Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
183 Appendix B: SCP Rating Survey Results
184 How to Read TABLE B1: Each SCP surveyed has four participant inputs: ï· Effort ï· Human welfare ï· Environmental benefit ï· Cost savings From these the impact-to-effort ratio is calculated as: impact-to-effort-ratio human welfare environmental benefit cost savingseffort Salmon highlighted SCPS were not included in the final SCP list (TABLE ) either combined together because they were similar to another or eliminated because they were too generic, did not meet the definition of a SCP or were too specific of an example of a more generic idea. The list of SCPs that were rated comes from the draft list of SCPs (TABLE), which were further edited to achieve the final SCP list (TABLE ). ï·
185 TABLE B1. SCP Rating Survey Results ID IMPACT SCP Aux Col. AVG (No Impact=0) 1 Effort (time and cost): Delivery Methods that Allow Contractor Input in the Design Phase Effort (time and cost): 2.7   Impact/Effort Ratio 2 Human Welfare: Delivery Methods that Allow Contractor Input in the Design Phase Human Welfare: 2.0   2.8 3 Environmental Benefit: Delivery Methods that Allow Contractor Input in the Design Phase Environmental Benefit: 2.1   4 Cost Savings: Delivery Methods that Allow Contractor Input in the Design Phase Cost Savings: 3.3   5 Impact/Effect Ratio: Impact/Effect Ratio: 2.8     6 Effort (time and cost): Early Inclusion of Sustainability Objectives Effort (time and cost): 1.9   Impact/Effort Ratio 7 Human Welfare: Early Inclusion of Sustainability Objectives Human Welfare: 3.0   4.7 8 Environmental Benefit: Early Inclusion of Sustainability Objectives Environmental Benefit: 3.3   9 Cost Savings: Early Inclusion of Sustainability Objectives Cost Savings: 2.5   10 Impact/Effect Ratio: Impact/Effect Ratio: 4.7     11 Effort (time and cost): Use the FHWA's "Integrated Approach for Sustainable Construction" Guidance Effort (time and cost): 2.6   Impact/Effort Ratio 12 Human Welfare: Use the FHWA's "Integrated Approach for Sustainable Construction" Guidance Human Welfare: 2.4   2.6 13 Environmental Benefit: Use the FHWA's "Integrated Approach for Sustainable Construction" Guidance Environmental Benefit: 2.6   14 Cost Savings: Use the FHWA's "Integrated Approach for Sustainable Construction" Guidance Cost Savings: 1.7   15 Impact/Effect Ratio: Impact/Effect Ratio: 2.6     16 Effort (time and cost): Life Cycle Cost Analysis (LCCA) Effort (time and cost): 3.1   Impact/Effort Ratio 17 Human Welfare: Life Cycle Cost Analysis (LCCA) Human Welfare: 1.4   2.1 18 Environmental Benefit: Life Cycle Cost Analysis (LCCA) Environmental Benefit: 1.9   19 Cost Savings: Life Cycle Cost Analysis (LCCA) Cost Savings: 3.4   20 Impact/Effect Ratio: Impact/Effect Ratio: 2.1     21 Effort (time and cost): Public-Private Partnership (PPP) Effort (time and cost): 3.6   Impact/Effort Ratio 22 Human Welfare: Public-Private Partnership (PPP) Human Welfare: 2.1   1.8 23 Environmental Benefit: Public-Private Partnership (PPP) Environmental Benefit: 1.6   24 Cost Savings: Public-Private Partnership (PPP) Cost Savings: 2.8   25 Impact/Effect Ratio: Impact/Effect Ratio: 1.8     26 Effort (time and cost): Include Sustainability in Best Value Procurement Effort (time and cost): 2.1   Impact/Effort Ratio 27 Human Welfare: Include Sustainability in Best Value Procurement Human Welfare: 3.1   4.1 28 Environmental Benefit: Include Sustainability in Best Value Procurement Environmental Benefit: 3.5   29 Cost Savings: Include Sustainability in Best Value Procurement Cost Savings: 2.3   30 Impact/Effect Ratio: Impact/Effect Ratio: 4.1     31 Effort (time and cost): Value Engineering during Procurement, aka Alternative Technical Concept (ATC) Effort (time and cost): 3.1   Impact/Effort Ratio 32 Human Welfare: Value Engineering during Procurement, aka Alternative Technical Concept (ATC) Human Welfare: 2.5   2.8 33 Environmental Benefit: Value Engineering during Procurement, aka Alternative Technical Concept (ATC) Environmental Benefit: 2.7   34 Cost Savings: Value Engineering during Procurement, aka Alternative Technical Concept (ATC) Cost Savings: 3.5   35 Impact/Effect Ratio: Impact/Effect Ratio: 2.8            Â
186 ID IMPACT SCP Aux Col. AVG (No Impact=0) 36 Effort (time and cost): Value Engineering during Construction, aka Value Engineering Change Proposals Effort (time and cost): 2.5  Impact/Effort Ratio 37 Human Welfare: Value Engineering during Construction, aka Value Engineering Change Proposals Human Welfare: 1.8  2.7 38 Environmental Benefit: Value Engineering during Construction, aka Value Engineering Change Proposals Environmental Benefit: 1.8  39 Cost Savings: Value Engineering during Construction, aka Value Engineering Change Proposals Cost Savings: 3.0  40 Impact/Effect Ratio: Impact/Effect Ratio: 2.7  42 Effort (time and cost): Use a Sustainability Rating System Effort (time and cost): 2.2  Impact/Effort Ratio 43 Human Welfare: Use a Sustainability Rating System Human Welfare: 3.5  3.9 44 Environmental Benefit: Use a Sustainability Rating System Environmental Benefit: 3.5  45 Cost Savings: Use a Sustainability Rating System Cost Savings: 1.4  46 Impact/Effect Ratio: Impact/Effect Ratio: 3.9  47 Effort (time and cost): Indefinite Delivery/ Indefinite Quantity (IDIQ) Effort (time and cost): 2.3  Impact/Effort Ratio 48 Human Welfare: Indefinite Delivery/ Indefinite Quantity (IDIQ) Human Welfare: 0.5  0.9 49 Environmental Benefit: Indefinite Delivery/ Indefinite Quantity (IDIQ) Environmental Benefit: 0.5  50 Cost Savings: Indefinite Delivery/ Indefinite Quantity (IDIQ) Cost Savings: 1.0  51 Impact/Effect Ratio: Impact/Effect Ratio: 0.9  52 Effort (time and cost): Environmental Product Declarations (EPDs) Effort (time and cost): 2.6  Impact/Effort Ratio 53 Human Welfare: Environmental Product Declarations (EPDs) Human Welfare: 1.9  2.0 54 Environmental Benefit: Environmental Product Declarations (EPDs) Environmental Benefit: 2.9  55 Cost Savings: Environmental Product Declarations (EPDs) Cost Savings: 0.4  56 Impact/Effect Ratio: Impact/Effect Ratio: 2.0  57 Effort (time and cost): Schedule Flexibility for Contractor Effort (time and cost): 1.8  Impact/Effort Ratio 58 Human Welfare: Schedule Flexibility for Contractor Human Welfare: 1.7  2.9 59 Environmental Benefit: Schedule Flexibility for Contractor Environmental Benefit: 1.2  60 Cost Savings: Schedule Flexibility for Contractor Cost Savings: 2.3  61 Impact/Effect Ratio: Impact/Effect Ratio: 2.9  62 Effort (time and cost): Anti-Idling Policy Effort (time and cost): 1.3  Impact/Effort Ratio 63 Human Welfare: Anti-Idling Policy Human Welfare: 2.7  5.8 64 Environmental Benefit: Anti-Idling Policy Environmental Benefit: 2.9  65 Cost Savings: Anti-Idling Policy Cost Savings: 2.1  66 Impact/Effect Ratio: Impact/Effect Ratio: 5.8  67 Effort (time and cost): Sustainable Procurement Rules Effort (time and cost): 2.2  Impact/Effort Ratio 68 Human Welfare: Sustainable Procurement Rules Human Welfare: 2.7  3.4 69 Environmental Benefit: Sustainable Procurement Rules Environmental Benefit: 3.1  70 Cost Savings: Sustainable Procurement Rules Cost Savings: 1.7  71 Impact/Effect Ratio: Impact/Effect Ratio: 3.4 Â
187 ID IMPACT SCP Aux Col. AVG (No Impact=0) 72 Effort (time and cost): Accelerated Construction to Minimize Traffic Delays Effort (time and cost): 2.9  Impact/Effort Ratio 73 Human Welfare: Accelerated Construction to Minimize Traffic Delays Human Welfare: 3.2  2.8 74 Environmental Benefit: Accelerated Construction to Minimize Traffic Delays Environmental Benefit: 2.7  75 Cost Savings: Accelerated Construction to Minimize Traffic Delays Cost Savings: 2.2  76 Impact/Effect Ratio: Impact/Effect Ratio: 2.8  77 Effort (time and cost): Allow Daytime Work Effort (time and cost): 1.5   Impact/Effort Ratio 78 Human Welfare: Allow Daytime Work Human Welfare: 1.6   3.1 79 Environmental Benefit: Allow Daytime Work Environmental Benefit: 1.1   80 Cost Savings: Allow Daytime Work Cost Savings: 2.2   81 Impact/Effect Ratio: Impact/Effect Ratio: 3.1   82 Effort (time and cost): Less Traffic Restrictions Effort (time and cost): 1.5  Impact/Effort Ratio 83 Human Welfare: Less Traffic Restrictions Human Welfare: 2.1  3.7 84 Environmental Benefit: Less Traffic Restrictions Environmental Benefit: 1.3  85 Cost Savings: Less Traffic Restrictions Cost Savings: 2.3  86 Impact/Effect Ratio: Impact/Effect Ratio: 3.7  87 Effort (time and cost): Flexible Work Window Effort (time and cost): 1.9   Impact/Effort Ratio 88 Human Welfare: Flexible Work Window Human Welfare: 1.9   2.9 89 Environmental Benefit: Flexible Work Window Environmental Benefit: 1.4   90 Cost Savings: Flexible Work Window Cost Savings: 2.2   91 Impact/Effect Ratio: Impact/Effect Ratio: 2.9   92 Effort (time and cost): Model-Based Estimating (BIM) Effort (time and cost): 2.9  Impact/Effort Ratio 93 Human Welfare: Model-Based Estimating (BIM) Human Welfare: 0.5  1.4 94 Environmental Benefit: Model-Based Estimating (BIM) Environmental Benefit: 0.9  95 Cost Savings: Model-Based Estimating (BIM) Cost Savings: 2.8  96 Impact/Effect Ratio: Impact/Effect Ratio: 1.4  97 Effort (time and cost): Life Cycle Cost Consideration Effort (time and cost): 3.0  Impact/Effort Ratio 98 Human Welfare: Life Cycle Cost Consideration Human Welfare: 1.6  2.4 99 Environmental Benefit: Life Cycle Cost Consideration Environmental Benefit: 2.1  100 Cost Savings: Life Cycle Cost Consideration Cost Savings: 3.4  101 Impact/Effect Ratio: Impact/Effect Ratio: 2.4  102 Effort (time and cost): Enhanced Information Technologies (IT) Effort (time and cost): 2.8  Impact/Effort Ratio 103 Human Welfare: Enhanced Information Technologies (IT) Human Welfare: 1.8  1.8 104 Environmental Benefit: Enhanced Information Technologies (IT) Environmental Benefit: 1.3  105 Cost Savings: Enhanced Information Technologies (IT) Cost Savings: 2.1  106 Impact/Effect Ratio: Impact/Effect Ratio: 1.8 Â
188 ID IMPACT SCP Aux Col. AVG (No Impact=0) 107 Effort (time and cost): Geomatics Effort (time and cost): 2.8  Impact/Effort Ratio 108 Human Welfare: Geomatics Human Welfare: 0.9  1.4 109 Environmental Benefit: Geomatics Environmental Benefit: 0.9  110 Cost Savings: Geomatics Cost Savings: 2.1  111 Impact/Effect Ratio: Impact/Effect Ratio: 1.4  112 Effort (time and cost): Balanced Cut/Fill Effort (time and cost): 2.0  Impact/Effort Ratio 113 Human Welfare: Balanced Cut/Fill Human Welfare: 1.2  3.8 114 Environmental Benefit: Balanced Cut/Fill Environmental Benefit: 3.2  115 Cost Savings: Balanced Cut/Fill Cost Savings: 3.1  116 Impact/Effect Ratio: Impact/Effect Ratio: 3.8  117 Effort (time and cost): Trenchless Technologies Effort (time and cost): 2.5  Impact/Effort Ratio 118 Human Welfare: Trenchless Technologies Human Welfare: 1.9  2.8 119 Environmental Benefit: Trenchless Technologies Environmental Benefit: 3.3  120 Cost Savings: Trenchless Technologies Cost Savings: 2.1  121 Impact/Effect Ratio: Impact/Effect Ratio: 2.8  122 Effort (time and cost): Ground Improvement Instead of Remove/Replace Effort (time and cost): 2.7  Impact/Effort Ratio 123 Human Welfare: Ground Improvement Instead of Remove/Replace Human Welfare: 1.0  2.1 124 Environmental Benefit: Ground Improvement Instead of Remove/Replace Environmental Benefit: 2.8  125 Cost Savings: Ground Improvement Instead of Remove/Replace Cost Savings: 1.8  126 Impact/Effect Ratio: Impact/Effect Ratio: 2.1  127 Effort (time and cost): Economical Aesthetic Wall Design Effort (time and cost): 2.3  Impact/Effort Ratio 128 Human Welfare: Economical Aesthetic Wall Design Human Welfare: 2.9  2.4 129 Environmental Benefit: Economical Aesthetic Wall Design Environmental Benefit: 1.1  130 Cost Savings: Economical Aesthetic Wall Design Cost Savings: 1.5  131 Impact/Effect Ratio: Impact/Effect Ratio: 2.4  132 Effort (time and cost): Context-Sensitive Rock Slopes Effort (time and cost): 3.0  Impact/Effort Ratio 133 Human Welfare: Context-Sensitive Rock Slopes Human Welfare: 2.2  1.7 134 Environmental Benefit: Context-Sensitive Rock Slopes Environmental Benefit: 1.8  135 Cost Savings: Context-Sensitive Rock Slopes Cost Savings: 1.1  136 Impact/Effect Ratio: Impact/Effect Ratio: 1.7  137 Effort (time and cost): Construction Site Aesthetics Effort (time and cost): 2.0  Impact/Effort Ratio 138 Human Welfare: Construction Site Aesthetics Human Welfare: 2.5  2.3 139 Environmental Benefit: Construction Site Aesthetics Environmental Benefit: 0.6  140 Cost Savings: Construction Site Aesthetics Cost Savings: 1.5  141 Impact/Effect Ratio: Impact/Effect Ratio: 2.3 Â
189 ID IMPACT SCP Aux Col. AVG (No Impact=0) 142 Effort (time and cost): Accelerated Bridge Construction (ABC) Effort (time and cost): 3.5   Impact/Effort Ratio 143 Human Welfare: Accelerated Bridge Construction (ABC) Human Welfare: 3.5   2.5 144 Environmental Benefit: Accelerated Bridge Construction (ABC) Environmental Benefit: 2.7   145 Cost Savings: Accelerated Bridge Construction (ABC) Cost Savings: 2.3   146 Impact/Effect Ratio: Impact/Effect Ratio: 2.5     147 Effort (time and cost): Segmental Concrete Effort (time and cost): 3.0   Impact/Effort Ratio 148 Human Welfare: Segmental Concrete Human Welfare: 1.7   2.0 149 Environmental Benefit: Segmental Concrete Environmental Benefit: 1.9   150 Cost Savings: Segmental Concrete Cost Savings: 2.3   151 Impact/Effect Ratio: Impact/Effect Ratio: 2.0     152 Effort (time and cost): Geo-Synthetic Reinforced Soil-Integrated Bridge Systems Effort (time and cost): 2.6   Impact/Effort Ratio 153 Human Welfare: Geo-Synthetic Reinforced Soil-Integrated Bridge Systems Human Welfare: 1.6   2.6 154 Environmental Benefit: Geo-Synthetic Reinforced Soil-Integrated Bridge Systems Environmental Benefit: 2.3   155 Cost Savings: Geo-Synthetic Reinforced Soil-Integrated Bridge Systems Cost Savings: 2.8   156 Impact/Effect Ratio: Impact/Effect Ratio: 2.6     157 Effort (time and cost): General: Smoothness Specification Effort (time and cost): 2.1   Impact/Effort Ratio 158 Human Welfare: General: Smoothness Specification Human Welfare: 2.4   2.9 159 Environmental Benefit: General: Smoothness Specification Environmental Benefit: 2.1   160 Cost Savings: General: Smoothness Specification Cost Savings: 1.4   161 Impact/Effect Ratio: Impact/Effect Ratio: 2.9     162 Effort (time and cost): General: Warranties Effort (time and cost): 2.4   Impact/Effort Ratio 163 Human Welfare: General: Warranties Human Welfare: 1.2   1.7 164 Environmental Benefit: General: Warranties Environmental Benefit: 1.3   165 Cost Savings: General: Warranties Cost Savings: 1.5   166 Impact/Effect Ratio: Impact/Effect Ratio: 1.7     167 Effort (time and cost): General: On-Site Recycling/Reuse Effort (time and cost): 2.3   Impact/Effort Ratio 168 Human Welfare: General: On-Site Recycling/Reuse Human Welfare: 1.8   3.8 169 Environmental Benefit: General: On-Site Recycling/Reuse Environmental Benefit: 3.9   170 Cost Savings: General: On-Site Recycling/Reuse Cost Savings: 3.0   171 Impact/Effect Ratio: Impact/Effect Ratio: 3.8     172 Effort (time and cost): Asphalt: Density Effort (time and cost): 1.9   Impact/Effort Ratio 173 Human Welfare: Asphalt: Density Human Welfare: 1.1   2.8 174 Environmental Benefit: Asphalt: Density Environmental Benefit: 1.7   175 Cost Savings: Asphalt: Density Cost Savings: 2.4   176 Impact/Effect Ratio: Impact/Effect Ratio: 2.8                Â
190 ID IMPACT SCP Aux Col. AVG (No Impact=0) 177 Effort (time and cost): Asphalt: Longitudinal Joints Effort (time and cost): 1.9   Impact/Effort Ratio 178 Human Welfare: Asphalt: Longitudinal Joints Human Welfare: 1.2   2.4 179 Environmental Benefit: Asphalt: Longitudinal Joints Environmental Benefit: 1.4   180 Cost Savings: Asphalt: Longitudinal Joints Cost Savings: 1.9   181 Impact/Effect Ratio: Impact/Effect Ratio: 2.4     182 Effort (time and cost): Asphalt: Eliminate Segregation Effort (time and cost): 2.0   Impact/Effort Ratio 183 Human Welfare: Asphalt: Eliminate Segregation Human Welfare: 1.3   2.3 184 Environmental Benefit: Asphalt: Eliminate Segregation Environmental Benefit: 1.6   185 Cost Savings: Asphalt: Eliminate Segregation Cost Savings: 1.7   186 Impact/Effect Ratio: Impact/Effect Ratio: 2.3     187 Effort (time and cost): Asphalt: Eliminate Density Differentials Effort (time and cost): 1.9   Impact/Effort Ratio 188 Human Welfare: Asphalt: Eliminate Density Differentials Human Welfare: 1.0   2.2 189 Environmental Benefit: Asphalt: Eliminate Density Differentials Environmental Benefit: 1.2   190 Cost Savings: Asphalt: Eliminate Density Differentials Cost Savings: 2.0   191 Impact/Effect Ratio: Impact/Effect Ratio: 2.2     192 Effort (time and cost): Asphalt: Tack Coat Application Effort (time and cost): 1.6   Impact/Effort Ratio 193 Human Welfare: Asphalt: Tack Coat Application Human Welfare: 0.9   3.0 194 Environmental Benefit: Asphalt: Tack Coat Application Environmental Benefit: 1.6   195 Cost Savings: Asphalt: Tack Coat Application Cost Savings: 2.1   196 Impact/Effect Ratio: Impact/Effect Ratio: 3.0     197 Effort (time and cost): Concrete: Dowel Alignment Effort (time and cost): 1.3   Impact/Effort Ratio 198 Human Welfare: Concrete: Dowel Alignment Human Welfare: 0.8   2.9 199 Environmental Benefit: Concrete: Dowel Alignment Environmental Benefit: 1.3   200 Cost Savings: Concrete: Dowel Alignment Cost Savings: 1.6   201 Impact/Effect Ratio: Impact/Effect Ratio: 2.9     202 Effort (time and cost): Concrete: Use HIPERPAV To Predict Early Age Concrete Behavior Effort (time and cost): 2.0   Impact/Effort Ratio 203 Human Welfare: Concrete: Use HIPERPAV To Predict Early Age Concrete Behavior Human Welfare: 0.9   2.0 204 Environmental Benefit: Concrete: Use HIPERPAV To Predict Early Age Concrete Behavior Environmental Benefit: 1.3   205 Cost Savings: Concrete: Use HIPERPAV To Predict Early Age Concrete Behavior Cost Savings: 1.8   206 Impact/Effect Ratio: Impact/Effect Ratio: 2.0     207 Effort (time and cost): Concrete: Non-Potable Water for Concrete Mixtures and Wash Water Effort (time and cost): 1.5   Impact/Effort Ratio 208 Human Welfare: Concrete: Non-Potable Water for Concrete Mixtures and Wash Water Human Welfare: 1.8   4.6 209 Environmental Benefit: Concrete: Non-Potable Water for Concrete Mixtures and Wash Water Environmental Benefit: 3.2   210 Cost Savings: Concrete: Non-Potable Water for Concrete Mixtures and Wash Water Cost Savings: 1.7   211 Impact/Effect Ratio: Impact/Effect Ratio: 4.6                Â
191 ID IMPACT SCP Aux Col. AVG (No Impact=0) 212 Effort (time and cost): Merge Control Effort (time and cost): 1.9  Impact/Effort Ratio 213 Human Welfare: Merge Control Human Welfare: 3.1  2.6 214 Environmental Benefit: Merge Control Environmental Benefit: 0.7  215 Cost Savings: Merge Control Cost Savings: 1.2  216 Impact/Effect Ratio: Impact/Effect Ratio: 2.6  217 Effort (time and cost): Speed Management Effort (time and cost): 1.9  Impact/Effort Ratio 218 Human Welfare: Speed Management Human Welfare: 2.9  2.7 219 Environmental Benefit: Speed Management Environmental Benefit: 1.0  220 Cost Savings: Speed Management Cost Savings: 1.2  221 Impact/Effect Ratio: Impact/Effect Ratio: 2.7  222 Effort (time and cost): Driver Information Systems Effort (time and cost): 2.3  Impact/Effort Ratio 223 Human Welfare: Driver Information Systems Human Welfare: 3.4  2.4 224 Environmental Benefit: Driver Information Systems Environmental Benefit: 0.9  225 Cost Savings: Driver Information Systems Cost Savings: 1.1  226 Impact/Effect Ratio: Impact/Effect Ratio: 2.4  227 Effort (time and cost): Oversized Load DetectionTechnology Effort (time and cost): 1.6  Impact/Effort Ratio 228 Human Welfare: Oversized Load DetectionTechnology Human Welfare: 1.9  2.3 229 Environmental Benefit: Oversized Load DetectionTechnology Environmental Benefit: 0.5  230 Cost Savings: Oversized Load DetectionTechnology Cost Savings: 1.3  231 Impact/Effect Ratio: Impact/Effect Ratio: 2.3  232 Effort (time and cost): Construction Vehicle Entering/Exiting Effort (time and cost): 1.8  Impact/Effort Ratio 233 Human Welfare: Construction Vehicle Entering/Exiting Human Welfare: 2.2  2.3 234 Environmental Benefit: Construction Vehicle Entering/Exiting Environmental Benefit: 0.6  235 Cost Savings: Construction Vehicle Entering/Exiting Cost Savings: 1.4  236 Impact/Effect Ratio: Impact/Effect Ratio: 2.3  237 Effort (time and cost): Public Outreach Effort (time and cost): 2.3   Impact/Effort Ratio 238 Human Welfare: Public Outreach Human Welfare: 3.7   2.8 239 Environmental Benefit: Public Outreach Environmental Benefit: 1.1   240 Cost Savings: Public Outreach Cost Savings: 1.7   241 Impact/Effect Ratio: Impact/Effect Ratio: 2.8   242 Effort (time and cost): Use of Recycled and Supplementary Materials Effort (time and cost): 2.0  Impact/Effort Ratio 243 Human Welfare: Use of Recycled and Supplementary Materials Human Welfare: 2.2  4.5 244 Environmental Benefit: Use of Recycled and Supplementary Materials Environmental Benefit: 4.2  245 Cost Savings: Use of Recycled and Supplementary Materials Cost Savings: 2.7  246 Impact/Effect Ratio: Impact/Effect Ratio: 4.5 Â
192 ID IMPACT SCP Aux Col. AVG (No Impact=0) 247 Effort (time and cost): Innovative Use of Materials in Construction Effort (time and cost): 2.4   Impact/Effort Ratio 248 Human Welfare: Innovative Use of Materials in Construction Human Welfare: 1.8   3.1 249 Environmental Benefit: Innovative Use of Materials in Construction Environmental Benefit: 3.4   250 Cost Savings: Innovative Use of Materials in Construction Cost Savings: 2.2   251 Impact/Effect Ratio: Impact/Effect Ratio: 3.1   252 Effort (time and cost): Environmental Product Declarations (EPDs) Effort (time and cost): 2.8  Impact/Effort Ratio 253 Human Welfare: Environmental Product Declarations (EPDs) Human Welfare: 1.9  2.0 254 Environmental Benefit: Environmental Product Declarations (EPDs) Environmental Benefit: 2.8  255 Cost Savings: Environmental Product Declarations (EPDs) Cost Savings: 0.7  256 Impact/Effect Ratio: Impact/Effect Ratio: 2.0  257 Effort (time and cost): Sustainable Construction Safety and Health Rating System (SCSH) Effort (time and cost): 2.6  Impact/Effort Ratio 258 Human Welfare: Sustainable Construction Safety and Health Rating System (SCSH) Human Welfare: 3.1  1.9 259 Environmental Benefit: Sustainable Construction Safety and Health Rating System (SCSH) Environmental Benefit: 0.8  260 Cost Savings: Sustainable Construction Safety and Health Rating System (SCSH) Cost Savings: 1.0  261 Impact/Effect Ratio: Impact/Effect Ratio: 1.9  262 Effort (time and cost): Automated Flagger Assistance Devices (AFAD) Effort (time and cost): 1.7  Impact/Effort Ratio 263 Human Welfare: Automated Flagger Assistance Devices (AFAD) Human Welfare: 3.1  2.7 264 Environmental Benefit: Automated Flagger Assistance Devices (AFAD) Environmental Benefit: 0.2  265 Cost Savings: Automated Flagger Assistance Devices (AFAD) Cost Savings: 1.5  266 Impact/Effect Ratio: Impact/Effect Ratio: 2.7  267 Effort (time and cost): Work Zone Intrusion Alerting Systems (WZIA) Technology Effort (time and cost): 2.0  Impact/Effort Ratio 268 Human Welfare: Work Zone Intrusion Alerting Systems (WZIA) Technology Human Welfare: 3.3  2.3 269 Environmental Benefit: Work Zone Intrusion Alerting Systems (WZIA) Technology Environmental Benefit: 0.2  270 Cost Savings: Work Zone Intrusion Alerting Systems (WZIA) Technology Cost Savings: 1.2  271 Impact/Effect Ratio: Impact/Effect Ratio: 2.3  272 Effort (time and cost): Unmanned Aerial Vehicle Inspection Effort (time and cost): 2.3  Impact/Effort Ratio 273 Human Welfare: Unmanned Aerial Vehicle Inspection Human Welfare: 2.3  2.1 274 Environmental Benefit: Unmanned Aerial Vehicle Inspection Environmental Benefit: 1.4  275 Cost Savings: Unmanned Aerial Vehicle Inspection Cost Savings: 1.1  276 Impact/Effect Ratio: Impact/Effect Ratio: 2.1  277 Effort (time and cost): DBE, Veteran-Owned Businesses Effort (time and cost): 2.2  Impact/Effort Ratio 278 Human Welfare: DBE, Veteran-Owned Businesses Human Welfare: 2.2  1.1 279 Environmental Benefit: DBE, Veteran-Owned Businesses Environmental Benefit: 0.0  280 Cost Savings: DBE, Veteran-Owned Businesses Cost Savings: 0.2  281 Impact/Effect Ratio: Impact/Effect Ratio: 1.1 Â
193 ID IMPACT SCP Aux Col. AVG (No Impact=0) 282 Effort (time and cost): ARTBA Safety Certification for Transportation Project Professionals Effort (time and cost): 1.9   Impact/Effort Ratio 283 Human Welfare: ARTBA Safety Certification for Transportation Project Professionals Human Welfare: 2.9   2.6 284 Environmental Benefit: ARTBA Safety Certification for Transportation Project Professionals Environmental Benefit: 0.8   285 Cost Savings: ARTBA Safety Certification for Transportation Project Professionals Cost Savings: 1.3   286 Impact/Effect Ratio: Impact/Effect Ratio: 2.6   287 Effort (time and cost): Suicide Prevention Programs Effort (time and cost): 2.1   Impact/Effort Ratio 288 Human Welfare: Suicide Prevention Programs Human Welfare: 3.6   2.3 289 Environmental Benefit: Suicide Prevention Programs Environmental Benefit: 0.1   290 Cost Savings: Suicide Prevention Programs Cost Savings: 1.0   291 Impact/Effect Ratio: Impact/Effect Ratio: 2.3   292 Effort (time and cost): Contractor Communications Effort (time and cost): 2.3  Impact/Effort Ratio 293 Human Welfare: Contractor Communications Human Welfare: 3.8  2.6 294 Environmental Benefit: Contractor Communications Environmental Benefit: 0.8  295 Cost Savings: Contractor Communications Cost Savings: 1.3  296 Impact/Effect Ratio: Impact/Effect Ratio: 2.6  297 Effort (time and cost): Noise Reduction Based on Ecological Impact Effort (time and cost): 2.6  Impact/Effort Ratio 298 Human Welfare: Noise Reduction Based on Ecological Impact Human Welfare: 1.9  2.1 299 Environmental Benefit: Noise Reduction Based on Ecological Impact Environmental Benefit: 3.0  300 Cost Savings: Noise Reduction Based on Ecological Impact Cost Savings: 0.7  301 Impact/Effect Ratio: Impact/Effect Ratio: 2.1  302 Effort (time and cost): Backup Alarm Modifications and Alternatives Effort (time and cost): 1.8  Impact/Effort Ratio 303 Human Welfare: Backup Alarm Modifications and Alternatives Human Welfare: 3.4  3.1 304 Environmental Benefit: Backup Alarm Modifications and Alternatives Environmental Benefit: 1.3  305 Cost Savings: Backup Alarm Modifications and Alternatives Cost Savings: 1.1  306 Impact/Effect Ratio: Impact/Effect Ratio: 3.1  307 Effort (time and cost): Use Computer Models to Predict Construction Noise Effort (time and cost): 2.9  Impact/Effort Ratio 308 Human Welfare: Use Computer Models to Predict Construction Noise Human Welfare: 2.6  1.7 309 Environmental Benefit: Use Computer Models to Predict Construction Noise Environmental Benefit: 1.8  310 Cost Savings: Use Computer Models to Predict Construction Noise Cost Savings: 0.6  311 Impact/Effect Ratio: Impact/Effect Ratio: 1.7  312 Effort (time and cost): Lighting Plan Effort (time and cost): 1.9  Impact/Effort Ratio 313 Human Welfare: Lighting Plan Human Welfare: 3.2  3.2 314 Environmental Benefit: Lighting Plan Environmental Benefit: 1.7  315 Cost Savings: Lighting Plan Cost Savings: 1.2  316 Impact/Effect Ratio: Impact/Effect Ratio: 3.2 Â
194 ID IMPACT SCP Aux Col. AVG (No Impact=0) 317 Effort (time and cost): Work Zone Glare Reduction Effort (time and cost): 2.2  Impact/Effort Ratio 318 Human Welfare: Work Zone Glare Reduction Human Welfare: 3.3  2.6 319 Environmental Benefit: Work Zone Glare Reduction Environmental Benefit: 1.4  320 Cost Savings: Work Zone Glare Reduction Cost Savings: 1.0  321 Impact/Effect Ratio: Impact/Effect Ratio: 2.6  322 Effort (time and cost): Semi-Permanent High-Mast Lighting Effort (time and cost): 2.5  Impact/Effort Ratio 323 Human Welfare: Semi-Permanent High-Mast Lighting Human Welfare: 3.2  2.2 324 Environmental Benefit: Semi-Permanent High-Mast Lighting Environmental Benefit: 1.2  325 Cost Savings: Semi-Permanent High-Mast Lighting Cost Savings: 1.1  326 Impact/Effect Ratio: Impact/Effect Ratio: 2.2  327 Effort (time and cost): Constructability Reviews For Projects Effort (time and cost): 2.4  Impact/Effort Ratio 328 Human Welfare: Constructability Reviews For Projects Human Welfare: 1.8  2.9 329 Environmental Benefit: Constructability Reviews For Projects Environmental Benefit: 2.1  330 Cost Savings: Constructability Reviews For Projects Cost Savings: 3.1  331 Impact/Effect Ratio: Impact/Effect Ratio: 2.9  332 Effort (time and cost): Design for Deconstruction Effort (time and cost): 2.8  Impact/Effort Ratio 333 Human Welfare: Design for Deconstruction Human Welfare: 1.4  2.1 334 Environmental Benefit: Design for Deconstruction Environmental Benefit: 2.5  335 Cost Savings: Design for Deconstruction Cost Savings: 2.0  336 Impact/Effect Ratio: Impact/Effect Ratio: 2.1  337 Effort (time and cost): Adaptive Reuse Effort (time and cost): 3.1  Impact/Effort Ratio 338 Human Welfare: Adaptive Reuse Human Welfare: 2.0  2.5 339 Environmental Benefit: Adaptive Reuse Environmental Benefit: 3.5  340 Cost Savings: Adaptive Reuse Cost Savings: 2.1  341 Impact/Effect Ratio: Impact/Effect Ratio: 2.5  342 Effort (time and cost): Deconstruction Effort (time and cost): 3.2  Impact/Effort Ratio 343 Human Welfare: Deconstruction Human Welfare: 1.9  2.1 344 Environmental Benefit: Deconstruction Environmental Benefit: 2.9  345 Cost Savings: Deconstruction Cost Savings: 1.8  346 Impact/Effect Ratio: Impact/Effect Ratio: 2.1  347 Effort (time and cost): Quality Management Plan Effort (time and cost): 2.2  Impact/Effort Ratio 348 Human Welfare: Quality Management Plan Human Welfare: 1.2  2.4 349 Environmental Benefit: Quality Management Plan Environmental Benefit: 1.8  350 Cost Savings: Quality Management Plan Cost Savings: 2.4  351 Impact/Effect Ratio: Impact/Effect Ratio: 2.4 Â
195 ID IMPACT SCP Aux Col. AVG (No Impact=0) 352 Effort (time and cost): Tier 4 Engines Effort (time and cost): 2.3  Impact/Effort Ratio 353 Human Welfare: Tier 4 Engines Human Welfare: 2.7  3.0 354 Environmental Benefit: Tier 4 Engines Environmental Benefit: 3.2  355 Cost Savings: Tier 4 Engines Cost Savings: 1.0  356 Impact/Effect Ratio: Impact/Effect Ratio: 3.0  357 Effort (time and cost): Alternative Fuels Effort (time and cost): 3.0  Impact/Effort Ratio 358 Human Welfare: Alternative Fuels Human Welfare: 2.6  2.2 359 Environmental Benefit: Alternative Fuels Environmental Benefit: 3.2  360 Cost Savings: Alternative Fuels Cost Savings: 0.9  361 Impact/Effect Ratio: Impact/Effect Ratio: 2.2  362 Effort (time and cost): Reduce Noise Effort (time and cost): 1.5  Impact/Effort Ratio 363 Human Welfare: Reduce Noise Human Welfare: 2.9  3.5 364 Environmental Benefit: Reduce Noise Environmental Benefit: 1.8  365 Cost Savings: Reduce Noise Cost Savings: 0.6  366 Impact/Effect Ratio: Impact/Effect Ratio: 3.5  367 Effort (time and cost): Automated Grade Control Effort (time and cost): 2.0  Impact/Effort Ratio 368 Human Welfare: Automated Grade Control Human Welfare: 0.9  2.3 369 Environmental Benefit: Automated Grade Control Environmental Benefit: 1.6  370 Cost Savings: Automated Grade Control Cost Savings: 2.0  371 Impact/Effect Ratio: Impact/Effect Ratio: 2.3  372 Effort (time and cost): Incorporating Utility Considerations in Highway Design Effort (time and cost): 2.5  Impact/Effort Ratio 373 Human Welfare: Incorporating Utility Considerations in Highway Design Human Welfare: 2.6  3.0 374 Environmental Benefit: Incorporating Utility Considerations in Highway Design Environmental Benefit: 2.5  375 Cost Savings: Incorporating Utility Considerations in Highway Design Cost Savings: 2.3  376 Impact/Effect Ratio: Impact/Effect Ratio: 3.0  377 Effort (time and cost): Limit Site Disturbance Effort (time and cost): 2.0   Impact/Effort Ratio 378 Human Welfare: Limit Site Disturbance Human Welfare: 1.6   3.2 379 Environmental Benefit: Limit Site Disturbance Environmental Benefit: 3.4   380 Cost Savings: Limit Site Disturbance Cost Savings: 1.4   381 Impact/Effect Ratio: Impact/Effect Ratio: 3.2  Â