National Academies Press: OpenBook
« Previous: Foreword
Page 2
Suggested Citation:"CONTENTS." National Academies of Sciences, Engineering, and Medicine. 2020. Buy America Requirements for Federal Highway Projects. Washington, DC: The National Academies Press. doi: 10.17226/25799.
×
Page 2

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

2 NCHRP LRD 80 CONTENTS I. Introduction to FHWA Buy America Provision, 3 A. Scope of Coverage, 3 B. Waivers from Coverage, 3 C. History, 4 D. Digest Overview, 4 II. Application to Steel and Iron in Highway Construction Projects, 5 A. Steel and Iron Products, Not Just Structural Steel, 5 B. Permanently Incorporated Products, Not Temporary Steel, 7 C. Application to “Miscellaneous” Steel or Iron Products, 9 III. Application to Manufactured Products, 13 A. Manufactured Products Waiver, 13 B. Steel or Iron Components of Manufactured Products, 15 C. Predominantly Steel or Iron Manufactured Products, 18 D. Vehicles and Rolling Stock, 19 IV. Waivers and Exceptions, 22 A. Waiver Procedure, 22 B. Application of Waivers, 24 C. Nationwide FHWA Waivers, 29 D. Project-Specific FHWA Waivers, 30 E. National Highway Transportation Safety Administration Waivers, 35 V. Scope of Project Coverage, 36 A. Historically Applied only to FHWA-Funded Segments, 36 B. Expanded to all Contracts in a Project, 38 VI. Relationship to Other Laws, 39 A. State Buy America Statutes, 39 B. Buy American Act, 42 C. Other Federal Buy America Provisions, 42 D. Free Trade Agreements, 44 VII. Enforcement and Penalties, 45 A. Certification, 45 B. Loss of Funding, 47 C. Suspension or Debarment, 47 D. False Claims Liability, 47 VIII. Conclusions, 49

Next: I. INTRODUCTION TO FHWA BUY AMERICA PROVISION »
Buy America Requirements for Federal Highway Projects Get This Book
×
 Buy America Requirements for Federal Highway Projects
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

The Federal Highway Administration's “Buy America Act” requires federally funded highway projects to use only steel, iron, and manufactured products produced in the United States.

The TRB National Cooperative Highway Research Program's NCHRP LRD 80: Buy America Requirements for Federal Highway Projects summarizes the intent and application of the provision. It also summarizes the procedure that FHWA has implemented for granting waivers and the impact that court interpretation of such waivers has had on the industry.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!