainability through Multi-Agency Collaborations RAND Corporation 145,000 6/5/2017 5/30/2019 Research in progress 08-36/Task 143 Evolving Transportation Planning Research Needs for the 21st Century WSP USA Inc. 124,980 6/5/2017 1/15/2019 Research in progress 08-36/Task 144 Transportation Asset Management and Effective Organizational Models for Program Implementation Cambridge Systematics 125,000 6/5/2017 11/30/2018 Completed---Final report sent to AASHTO

26 Nat i on al Coo perat ive Highway Research Program Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 08-36/Task 145 Scenario Planning Lite Cambridge Systematics 75,000 4/6/2018 1/5/2019 Research in progress 08-36/Task 146 Economic Resilience and Long-Term Highway/Transportation Infrastructure Investment RAND Corporation 150,000 5/3/2018 5/9/2019 Research in progress 08-36/Task 147 Strategic Mobility Research: WSP USA Inc. 150,000 5/3/2018 5/2/2019 08-101 Cambridge Systematics 500,000 6/22/2015 6/30/2018 08-102 Georgia Tech Research Corporation 350,000 6/24/2015 8/30/2019 08-103 Spy Pond Partners 398,300 6/1/2016 9/22/2018 08-104 University of Colorado - Boulder 500,000 9/16/2016 3/31/2019 Research in progress Completed---Publication decision pending Research in progress---Interim report pending Completed---To be published as an NCHRP Research Report Research in progress--- Contractor's draft report under review 08-105 PRR Inc. 350,000 6/6/2016 11/20/2018 Completed---Publication 08-106 Texas A&M Transportation Institute 375,000 5/25/2016 5/25/2018 08-107 AECOM Consulting Transportation Group 249,997 12/15/2016 6/30/2019 08-108 Spy Pond Partners 299,956 3/9/2017 3/29/2019 08-109 Spy Pond Partners 100,000 3/10/2017 7/9/2018 08-109(01) Spy Pond Partners 700,000 6/4/2018 1/3/2020 08-110 University of Kentucky Research Foundation 349,932 2/14/2017 2/28/2019 08-111 Rensselaer Polytechnic Institute 500,000 3/20/2017 3/20/2019 08-112 Gransberg & Associates Inc. 450,000 6/1/2017 3/1/2019 08-113 Enhancing Mobility, Stimulating Economic Activity, Saving Lives Enhanced Truck Data Collection and Analysis for Emissions Modeling Bicyclist Facility Preferences and Effects on Increasing Bicycle Trips Implementing NCHRP Report 806: Guide to Cross-Asset Resource Allocation and the Impact on Transportation System Performance A Guidebook for Post-Award Contract Administration for Highway Projects Delivered Using Alternative Contracting Methods Measuring the Effectiveness of Public Involvement in Transportation Planning and Project Delivery Metropolitan Freight Transportation: Implementing Effective Strategies A Guidebook for Emergency Contracting Procedures for Administration of a Regional Emergency Developing National Performance Management Data Strategies to Address Data Gaps, Standards, and Quality Updating the AASHTO Transportation Asset Management Guide—A Focus on Implementation Updating the AASHTO Transportation Asset Management Guide—A Focus on Implementation, Phase 2 Traffic Forecasting Accuracy Assessment Research Effective Decision-Making Methods for Freight-Efficient Land Use Guidebook for Implementing Alternative Technical Concepts into All Types of Highway Project Delivery Methods Integrating Effective Transportation Performance, Risk, and Asset Management Practices CH2M Hill 520,617 3/15/2018 9/14/2020 decision pending Completed---Published as NCHRP Research Report 897 Research in progress--- Interim report under review Research in progress Completed---Work continuing under NCHRP Project 08-109(01) Research in progress Research in progress Research in progress Research in progress--Interim report under review Research in progress

27 2018 Annual Repor t Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 08-114 Systematic Approach for Determining Construction Contract Time: A Guidebook Iowa State University 0 3/20/2018 11/19/2019 See NCHRP Project 08-114A 08-114A Systematic Approach for Determining Construction Contract Time: A Guidebook Texas A&M University 500,000 7/27/2018 3/27/2020 Research in progress 08-115 Guidebook for Data and Information Systems for TAM Spy Pond Partners 400,000 8/1/2018 10/31/2019 Research in progress 08-116 Framework for Managing Data from Emerging Transportation Technologies to Support Decision-Making Applied Engineering Management Corporation 399,973 5/8/2018 11/7/2019 Research in progress 08-117 Impact of Transformational Technologies on Land Use and Transportation Kittelson & Associates 200,000 5/1/2018 7/31/2019 Research in progress 08-118 Risk Assessment Techniques for Transportation Asset Management ----- 600,000 In development 08-119 Developing Data Standards and Guidance for Transportation Planning and Traffic Operations - Phase 1 ----- 1,100,000 In development 08-120 Initiating the Systems Engineering Process for Rural Connected Vehicle Corridors ----- 350,000 In development 08-121 Operationalizing Accessibility Metrics to Support Transportation Planning and Performance Management ----- 500,000 In development 08-122 Metropolitan Planning Organizations: Transportation Partnerships for the 21st Century ----- 400,000 In development 08-123 Census Transportation Data Use and Application Field Guide ----- 375,000 In development 08-124 Quantifying the Impacts of Corridor Management ----- 450,000 In development 08-125 A Comprehensive Study of Future Competencies for Transportation Planners ----- 300,000 In development AREA NINE : MATERIALS AND CONSTRUCTION--BITUMINOUS MATERIALS 09-52A Short-Term Laboratory Conditioning of Asphalt Mixtures: Field Verification Texas A&M Transportation Institute 162,000 10/18/2016 12/31/2018 Completed---Publication decision pending 09-54 Long-Term Aging of Asphalt Mixtures for Performance Testing and Prediction North Carolina State University 950,000 5/21/2013 4/30/2019 Research in progress 09-55 Recycled Asphalt Shingles in Asphalt Mixtures with Warm Mix Asphalt Technologies Auburn University 600,000 6/10/2013 2/28/2018 Completed---Published as NCHRP Research Report 890 09-56A Identifying Influences on and Minimizing the Variability of Ignition Furnace Correction Factors - Phase II Auburn University 250,000 5/12/2017 3/31/2019 Research in progress--- Contractor's draft report pending

28 Nat i on al Coo perat ive Highway Research Program Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 09-57A Texas A&M Transportation Institute 1,000,000 6/15/2018 10/14/2020 Research in progress---Interim report under review 09-58 Texas A&M Transportation Institute 1,500,000 5/2/2014 3/31/2019 Research in progress--- Contractor's draft report under review 09-59 Advanced Asphalt Technologies, LLC 1,000,000 4/20/2015 2/28/2019 Research in progress--- Contractor's draft final report under review 09-60 Western Research Institute 1,000,000 7/6/2016 6/30/2019 Research in progress 09-61 Advanced Asphalt Technologies, LLC 749,976 3/2/2017 9/1/2019 Research in progress 09-62 Virginia Department of Transportation 999,751 6/1/2017 6/1/2020 Research in progress 09-63 Ruggedness of Laboratory Tests to Assess Cracking Resistance of Asphalt Mixtures The Effects of Recycling Agents on Asphalt Mixtures with High RAS and RAP Binder Ratios Relating Asphalt Binder Fatigue Properties to Asphalt Mixture Fatigue Performance Addressing Impacts of Changes in Asphalt Binder Formulation and Manufacture on Pavement Performance through Changes in Asphalt Binder Specifications Short- and Long-Term Binder Aging Methods to Accurately Reflect Aging in Asphalt Mixtures Rapid Tests and Specifications for Construction of Asphalt-Treated Cold Recycled Pavements Development of a National Performance-Related Specification for Emulsified Asphalt Binder ----- 500,000 In development AREA TEN : MATERIALS AND CONSTRUCTION--SPECIFICATIONS, PROCEDURES, AND PRACTICES 10-91A Sustainable Highway Construction Practices University of Washington 300,000 10/10/2016 12/31/2018 Completed---Publication decision pending 10-93 Measuring, Characterizing, and Reporting Pavement Roughness of Low-Speed and Urban Roads University of Michigan 450,000 10/1/2013 8/31/2018 Completed---Publication decision pending 10-94 Mitigation of Weldment Cracking of Highway Steel Structures due to the Galvanizing Process University of Kansas 499,975 7/1/2014 5/31/2019 Research in progress 10-95A Toughness Requirements for Heat- Affected Zones of Welded Structural Steels for Highway Bridges University of Kansas 425,000 9/19/2016 12/31/2019 Research in progress 10-97 Detection and Remediation of Soluble Salt Contamination Prior to Coating Steel Highway Structures Elzly Technology Corporation 500,000 9/15/2015 11/30/2018 Completed---Publication decision pending 10-98 Protocols for Network-Level Macrotexture Measurement Virginia Polytechnic Institute 500,000 9/6/2016 9/5/2019 Research in progress 10-99 Guidebook for Implementing Constructability Across the Entire Project Development Process: NEPA to Final Design University of Florida 450,000 5/24/2018 5/23/2020 Research in progress 10-100 Procedures and Guidelines for Validating Contractor Test Data University of Nevada - Reno 300,000 8/1/2017 7/31/2019 Research in progress

29 2018 Annual Repor t Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 10-101 Improving Mid-Term, Intermediate, and Long-Range Cost Forecasting: Guidance for State Departments of Transportation Auburn University 250,000 5/1/2018 4/30/2020 Research in progress---Interim report pending 10-102 A Guidebook for Risk-Based Construction Inspection ----- 600,000 In development 10-103 Benchmarking Accelerated Laboratory Tests for ASR to Field Performance: Consideration of Cement and Alkali Contents and Influence of SCMs ----- 650,000 In development 10-104 Evaluating Use of Unconventional Fly Ash Sources in Highway Concrete ----- 600,000 In development AREA ELEVEN : ADMINISTRATION--LAW 11-08 Assessing Practices for Right-of-Way Acquisition and Reimbursement in Utility Relocations ----- 450,000 In development AREA TWELVE : DESIGN--BRIDGES 12-90 Guidelines for Shielding Bridge Piers Roadsafe LLC 450,000 11/20/2012 4/16/2018 12-94 LRFD Minimum Flexural Reinforcement Requirements Iowa State University 550,000 9/30/2013 9/30/2018 Completed---Published as NCHRP Research Report 892 Completed---To be published as an NCHRP Research Report 12-95A Proposed AASHTO Guidelines for Adjacent Precast Concrete Box Beam Bridge Systems University of Cincinnati 399,516 7/17/2018 10/16/2021 Research in progress 12-96 Simplified Full-Depth Precast Concrete Deck Panel Systems George Washington University 399,931 7/1/2013 6/30/2018 12-97 Guide Specification for the Design of Concrete Bridge Beams Prestressed with CFRP Systems University of Houston 500,000 8/1/2013 6/29/2018 Completed---Published as NCHRP Research Report 895 Completed---To be published as an NCHRP Research Report 12-104 Guidelines to Improve the Quality of Element-Level Bridge Inspection Data University of Missouri 347,961 8/11/2015 10/31/2018 Completed---To be published as 12-105 Proposed AASHTO Seismic Specifications for ABC Column Connections University of Nevada - Reno 450,000 9/1/2015 7/31/2019 Research in progress 12-106 Proposed Guidelines for Performance- Based Seismic Bridge Design Modjeski & Masters 429,920 9/23/2016 3/22/2019 Research in progress 12-108 Development of Guidelines for Uniform Service Life Design for Bridges Modjeski & Masters 279,846 9/1/2016 2/28/2019 Research in progress 12-109 Use of 0.7-in. Diameter Strands in Precast Pretensioned Girders University of Cincinnati 550,000 11/16/2016 5/15/2020 Research in progress 12-110 Proposed New AASHTO Load Rating Provisions for Implements of Husbandry E&T Consulting Engineers 550,000 10/21/2016 10/20/2019 Research in progress an NCHRP Web-Only Document

30 Nat i on al Coo perat ive Highway Research Program Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 12-111 University of Connecticut 400,000 4/3/2017 7/2/2019 Research in progress 12-112 Modjeski & Masters 449,927 7/28/2017 9/27/2020 Research in progress 12-113 University of Texas - Austin 589,670 6/1/2017 9/30/2020 Research in progress 12-115 Modjeski & Masters 469,895 8/14/2018 4/13/2021 Research in progress 12-116 ----- 500,000 In development 12-117 ----- 500,000 In development 12-118 Evaluating the Effectiveness of Vibration-Mitigation Devices for Structural Supports of Signs, Luminaires, and Traffic Signals Update of the AASHTO LRFD Movable Highway Bridge Design Specifications Proposed Modification to AASHTO Cross-Frame Analysis and Design Guidelines for Risk-Based Inspection and Strength Evaluation of Suspension Bridge Main Cable Systems Design Specifications for the Static and Seismic Design of Piles for Downdrag Effective Use of Duplex Coating Systems to Improve Steel Bridge Structure Durability Design and Construction Specifications for Bonded and Unbonded Post-Tensioned Concrete Bridge Elements ----- 800,000 In development AREA THIRTEEN : MAINTENANCE--EQUIPMENT 13-05 Washington State University 399,998 6/1/2015 12/31/2018 Completed---Publication decision pending 13-06 Guide for Utilization Measurement and Management of Fleet Equipment Guide for the Formulation of Long- Range Plans for Replacement Needs and Budget of Highway Operations Equipment State University of New York 399,998 11/12/2018 11/11/2020 Research in progress 13-07 Guide to Calculating Ownership and Operating Costs of Department of Transportation Vehicle and Equipment Fleet Cadmus Group, LLC 300,000 4/1/2018 8/31/2019 Research in progress 13-08 Guideline for Decision Making for Repair vs. Replacement of Highway Maintenance Equipment ----- 350,000 In development AREA FOURTEEN : MAINTENANCE--MAINTENANCE OF WAY AND STRUCTURES 14-26(01) Culvert and Storm Drain Inspection Manual Simpson Gumpertz & Heger, Inc. 17,300 8/6/2018 12/5/2018 14-27A A Guide for the Preservation of Highway Tunnel Systems Gannett Fleming, Inc. 75,000 3/28/2018 3/27/2019 14-30 Spot Painting to Extend Highway Bridge Coating Life University of Kentucky Research Foundation 349,965 9/3/2013 1/29/2018 14-34 Guide for Performance Measures in Snow and Ice Control Operations ICF Incorporated 299,956 4/20/2015 1/31/2018 Completed---Contractor's report available on project web page Research in progress Completed---Agency report available as NCHRP Web-Only Document 251 Completed---To be published as NCHRP Research Report 889

31 2018 Annual Repor t Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 14-35 Acceptance Criteria of Complete Joint Penetration Steel Bridge Welds Evaluated Using Enhanced Ultrasonic Methods Purdue University 538,965 4/24/2015 10/31/2018 Completed---To be published 14-36 Proposed AASHTO Guide for Bridge Preservation Actions University of Colorado - Boulder 609,887 11/13/2015 4/30/2019 14-37 Guide Specifications for the Construction of Chip Seals and Microsurfacing Shuler Consultants LLC 175,000 8/15/2016 7/13/2018 14-38 Guide for Timing of Asphalt-Surfaced Pavement Preservation AMEC Foster Wheeler Environ & Infrastructure Inc. 299,694 8/1/2016 8/31/2018 14-39 Using Vegetated Compost Blankets to Achieve Highway Runoff Volume and Pollutant Reduction University of Maryland 499,999 4/27/2017 4/26/2021 14-40 Comparison of Cost, Safety, and Environmental Benefits of Routine Mowing and Managed Succession of Roadside Vegetation Texas A&M Transportation Institute 300,000 9/5/2017 9/5/2019 14-41 Permanent Vegetation Control Treatments for Roadsides Texas A&M Transportation Institute 200,000 5/23/2018 5/22/2020 14-42 Determining State DOT Maintenance Program Implications of Connected and Automated Vehicles ----- 300,000 as an NCHRP Research Report Research in progress Completed---Contractor's report available on project web page Completed---Contractor's report available on project web page Research in progress---Interim report pending Research in progress Research in progress---Interim report pending In development AREA FIFTEEN : DESIGN--GENERAL DESIGN 15-50(01) Implementation Assessment of 3R Design Guidelines MRIGlobal 97,963 7/2/2018 1/1/2020 Research in progress 15-52 Developing a Context-Sensitive Functional Classification System for More Flexibility in Geometric Design University of Kentucky Research Foundation 300,001 1/15/2015 1/31/2018 Completed---Published as NCHRP Research Report 855 15-53 Roadside Design for Conflicts in Proximity to Bridge Ends and Intersecting Roadways KLS Engineering LLC 744,767 8/25/2014 2/29/2020 Research in progress 15-54 Proposed Modifications to AASHTO Culvert Load Rating Specifications Michael Baker, Jr., Inc. 541,524 7/7/2015 3/31/2019 Research in progress 15-55 Guidance to Predict and Mitigate Dynamic Hydroplaning on Roadways Virginia Polytechnic Institute 499,992 6/17/2015 4/30/2019 Research in progress 15-56 Guidelines for Selecting Ramp Design Speeds MRIGlobal 400,000 11/10/2015 8/31/2019 Research in progress 15-57 Highway Capacity Manual Methodologies for Corridors Involving Freeways and Surface Streets University of Florida 799,999 8/18/2016 2/17/2019 Research in progress 15-59 Horizontal Sightline Offset Design Criteria, Exceptions, and Mitigation Strategies MRIGlobal 400,000 8/10/2015 8/31/2018 Completed---To be published as an NCHRP Research Report 15-60 Proposed Update of the AASHTO Guide for the Development of Bicycle Facilities Toole Design Group 400,000 6/1/2015 12/31/2018 Completed---Submitted to AASHTO for balloting

32 Nat i on al Coo perat ive Highway Research Program Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 15-61 Applying Climate Change Information to Hydrologic and Hydraulic Design of Transportation Infrastructure Kilgore Consulting and Management 750,000 9/20/2016 12/31/2018 Completed---Publication decision pending 15-62 Design and Access Management Guidelines for Truck Routes MRIGlobal 500,000 7/5/2016 7/31/2019 Research in progress 15-63 Guidance to Improve Pedestrian and Bicycle Safety at Intersections University of North Carolina - Chapel Hill 500,000 7/19/2016 4/30/2019 Research in progress 15-64 Guidelines for the Design of Unsignalized Median Openings in Close Proximity to Signalized Intersections Texas A&M Transportation Institute 325,000 8/22/2016 3/31/2019 Research in progress 15-65 Development of Safety Performance- Based Guidelines for the Roadside Design Guide (RDG) Roadsafe LLC 300,000 9/1/2017 9/1/2019 Research in progress 15-66 Arterial Weaving on Conventional and Alternative Intersections ----- 750,000 In development 15-67 Wind Drag Coefficients for Highway Signs and Support Structures University of Iowa 300,000 In development 15-68 Effective Low-Noise Rumble Strips Illingworth & Rodkin, Inc. 699,828 7/25/2018 1/24/2021 Research in progress AREA SIXTEEN : DESIGN--ROADSIDE DEVELOPMENT 16-05 Guidelines for Cost-Effective Safety Treatments of Roadside Ditches Texas A&M Research Foundation 400,000 5/14/2010 2/28/2019 Research in progress--- Contractor's draft final report pending AREA SEVENTEEN : TRAFFIC--SAFETY 17-11(02) Development of Clear Recovery Area Guidelines Texas A&M University 270,000 9/7/2008 10/31/2019 Research in progress--- Contractor's draft final report pending 17-43 Long-Term Roadside Crash Data Collection Program Virginia Polytechnic Institute 1,000,000 4/27/2010 12/31/2020 Research in progress--- Contractor's draft final report pending 17-50 Lead States Initiative for Implementing the Highway Safety Manual CH2M Hill 299,000 1/11/2011 12/31/2018 Completed---See NCHRP Project 17-83 for follow-on activity 17-54 Consideration of Roadside Features in the Highway Safety Manual Roadsafe LLC 1,310,000 4/4/2011 12/31/2018 Completed---Publication decision pending 17-55 Guidelines for Slope Traversability Texas A&M Research Foundation 500,000 5/2/2012 11/15/2018 Completed---Publication decision pending 17-62 Improved Prediction Models for Crash Types and Crash Severities University of Connecticut 800,000 8/1/2013 9/30/2018 Completed---See NCHRP Project 17-71 for follow-on activity 17-64 Guidance for the Implementation of the Toward Zero Deaths National Strategy on Highway Safety University of Minnesota 496,810 3/4/2016 3/31/2020 Research in progress

33 2018 Annual Repor t Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 17-65 Improved Analysis of Two-Lane Highway Capacity and Operational Performance University of Florida 530,949 9/22/2014 3/5/2018 Completed---Agency report available as NCHRP Web- Only Document 255 17-66 Guidance for Selection of Appropriate Countermeasures for Opposite Direction Crashes Texas A&M Transportation Institute 350,000 8/27/2014 4/30/2019 Research in progress--- Contractor's final report pending 17-68 Intersection Crash Prediction Methods for the Highway Safety Manual MRIGlobal 750,000 9/1/2014 10/31/2019 Research in progress 17-70 Development of Roundabout Crash Prediction Models and Methods Kittelson & Associates 710,000 7/14/2014 2/28/2018 Completed---Published as NCHRP Research Report 888 17-71 Proposed AASHTO Highway Safety Manual, Second Edition Kittelson & Associates 1,200,000 10/12/2015 4/1/2020 Research in progress 17-72 Update of Crash Modification Factors for the Highway Safety Manual University of North Carolina - Chapel Hill 645,000 8/31/2015 1/31/2019 Research in progress 17-73 Conducting Systemic Pedestrian Safety Analyses University of North Carolina - Chapel Hill 300,000 7/28/2015 6/20/2018 Completed---Published as NCHRP Research Report 893 17-74 Developing Crash Modification Factors for Corridor Access Management Vanasse Hangen Brustlin, Inc. 450,000 10/24/2016 4/24/2019 Research in progress 17-75 Leveraging Big Data to Improve Traffic Incident Management Applied Engineering Management Corporation 275,000 8/15/2016 10/31/2018 Completed---To be published as an NCHRP Research Report 17-76 Guidance for the Setting of Speed Limits Texas A&M Transportation Institute 500,000 10/7/2016 4/7/2019 Research in progress 17-77 Guide for Quantitative Approaches to Systemic Safety Analysis MRIGlobal 300,000 8/5/2016 2/28/2019 Research in progress 17-78 Understanding and Communicating Reliability of Crash Prediction Models University of North Carolina - Chapel Hill 300,000 9/20/2016 3/19/2019 Research in progress 17-79 Safety Effects of Raising Speed Limits to 75 mph and Higher Texas A&M Transportation Institute 500,000 9/19/2016 9/18/2019 Research in progress 17-80 Expansion of Human Factors Guidelines for Road Systems, Second Edition Battelle Memorial Institute 499,914 11/9/2016 8/9/2019 Research in progress 17-81 Proposed Macro-Level Safety Planning Analysis Chapter for the Highway Safety Manual Vanasse Hangen Brustlin, Inc. 400,000 10/26/2017 7/26/2020 Research in progress 17-82 Proposed Guidance for Fixed Objects in the Roadside Design Guide MRIGlobal 500,000 12/12/2017 12/12/2020 Research in progress 17-83 Briefings and Training Materials for Implementation of the Highway Safety Manual, Second Edition University of North Carolina - Chapel Hill 500,000 12/12/2017 12/12/2020 Research in progress 17-84 Pedestrian and Bicycle Safety Performance Functions for the Highway Safety Manual MRIGlobal 500,000 3/27/2017 3/26/2019 Research in progress 17-85 Development and Application of Crash Severity Models for the Highway Safety Manual University of Connecticut 600,000 11/15/2018 2/15/2022 Research in progress

34 Nat i on al Coo perat ive Highway Research Program Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 17-86 Vanasse Hangen Brustlin, Inc. 599,567 10/22/2018 1/22/2022 Research in progress 17-87 Kittelson & Associates 550,000 4/20/2018 4/20/2020 Research in progress 17-88 Virginia Polytechnic Institute 675,000 6/19/2018 6/18/2022 Research in progress 17-89 Kittelson & Associates 400,000 6/15/2018 6/14/2020 Research in progress 17-89A Vanasse Hangen Brustlin, Inc. 299,998 7/10/2018 7/9/2020 Research in progress 17-90 ----- 400,000 In development 17-91 ----- 450,000 In development 17-92 ----- 500,000 In development 17-93 ----- 500,000 In development 17-94 Estimating Effectiveness of Safety Treatments in the Absence of Crash Data Enhancing Pedestrian Volume Estimation and Developing HCM Pedestrian Methodologies for Safe and Sustainable Communities Roadside Encroachment Database Development and Analysis Safety Performance of Part-Time Shoulder Use on Freeways HOV/HOT Freeway Crash Prediction Method for the Highway Safety Manual Validation of Roadside Crash Injury Metrics in Real World Crashes (Correlation of Actual Injury Outcomes to Those Predicted During Crash Testing) Assessing the Impacts of Connected, Automated, and Autonomous Vehicles on the Future of Transportation Safety Developing Safety Performance Functions for Rural Two-Lane Highways that Incorporate Speed Measures Updating Safety Performance Functions for Data-Driven Safety Analysis Tactile Walking Surface Indicators to Aid Wayfinding for Visually Impaired Travelers in Multimodal Travel ----- 384,000 Contract pending AREA EIGHTEEN : MATERIALS AND CONSTRUCTION--CONCRETE MATERIALS 18-17 Entrained Air Void System for Durable Highway Concrete Iowa State University 599,986 11/2/2015 5/31/2019 Research in progress 18-18 Design and Construction of Deck Bulb Tee Girder Bridges with UHPC Ohio University 478,125 7/3/2017 10/2/2020 Research in progress 18-19 Rating Concrete Water Permeability Based on Resistivity Measurements ----- 600,000 In development AREA NINETEEN : ADMINISTRATION--FINANCE 19-12 Development of Financial Plans and Performance Measures for Transportation Asset Management Spy Pond Partners 350,000 5/11/2016 5/10/2018 Completed---Publication decision pending 19-14 Right-Sizing Transportation Investments--Methods for Planning and Programming Economic Development Research Group, Inc. 499,994 2/3/2017 2/2/2019 Research in progress

35 2018 Annual Repor t Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 19-15 Guidebook for Effective Policies and Practices for Managing Surface Transportation Debt WSP USA Inc. 300,000 6/25/2018 12/24/2019 Research in progress 19-16 Managing the Effects of Uncertain Federal Funding ----- 400,000 In development AREA TWENTY : SPECIAL PROJECTS 20-24(89)C Transportation Asset Management, Inclusive Wealth, and Ecosystem Services ----- 389,250 Funds reallocated 20-24(95) Ensuring Essential Capability for the Future Transportation Agency Spy Pond Partners 200,000 10/7/2016 8/7/2018 Completed---Work continuing under NCHRP Project 20- 24(95)A 20-24(95)A Ensuring Essential Capability for the Future Transportation Agency (Phases 2 and 3) Spy Pond Partners 375,000 9/19/2018 12/18/2019 Research in progress 20-24(110) Development of Resources to Support State DOT Communications on Safety Cambridge Systematics 129,713 1/27/2017 10/26/2018 Completed---Contractor's final report sent to AASHTO and available on project web page 20-24(111) State DOT CEO Leadership Forum on "Connected & Autonomous Vehicles and Transportation Infrastructure Readiness" in conjunction with 2017 ITSWC, Montreal, Canada CAVita LLC 173,500 1/26/2017 1/25/2018 Completed---Contractor's final report sent to AASHTO and available on project web page 20-24(112) Connected Road Classification System (CRCS) Development Texas A&M Transportation Institute 180,000 7/28/2017 1/31/2019 Research in progress 20-24(113) CEO Peer Exchange 2017 WSP USA Inc. 249,978 2/23/2017 9/22/2018 Completed---Contractor's final report sent to AASHTO and available on project web page 20-24(116) Guidance on Roles and Responsibilities in Operation of Automated Vehicles ----- 230,000 In development 20-24(118) AASHTO reorganization strategic planning ICF Incorporated 500,000 7/28/2017 3/27/2019 Research in progress 20-24(119) Strategic Research in Support of the Connected and Automated Vehicle Executive Leadership Team ----- 150,000 In development 20-24(120) Guide to Communicating Transportation System Revenue Needs ----- 300,000 In development 20-24(121) Road Usage Charge: Applying Lessons Learned in New Zealand to the United States Cambridge Systematics 70,000 5/1/2018 2/28/2019 Research in progress 20-24(123) Roadmap for Supporting Specialty Personnel Recruitment, Development, and Retention in the DOT Workforce ----- 50,000 In development 20-24(124) Performance Management Peer Exchange Cambridge Systematics 125,000 8/15/2018 4/14/2019 Research in progress 20-36 Highway Research and Technology-- International Information Sharing TRB Cooperative Research Programs 850,000 1/26/1993 9/30/2023 Research ongoing; see project writeup on NCHRP website **

36 Nat i on al Coo perat ive Highway Research Program Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 20-44 Accelerating the Application of NCHRP Research Results Various 31,870 8/1/1995 9/30/2023** 20-44(01) Workshop on Increasing WMA Implementation by Leveraging the State-of-the-Knowledge Myers McCarthy Consulting Engineering, LLC 101,000 1/26/2017 6/15/2018 20-44(02) Implementation of the AASHTO Guide for Enterprise Risk Management StarIsis Corporation 2,999,979 4/2/2018 4/1/2020 20-44(03) Intellectual Property Management Guide Workshops and Assessments Applied Research Associates 115,500 7/28/2017 1/27/2019 20-44(05) Dissemination of "NCHRP Domestic Scan 14-01: Leading Management Practices in Determining Funding Levels for Maintenance and Preservation" Arora and Associates, P.C. 120,000 2/14/2018 8/13/2019 20-44(06) Consultant Support for Massachusetts DOT’s Commission on the Future of Transportation in the Commonwealth Burns & McDonnell Engineering Company Inc. 395,506 2/12/2018 2/28/2019 20-44(07) Implementing Single-User Software for Bidding Alternative Drainage Pipe Systems ----- 50,530 20-44(08) NCHRP Comprehensive Communications Plan LGND, LLC 100,000 10/1/2018 7/1/2019 20-44(09) Quantitative and Qualitative Methods for Capturing the Impacts and Value of NCHRP Research ----- 800,000 20-44(10) NHI 134115 Mobile LIDAR Online Learning Module Revisions Dragonfly Communication 6,000 8/3/2018 10/2/2018 20-44Q Communication Services for NCHRP CTC & Associates LLC 644,923 5/7/2015 8/6/2018 20-50(18) LTPP Data Analysis: Significance of As-Constructed Asphalt Pavement Air Voids to Pavement Performance Auburn University 425,000 4/1/2018 1/1/2020 20-50(19) LTPP Data Analysis: Feasibility of Using LTPP Data to Develop Relationships Between Laboratory- and Field-Derived Properties of Unbound Materials AMEC Foster Wheeler Environ & Infrastructure Inc. 69,762 6/11/2018 4/10/2019 20-50(20) LTPP Data Analysis: Develop Practical Tools and Procedures to Improve WIM Data Quality Applied Research Associates 350,000 10/1/2018 3/31/2021 20-50(21) Enhancements of Climatic Inputs and Related Models for Pavement ME Using LTPP Climate Tool (MERRA-2) Applied Research Associates 350,000 8/24/2018 2/23/2021 20-50(22) LTPP Data Analysis: Feasibility of Using LTPP Data to Improve Use of FWD and Longitudinal Profile Measurements ----- 100,000 20-59(30)A Train-the-Trainer Regional Workshops for Incident Command System (ICS) Training for Field Level Transportation Supervisors and Staff San Jose State University 150,000 7/11/2017 4/30/2019 Support for implementation and dissemination activities Completed---Contractor's report available on project web page Research in progress---Interim report pending Research in progress Research in progress Research in progress In development Research in progress In development Completed---Incorporated into NCHRP Project 15-44 Completed Research in progress Research in progress Research in progress Research in progress In development Research in progress--- Contractor's draft report pending

37 2018 Annual Repor t Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 20-59(51)A Security 101: A Physical & Cyber Security Primer for Transportation Agencies Countermeasures Assessment & Security Experts, LLC 100,000 2/10/2016 3/31/2018 Completed---To be published as an NCHRP Research Report 20-59(51)C Research Support for Implementing Security, Emergency Management, and Infrastructure Protection at State Transportation Agencies Geographic Paradigm Computing Inc. 100,000 11/18/2016 2/17/2018 Completed---Final report sent to AASHTO 20-59(53) FloodCast: A Framework for Enhanced Flood Event Decision Making for Transportation Resilience Dewberry Engineers Inc. 498,162 9/2/2014 3/31/2019 Research in progress--- Contractor's final report pending 20-59(54) Transportation System Resilience: Research Roadmap and White Papers Geographic Paradigm Computing Inc. 200,000 11/18/2016 8/30/2019 Research in progress--- Contractor's draft report pending 20-59(55) Transportation System Resilience: CEO Primer & Engagement Louis Berger & Associates 300,000 3/1/2017 2/28/2019 Research in progress--- Contractor's draft report pending 20-59(56) Support for State DOT Transportation Systems Resilience and All-Hazards Programs WSP USA, Inc. 250,000 6/16/2017 6/15/2019 Research in progress---Interim report pending; see NCHRP Project 20-117 20-65/Task 68 Successful Mobility Management Practices for Improving Transportation Services in Small Urban and Rural Areas Cambridge Systematics 75,000 9/20/2016 1/31/2018 Completed---Agency report available on project webpage 20-65/Task 72 Small System Alternative Fuel Strategies ICF Incorporated 74,959 9/29/2016 1/31/2018 Completed---Agency report available on project webpage 20-65/Task 73 Best Practices and Marketing to Increase Rural Transit Ridership and Investment ICF Incorporated 50,000 4/16/2018 12/15/2018 Completed---Publication decision pending 20-65/Task 75 Baseline Research on Allowable In- Kind and Local Match Sources AECOM Technical Services, Inc 125,000 5/14/2018 9/13/2019 Research in progress 20-65/Task 76 Opportunities for State DOTs (and Others) to Encourage Shared Use Mobility Practices in Rural Areas WSP USA Inc. 99,080 4/23/2018 7/22/2019 Research in progress 20-65/Task 77 Lessons Learned and Impacts to Date of State DOT Implementation of New Federal Transit Asset Management and Public Transportation Agency Safety Requirements ICF Incorporated 100,000 4/16/2018 4/15/2019 Research in progress 20-65/Task 78 Impact of Decline in Volunteerism on Rural Transit Systems AECOM Technical Services, Inc. 100,000 12/15/2018 12/15/2019 Research in progress 20-65/Task 79 Program Management Insights for the 5310 Program (Including Sub-Grantee Consolidation and Urban 5310) ICF Incorporated 125,000 12/15/2018 12/15/2019 Research in progress 20-65/Task 80 Capacity Building Options for DOT Transit Staff ICF Incorporated 100,000 12/15/2018 9/15/2019 Research in progress 20-65/Task 81 Best Practices in Rural Service Assessment AECOM Technical Services, Inc. 75,000 12/15/2018 12/15/2019 Research in progress 20-65/Task 82 Issues Associated with Providing Customized, Client-Based Transportation Services ----- 150,000 In development

38 Nat i on al Coo perat ive Highway Research Program Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 20-68A(02) Arora and Associates, P.C. 4,510,592 12/28/2012 12/26/2019 Research in progress 20-83(03)A WSP USA Inc. 499,999 5/18/2015 9/28/2018 Completed---Publication decision pending 20-95A Keen Independent Research LLC 174,997 4/10/2017 12/31/2018 Completed---Publication 20-97 Spy Pond Partners 899,975 4/18/2014 2/28/2019 20-101 Dewberry Engineers Inc. 299,210 9/1/2015 8/31/2018 20-102(04) ----- 75,000 20-102(05) ----- 100,000 20-102(06) Texas A&M Transportation Institute 200,000 7/13/2016 8/12/2018 20-102(07) Virginia Polytechnic Institute 350,000 11/14/2016 7/16/2018 20-102(08) Booz-Allen & Hamilton 349,929 8/2/2016 4/15/2018 20-102(09) Texas A&M Transportation Institute 300,000 9/1/2016 9/7/2018 decision pending Research in progress; Phase I report published as NCHRP Research Report 846 Completed---Publication decision pending Incorporated into NCHRP Project 08-116 Incorporated into NCHRP Project 08-116 Completed---To be published as an NCHRP Web-Only Document Completed---Agency report available as NCHRP Web- Only Document 253; Volumes 1-6 Completed---Published as NCHRP Research Report 891 Completed---Published as NCHRP Research Report 896 20-102(11) Booz-Allen & Hamilton 300,000 5/17/2018 11/16/2019 Research in progress; interim report pending 20-102(12) WSP USA Inc. 400,000 7/11/2017 1/10/2019 20-102(13) ----- 250,000 20-102(14) ----- 250,000 20-102(15) U.S. Domestic Scan Program Long-Range Strategic Issues Affecting Preservation, Maintenance, and Renewal of Highway Infrastructure Compendium of Successful Practices, Strategies, and Resources in the FHWA Disadvantaged Business Enterprise (DBE) Program Improving Findability and Relevance of Transportation Information Guidelines to Incorporate the Costs and Benefits of Adaptation Measures in Preparation for Extreme Weather Events and Climate Change Evaluation Guidance for Automated Vehicle Pilot and Demonstration Projects Strategic Communications Plan for NCHRP Project 20-102 Road Markings for Machine Vision Implications of Automation for Motor Vehicle Codes Dedicating Lanes for Priority or Exclusive Use by CVs and AVs Providing Support to the Introduction of CV/AV Impacts into Regional Transportation Planning and Modeling Tools Mobility-on-Demand and Automated Driving Systems: A Framework for Public-Sector Assessment Business Models to Facilitate Deployment of CV Infrastructure to Support AV Operations Planning Data Needs and Collection Techniques for CV/AV Applications Data Management Strategies for CV/AV Applications for Operations Impacts of Connected and Automated Vehicle Technologies on the Highway Infrastructure Booz-Allen & Hamilton 649,966 5/24/2018 2/23/2020 Research in progress Incorporated into NCHRP Project 08-119 Incorporated into NCHRP Project 08-119 Research in progress

39 2018 Annual Repor t Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 20-102(16) ----- 250,000 In development 20-102(17) ----- 450,000 In development 20-102(18) ----- 225,000 Incorporated into NCHRP Project 17-91 20-102(19) Booz-Allen & Hamilton 124,904 3/13/2018 3/12/2020 Research in progress 20-105A Applied Research Associates 220,700 6/1/2016 7/1/2019 20-107 University of Kentucky Research Foundation 499,613 6/28/2016 9/30/2018 20-108 Burns & McDonnell Engineering Company Inc. 249,954 7/11/2016 6/30/2018 20-109 Information International Associates Inc. 219,074 7/28/2016 5/16/2018 20-110 University of Michigan 249,960 8/5/2016 6/30/2018 20-111J Applied Research Associates 100,000 5/15/2018 7/14/2019 20-112 University of North Carolina - Chapel Hill 250,000 9/26/2017 3/25/2019 20-113 ----- 130,000 20-113E ----- 25,000 Research in progress Completed---To be published as an NCHRP Research Report Completed---Published as NCHRP Research Report 885 and NCHRP Web-Only Document 253 Completed---Published as NCHRP Research Report 874; a phase 2 is being developed Completed---Publication decision pending Research in progress Research in progress In development Completed 20-114 Texas A&M Transportation Institute 250,000 5/15/2017 12/31/2018 Completed---Publication decision pending 20-116 ----- 750,000 20-117 WSP USA Inc. 1,000,000 6/16/2017 6/15/2019 20-118 Preparing TIM Responders for Connected Vehicles and Automated Vehicles Deployment Guidance for CV Applications in the Open Source Application Development Portal Minimum Safety Data Needed for Automated Vehicle Operations and Crash Analysis Update AASHTO’s Connected Vehicle/Automated Vehicle Research Roadmap Development of Course Outlines for Ahead of the Curve Training Program: Mastering the Management of Transportation Research Effective Construction Project Staffing Strategies for Transportation Agencies Effective Practices for Creating and Maintaining an Innovation-Delivery Culture within Departments of Transportation Enhancement of the Transportation Research Thesaurus A Guide to Ensure Access to the Publications and Data of Federally Funded Transportation-Related Research Successful Practices for State Transportation Research Office's Complying with 2 CFR 200 A Research Roadmap for Transportation and Public Health Research Roadmap--Transformational Technologies (other than CV/AV) Support for TRB's Forum on AVs and Shared Mobility Multimodal Freight Transportation Research Roadmap Emergency Management in State Transportation Agencies Deploying Transportation Resilience Practices in State DOTs Benchmarking for Effective Performance Management for Transportation Agencies High Street Consulting Group 499,060 4/10/2017 9/9/2018 In development Research in progress---Interim report pending Completed---To be published as NCHRP Research Report 902

40 Nat i on al Coo perat ive Highway Research Program Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 20-119 Evaluating the Suitability of Roadway Corridors for Use by Monarch Butterflies University of Minnesota 349,821 3/13/2017 9/13/2019 Research in progress 20-121 State DOT Contributions to the Study, Investigation, and Interdiction of Human Trafficking Project Performance Corporation 299,883 5/31/2018 3/30/2020 Research in progress---Interim report pending 20-122 Rural Transportation Issues: Research Roadmap Montana State University 200,000 10/9/2018 10/8/2019 Research in progress--- Contractor's draft report pending 20-123 Support for AASHTO Committees ----- 1,500,000 In development 20-124 Deploying Transportation Security Practices in State DOTs ----- 750,000 In development 20-125 Strategies for Incorporating Resilience into Transportation Networks ----- 600,000 In development AREA TWENTY-ONE : SOILS AND GEOLOGY--TESTING AND INSTRUMENTATION 21-10 Manual on Subsurface Investigations-- Update GeoSyntec Consultants of North Carolina PC 299,912 6/17/2014 9/28/2018 21-11 Improved Test Methods and Practices for Characterizing Steel Corrosion Potential of Earthen Materials McMahon & Mann Consulting Engineers PC 400,000 7/5/2016 6/30/2019 Completed---To be available as an NCHRP Web-Only Document Research in progress AREA TWENTY-TWO : DESIGN--VEHICLE BARRIER SYSTEMS 22-26 Identification of Factors Related to Serious Injury and Fatal Motorcycle Crashes into Traffic Barriers Virginia Polytechnic Institute 500,000 5/1/2009 12/31/2019 Research in progress--- Contractor's draft report pending 22-29B Evaluating the Performance of Longitudinal Barriers on Curved, Superelevated Off-Ramps ----- 250,000 In development 22-31 Recommended Guidelines for the Selection and Placement of Test Levels 2 through 5 Median Barriers Roadsafe LLC 577,000 9/28/2015 5/31/2020 Research in progress 22-32 Development of Methods to Evaluate Side Impacts with Roadside Safety Features Roadsafe LLC 500,000 1/2/2018 5/2/2021 Research in progress 22-33 MultiState InService Performance Evaluations of Roadside Safety Hardware Roadsafe LLC 650,000 1/2/2018 5/2/2021 Research in progress 22-34 Determination of Zone of Intrusion Envelopes under MASH Impact Conditions for Barrier Attachments University of Nebraska - Lincoln 400,000 6/20/2018 9/19/2021 Research in progress 22-35 Evaluation of Bridge Rail Systems to Confirm AASHTO MASH Compliance Texas A&M Transportation Institute 500,000 6/1/2018 6/30/2021 Research in progress 22-36 Synthesis of the Performance of Portable Concrete Barrier Systems Texas A&M Transportation Institute 50,000 7/13/2018 3/12/2019 Research in progress 22-37 Development of a Barrier Design to Accommodate Vehicles, Pedestrians, and Cyclists ----- 500,000 In development

41 2018 Annual Repor t Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 22-38 Development of MASH TL-3 Deflection Reduction Guidance for 31- inch Guardrail ----- 500,000 In development 22-39 Guardrail Performance at Various Offsets from Curb for MASH TL-3 Applications ----- 600,000 In development 22-40 Update to AASHTO M180 and Associated Material Specifications ----- 300,000 In development 22-41 Improvement and Reorganization of Section 13 of the AASHTO LRFD Bridge Design Specifications to Address MASH Loading ----- 250,000 In development AREA TWENTY-FOUR : SOILS AND GEOLOGY--MECHANICS AND FOUNDATIONS 24-41 Defining the Boundary Conditions for Composite Behavior of Geosynthetic Reinforced Soil (GRS) Structures University of Texas - Austin 500,000 9/1/2014 10/31/2018 Completed---Publication decision pending 24-42 Underwater Installation of Filter Systems for Scour and Other Erosion Control Countermeasures Ayres Associates 300,000 6/30/2014 3/31/2018 Completed---Published as NCHRP Research Report 887 and Web-Only Document 254 24-43 Relationship between Erodibility and Properties of Soils Texas A&M Transportation Institute 300,000 8/11/2015 11/30/2018 Completed---Publication decision pending 24-44 Guidelines for Managing Geotechnical Risks in Design-Build Projects Iowa State University 349,277 6/1/2015 2/28/2018 Completed---Published as NCHRP Research Report 884 and Web-Only Document 257 24-45 Evaluating Mechanical Properties of Earth Material During Intelligent Compaction University of Texas - El Paso 500,000 7/27/2015 12/31/2019 Research in progress 24-46 Development of an Implementation Manual for Geotechnical Asset Management for Transportation Agencies Shannon & Wilson, Inc. 499,682 7/27/2016 9/27/2018 Completed---Publication decision pending 24-47 Revised Clear-Water and Live-Bed Contraction Scour Analysis Ayres Associates 500,000 10/6/2016 4/6/2019 Research in progress---Interim report under review AREA TWENTY-FIVE : IMPACT ANALYSIS 25-25/Task 96 Quick Reference Guide for Traffic Modelers for Generating Traffic and Activity Data for Project-Level Air Quality Analyses WSP USA Inc. 75,000 11/4/2015 5/31/2018 Completed---Final report sent to AASHTO 25-25/Task 98 Practical Guide for Developing Effective Scopes of Work for the Geophysical Investigation of Cemeteries WSP USA Inc. 74,961 2/16/2016 1/26/2018 Completed---Final report sent to AASHTO 25-25/Task 102 Artificial Bat Roost Mitigation Designs and Standardized Monitoring Criteria Louis Berger Group 125,000 11/27/2017 5/26/2019 Research in progress---Interim report pending

42 Nat i on al Coo perat ive Highway Research Program Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 25-25/Task 103 Administration of Categorical Exclusions by State Departments of Transportation (DOTs) under NEPA WSP USA Inc. 59,897 3/5/2018 3/4/2019 Research in progress---Interim report pending 25-25/Task 104 Streamlining Carbon Monoxide Project-Level Air Quality Analyses with Programmatic Agreements Louis Berger Group 125,000 11/27/2017 11/26/2019 Research in progress---Interim 25-25/Task 105 A Guidebook for Communications between Transportation and Public Health Communities Louis Berger U.S. Inc. 125,000 3/1/2018 2/28/2019 25-25/Task 106 National Synthesis of Highway Noise Effects on Historic Properties and Effective Mitigation Practices Louis Berger U.S. Inc. 100,000 3/1/2018 2/28/2019 25-25/Task 107 Synthesis of Best Practices for the Development and Implementation of Section 106 Delegation Programmatic Agreements Louis Berger U.S. Inc. 100,000 3/1/2018 2/28/2019 25-25/Task 108 Creating Lookup Tables to Streamline the Determination of Emission Reductions for CMAQ Projects Louis Berger U.S. Inc. 125,000 3/1/2018 2/28/2019 25-25/Task 109 Successful Practices for Environmental Commitments in Public/Private Partnerships (P-3) and Design-Build (D-B) Contracts Louis Berger U.S. Inc. 125,000 4/2/2018 4/1/2019 25-25/Task 110 National Synthesis of Successful Strategies for Managing Post-World War II Resources in Historic Property Identification Surveys Louis Berger U.S. Inc. 100,000 2/15/2018 2/14/2019 25-25/Task 111 Environmental Management System Perspectives for State DOTs Louis Berger Group 110,000 1/1/2018 2/28/2019 25-25/Task 112 Enhancing the International Stormwater BMP Database to Serve as a Highway Specific BMP Database Transferred 0 25-25/Task 113 Highway Passages for Small Terrestrial Wildlife - Summary and Repository of Design Examples Louis Berger U.S. Inc. 125,000 3/20/2018 9/19/2019 report pending Research in progress--- Contractor's draft report pending Research in progress--- Contractor's draft report pending Research in progress--- Contractor's draft report pending Research in progress---Interim report pending Research in progress---Interim report pending Research in progress---Interim report pending Research in progress--- Contractor's final report under review Terminated---See NCHRP Project 25-25/Tasks 119 and 120 for follow-on activity Research in progress--- Interim report pending 25-25/Task 114 Integrating Tribal Knowledge into Processes to Identify, Evaluate, and Record Cultural Resources Louis Berger U.S. Inc. 125,000 11/15/2018 11/14/2019 Research in progress---Interim report pending 25-25/Task 115 Estimates of Emissions Reductions from Future Fleet Changes for Use in Air Quality Models ----- 125,000 Contract pending 25-25/Task 116 Recommendations for Additional Section 106 Program Comments or Exemptions Louis Berger U.S. Inc. 125,000 11/15/2018 11/14/2019 Research in progress---Interim report pending 25-25/Task 117 Valuing Wildlife Crossing Enhancements for Mitigation Credits Louis Berger U.S. Inc. 115,000 11/15/2018 11/14/2019 Research in progress---Interim report pending 25-25/Task 118 Context-Sensitive Design Options for Workhorse Bridges in Rural Historic Districts Louis Berger U.S. Inc. 110,000 11/15/2018 11/14/2019 Research in progress---Interim report pending

43 2018 Annual Repor t Project No. Title Research Agency Contract Amount Starting Date Completion Date Project Status * TABLE 2 (continued) 25-25/Task 119 Enhancing the International Stormwater BMP Database to Serve as a Highway Specific BMP Database ----- 80,000 Contract pending 25-25/Task 120 Use of the State Department of Transportation Portal to the International Stormwater BMP Database GeoSyntec Consultants 24,999 8/13/2018 11/12/2019 Research in progress---Interim report pending 25-44 Field Evaluation of Reflected Noise from a Single Noise Barrier Resource Systems Group, Inc. 549,969 9/4/2013 2/1/2018 Completed---Published as NCHRP Research Report 888 25-47 How to Measure and Communicate the Value of Access Management University of South Florida 600,000 5/17/2018 11/16/2020 Research in progress 25-49 Development of a Highway Construction Noise Prediction Model Gannett Fleming, Inc. 349,579 11/2/2015 3/8/2019 Research in progress--- Contractor's final report pending 25-50 Prioritization Procedure for Proposed Road-Rail Grade Separation Projects along Specific Rail Corridors Olsson Associates Inc. 349,763 9/28/2015 9/28/2018 Completed---To be published as NCHRP Research Report 901 25-51 Limitations of the Infiltration Approach to Stormwater Management in the Highway Environment GeoSyntec Consultants 499,772 8/10/2015 1/31/2019 Research in progress 25-53 Approaches for Determining and Complying with TMDL Requirements Related to Roadway Stormwater Runoff Michael Baker International 199,973 12/9/2016 12/9/2018 Completed---Publication decision pending 25-54 Field Testing of BMPs Using Granulated Ferric Oxide Media to Remove Dissolved Metals in Roadway Stormwater Runoff Barr Engineering 400,000 9/16/2016 5/15/2019 Research in progress--- Contractor's draft report pending 25-55 Quantifying the Contribution of Vehicle Emissions to Local Air Quality ICF Incorporated 700,000 6/4/2018 6/3/2021 Research in progress 25-56 Methods for State DOTs to Reduce Greenhouse Gas Emissions from the Transportation Sector Cambridge Systematics 600,000 5/1/2018 10/31/2020 Research in progress---Interim report pending 25-57 Innovative Mitigation Strategies for Highway Noise ----- 250,000 In development 25-58 Post-World War II Commercial Properties and Transportation Project Development: Historic Context and National Guidance on Evaluation of National Register of Historic Places Eligibility ----- 300,000 In development 25-59 Regional Guidebooks of Current Practices for Roadside Pollinator Conservation and Endangered Species Act Compliance ----- 500,000 In development 25-60 Watershed Approach to Mitigating Hydrologic Impacts of Highway Projects ----- 500,000 In development * Information on all projects initiated under the NCHRP from its inception in 1962 through 1988 is included in NCHRP Web Document 7: Special Edition of Summary of Progress through 1988 located at http://tinyurl.com/NCHRPWebDoc7. Detailed status reports on projects initiated after 1988 for which there is any type of contractual activity can be found on the NCHRP website at www.trb.org/nchrp. ** Continuing activity. Amount shown is for latest fiscal year in which funding was provided.

Next: How to Obtain Publications and Other Materials »
NCHRP 2018 Annual Report Get This Book
×
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s National Cooperative Highway Research Program (NCHRP) has released its annual report. During 2018, NCHRP completed 150 research projects, published 68 research products, and approved 58 new and continuation projects. The report also presents detailed information about the operation of NCHRP.

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!