National Academies Press: OpenBook

TCRP Annual Report of Progress 2019 (2019)

Chapter: Summary of Project Status

« Previous: Publications of the Transit Cooperative Research Program
Page 50
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 50
Page 51
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 51
Page 52
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 52
Page 53
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 53
Page 54
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 54
Page 55
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 55
Page 56
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 56
Page 57
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 57
Page 58
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 58
Page 59
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 59
Page 60
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 60
Page 61
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 61
Page 62
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 62
Page 63
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 63
Page 64
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 64
Page 65
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 65
Page 66
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 66
Page 67
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 67
Page 68
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 68
Page 69
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 69
Page 70
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 70
Page 71
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 71
Page 72
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 72
Page 73
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 73
Page 74
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 74
Page 75
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 75
Page 76
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 76
Page 77
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 77
Page 78
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 78
Page 79
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 79
Page 80
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 80
Page 81
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 81
Page 82
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 82
Page 83
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 83
Page 84
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 84
Page 85
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 85
Page 86
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 86
Page 87
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 87
Page 88
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 88
Page 89
Suggested Citation:"Summary of Project Status." National Academies of Sciences, Engineering, and Medicine. 2019. TCRP Annual Report of Progress 2019. Washington, DC: The National Academies Press. doi: 10.17226/25898.
×
Page 89

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

50 C on tra ct Am ou nt TA B LE 5 S U M M A RY O F PR O JE CT S TA TU S TH R O U G H D EC EM B ER 3 1, 2 01 9 N o. Ti tle C on tra ct or En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us A : O PE R A TI O N S A- 01 Fa re P ol ic ie s, S tru ct ur es , an d Te ch no lo gi es M ul tis ys te m s 4/ 1/ 19 93 6/ 30 /1 99 7 $4 49 ,9 41 $4 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 0 A- 02 U se r's M an ua l f or As se ss in g Se rv ic e- D el iv er y Sy st em s fo r R ur al Pa ss en ge r T ra ns po rta tio n Ec os om et ric s 5/ 15 /1 99 3 5/ 19 /1 99 5 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 6 A- 03 Ai ds fo r R ai l C ar S id e- D oo r O bs er va tio n Te le ph on ic s C or p 6/ 7/ 19 93 2/ 28 /1 99 5 $1 99 ,7 89 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 4 A- 04 El ec tro ni c O n- Ve hi cl e Pa ss en ge r I nf or m at io n D is pl ay s (V is ua l a nd Au di bl e) M un ic ip al ity o f M et ro po lit an S ea ttl e 3/ 1/ 19 94 3/ 31 /1 99 6 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 5 A- 05 In te gr at io n of L ig ht R ai l Tr an si t i nt o C ity S tre et s Ko rv e En gi ne er in g 3/ 1/ 19 94 2/ 28 /1 99 6 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 7 A- 05 A( 01 ) Se co nd T ra in C om in g W ar ni ng S ig n D em on st ra tio n Pr oj ec t Lo s An ge le s C ou nt y M et ro po lit an T ra ns it Au th or ity 4/ 14 /1 99 7 1/ 31 /2 00 2 $2 00 ,0 00 $2 00 ,0 00 FT A D em on st ra tio n - C om pl et ed - Pu bl is he d as R R D 5 1 A- 05 A( 02 ) Se co nd T ra in C om in g W ar ni ng S ig n D em on st ra tio n Pr oj ec t M as s Tr an si t Ag en cy , B al tim or e, M D 2/ 26 /1 99 7 1/ 31 /2 00 1 $2 00 ,0 00 $2 00 ,0 00 FT A D em on st ra tio n - C om pl et ed - Pu bl is he d as R R D 5 1 A- 06 A H an db oo k fo r A cq ui rin g D em an d- R es po ns iv e Tr an si t S of tw ar e Sy st an 2/ 22 /1 99 4 7/ 20 /1 99 6 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 8 A- 07 O pe ra tio na l A na ly si s of Bu s La ne s on A rte ria ls W ilb ur S m ith A ss oc 5/ 1/ 19 94 6/ 30 /1 99 6 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 2 6 A- 07 A O pe ra tio na l A na ly si s of Bu s La ne s on A rte ria ls : Ap pl ic at io n an d R ef in em en t W ilb ur S m ith A ss oc 6/ 16 /1 99 7 8/ 31 /1 99 9 $7 0, 00 0 $7 0, 00 0 C om pl et ed - Pu bl is he d as R R D 3 8 A- 08 R ai l T ra ns it C ap ac ity Tr an sp or t C on su lt Lt d 3/ 1/ 19 94 10 /3 1/ 19 95 $1 99 ,6 40 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 3

51 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) A- 09 G ui de lin es fo r T ra ns it Fa ci lit y Si gn in g an d G ra ph ic s KR W 4/ 18 /1 99 4 1/ 17 /1 99 6 $2 49 ,9 52 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 2 A- 10 G ui de lin es fo r t he Lo ca tio n an d D es ig n of Bu s St op s Te xa s A& M R es ea rc h Fo un da tio n 11 /1 /1 99 4 7/ 30 /1 99 6 $2 50 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 9 A- 10 A Ev al ua tio n of B us B ul bs Te xa s A& M R es ea rc h Fo un da tio n 2/ 27 /1 99 8 8/ 30 /2 00 0 $1 75 ,0 00 $1 75 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 6 5 an d W eb D oc um en t 1 9 A- 11 Tr an si t S ch ed ul in g: B as ic an d Ad va nc ed M an ua ls Tr an sp or ta tio n M an ag em en t & D es ig n 10 /1 /1 99 4 1/ 15 /1 99 7 $1 99 ,8 46 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 3 0 A- 12 Pa ss en ge r I nf or m at io n Se rv ic es : A G ui de bo ok fo r Tr an si t S ys te m s Te xa s A& M R es ea rc h Fo un da tio n 3/ 1/ 19 96 2/ 28 /1 99 8 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 4 5 A- 13 Li gh t R ai l S er vi ce : Pe de st ria n an d Ve hi cu la r Sa fe ty Ko rv e En gi ne er in g 4/ 23 /1 99 6 11 /3 0/ 20 00 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - In te rim R ep or t Pu bl is he d as R R D 3 4; F in al R ep or t P ub lis he d as R ep or t 69 A- 14 M ul tip ur po se T ra ns it Pa ym en t M ed ia M ul tis ys te m s 1/ 29 /1 99 6 9/ 30 /1 99 7 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 1 6 an d R ep or t 3 2 A- 15 Tr an si t C ap ac ity a nd Q ua lit y of S er vi ce M an ua l: Fi rs t E di tio n Ki tte ls on a nd A ss oc 11 /1 /1 99 6 1/ 31 /1 99 9 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R R D 3 5; W eb D oc um en t 6 ; an d as C R P- C D -2 A- 15 A Tr an si t C ap ac ity a nd Q ua lit y of S er vi ce M an ua l: Se co nd E di tio n Ki tte ls on a nd A ss oc 10 /2 9/ 19 99 9/ 1/ 20 03 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 00 A- 15 B U pd at e of T ra ns it C ha pt er s of H ig hw ay C ap ac ity M an ua l Ki tte ls on a nd A ss oc 9/ 10 /2 00 3 3/ 31 /2 00 4 $2 2, 00 0 $2 2, 00 0 C om pl et ed - Fo rw ar de d to H C M C om m itt ee A- 15 C Tr an si t C ap ac ity a nd Q ua lit y of S er vi ce M an ua l, Th ird E di tio n Ki tte ls on a nd A ss oc 9/ 22 /2 01 0 3/ 15 /2 01 3 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 65

52 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) A- 16 Im pr ov ed T ra ffi c Si gn al Pr io rit y fo r T ra ns it U o f A riz on a 2/ 17 /1 99 7 2/ 28 /1 99 8 $1 05 ,2 70 $1 05 ,2 70 Te rm in at ed A- 16 A Im pr ov ed T ra ffi c Si gn al Pr io rit y fo r T ra ns it G ar de ne r Tr an sp or ta tio n Sy st em s, In c. 6/ 7/ 19 99 11 /3 0/ 20 06 $1 94 ,7 30 $1 94 ,7 30 C om pl et ed - N ot P ub lis he d A- 17 Jo in t O pe ra tio n of L ig ht R ai l T ra ns it or D ie se l M ul tip le U ni t V eh ic le s w ith R ai lro ad s Ed w ar ds a nd K el ce y 10 /7 /1 99 6 9/ 30 /1 99 8 $2 49 ,8 20 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 5 2 A- 17 A Su pp le m en tin g an d U pd at in g TC R P R ep or t 5 2: Jo in t O pe ra tio n of L ig ht R ai l T ra ns it or D ie se l M ul tip le U ni t V eh ic le s w ith R ai lro ad s Ed w ar ds a nd K el ce y 8/ 18 /2 00 0 4/ 18 /2 00 1 $3 9, 99 5 $4 0, 00 0 C om pl et ed - Pu bl is he d as R R D 4 3 A- 18 Ef fe ct iv e Pr ac tic es to R ed uc e Bu s Ac ci de nt s Te ch no lo gy & M an ag em en t Sy st em s 12 /1 /1 99 6 9/ 30 /1 99 9 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 6 6 A- 19 In te gr at in g Sc ho ol B us a nd Pu bl ic T ra ns po rta tio n Se rv ic es in N on -U rb an C om m un iti es M ul tis ys te m s 12 /1 /1 99 6 4/ 21 /1 99 9 $1 99 ,7 51 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 5 6 an d W eb D oc um en t 1 1 A- 19 A( 1) Sc op in g St ud y fo r P ro je ct A- 19 A( 2) M ul tis ys te m s 4/ 1/ 20 01 12 /3 1/ 20 01 $8 ,0 59 $9 ,0 00 C om pl et ed A- 19 A( 2) Ve hi cl e G ui de fo r In te gr at in g N on -U rb an Sc ho ol a nd P ub lic Tr an sp or ta tio n Se rv ic es Te am , I nc . 5/ 1/ 20 02 1/ 30 /2 00 7 $1 63 ,9 86 $1 66 ,0 00 C an ce lle d A- 20 A( 1) St ra te gi es fo r I m pr ov ed Tr av el er In fo rm at io n C ha rle s R iv er A ss oc 6/ 22 /1 99 8 1/ 31 /2 00 2 $9 0, 41 7 $9 0, 41 7 C om pl et ed - R es ul ts to A - 20 A( 2) A- 20 A( 2) St ra te gi es fo r I m pr ov ed Tr av el er In fo rm at io n M ul tis ys te m s, In c. 7/ 1/ 20 02 3/ 3/ 20 03 $5 0, 00 0 $3 59 ,5 83 C om pl et ed - Pu bl is he d as R ep or t 9 2 A- 20 B( 1) Tr ai ni ng fo r N ew Te ch no lo gy Ba tte lle 1/ 4/ 19 99 7/ 6/ 20 00 $1 09 ,1 05 $1 09 ,1 05 Te rm in at ed

53 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) A- 20 B( 2) Tr ai ni ng fo r N ew Te ch no lo gy Kl ei n As so ci at es , I nc . 1/ 3/ 20 01 2/ 15 /2 00 3 $9 0, 89 5 $9 0, 89 5 $5 0, 00 0 C om pl et ed - Pu bl is he d as R ep or t 9 6 A- 21 G ui de bo ok fo r C ha ng e an d In no va tio n at R ur al a nd Sm al l U rb an T ra ns it Sy st em s KF H G ro up 8/ 25 /1 99 9 2/ 24 /2 00 1 $1 48 ,6 62 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 7 0 A- 22 Si m ul at or s an d Bu s Sa fe ty : G ui de lin es fo r A cq ui rin g an d U si ng T ra ns it Bu s O pe ra to r D riv in g Si m ul at or s M ile st on e G ro up 8/ 19 /1 99 9 7/ 30 /2 00 1 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 7 2 A- 23 Im pl em en ta tio n G ui de lin es fo r B us R ap id T ra ns it Sy st em s D an ie l, M an n, Jo hn so n & M en de nh al l ( D M JM ) 5/ 24 /2 00 0 5/ 1/ 20 03 $2 49 ,9 80 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 9 0, V ol um es 1 a nd 2 A- 23 A Bu s R ap id T ra ns it Pr ac tit io ne r's G ui de Ki tte ls on & As so ci at es , I nc . 11 /1 5/ 20 03 9/ 30 /2 00 6 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 18 a nd W eb -O nl y D oc um en t 3 9 A- 24 A To ol ki t f or S el f-S er vi ce , Ba rri er -F re e Fa re C ol le ct io n M ul tis ys te m s 8/ 30 /2 00 0 3/ 1/ 20 02 $2 49 ,9 21 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 8 0 A- 25 Fa re P ol ic ie s, S tru ct ur es an d Te ch no lo gi es : U pd at e M ul tis ys te m s 7/ 1/ 20 01 4/ 15 /2 00 3 $2 49 ,9 39 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 9 4 A- 26 Sm ar t C ar d In te ro pe ra bi lit y Is su es fo r t he T ra ns it In du st ry Ac um en B ui ld in g En te rp ris e 10 /1 5/ 20 03 4/ 30 /2 00 6 $2 49 ,3 23 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 15 A- 27 Sh ar ed U se o f R ai lro ad In fra st ru ct ur e W ith N on - C om pl ia nt P ub lic T ra ns it R ai l V eh ic le s: A Pr ac tit io ne r's G ui de Bo oz -A lle n & H am ilt on 8/ 31 /2 00 5 9/ 30 /2 00 8 $1 98 ,5 64 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 30 A- 28 G ui de bo ok fo r M iti ga tin g Fi xe d- R ou te B us -a nd - Pe de st ria n C ol lis io ns Sc ie nc e Ap pl ic at io ns In te rn at io na l C or po ra tio n 11 /2 /2 00 5 9/ 15 /2 00 7 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 25

54 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) A- 29 C on tro llin g Sy st em C os ts : Ba si c an d Ad va nc ed Sc he du lin g M an ua ls a nd C on te m po ra ry Is su es in Tr an si t S ch ed ul in g D an B oy le & As so ci at es 7/ 31 /2 00 6 3/ 15 /2 00 9 $3 75 ,0 00 $3 75 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 35 a nd W eb -O nl y D oc um en t 4 5 A- 30 Im pr ov in g Pe de st ria n an d M ot or is t S af et y Al on g Li gh t R ai l T ra ns it Al ig nm en ts iT ra ns C on su lti ng , Lt d. 9/ 8/ 20 06 6/ 30 /2 00 9 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 37 a nd W eb -O nl y D oc um en t 4 2 A- 31 Tr an si t, C al l C en te rs , a nd 51 1: A G ui de fo r D ec is io n M ak er s Ba tte lle 12 /1 5/ 20 06 6/ 30 /2 00 9 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 34 A- 32 O pe ra tio n of L ig ht R ai l Tr an si t t hr ou gh U ng at ed C ro ss in gs a t S pe ed s O ve r 35 m ph Sc ie nc e Ap pl ic at io ns In te rn at io na l C or po ra tio n 11 /2 6/ 20 08 12 /3 1/ 20 11 $2 94 ,9 24 $2 95 ,0 00 C om pl et ed - Pu bl is he d as W eb -O nl y D oc um en t 5 3 A- 33 C om m un ic at io n w ith Vu ln er ab le P op ul at io ns : A Tr an sp or ta tio n an d Em er ge nc y M an ag em en t To ol ki t Th e Lo ui s Be rg er G ro up , I nc . 8/ 27 /2 00 9 9/ 26 /2 01 1 $3 49 ,8 88 $3 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 50 A- 33 A U si ng P ic to gr am s to M ak e Tr an si t E as ie r t o N av ig at e fo r C us to m er s w ith C om m un ic at io n Ba rri er s Th e Lo ui s Be rg er G ro up , I nc . 12 /6 /2 01 1 9/ 30 /2 01 2 $9 9, 88 7 $1 00 ,0 00 C om pl et ed - Pu bl is he d as W eb -O nl y D oc um en t 5 9 A- 34 Im pr ov in g Sa fe ty -R el at ed R ul es C om pl ia nc e in th e Pu bl ic T ra ns po rta tio n In du st ry Fo st er -M ille r, In c. 9/ 30 /2 00 9 9/ 1/ 20 11 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 49 A- 35 Im pr ov in g Sa fe ty C ul tu re in Pu bl ic T ra ns po rta tio n Sa m S ch w ar tz En gi ne er in g 12 /1 5/ 20 10 10 /1 /2 01 4 $5 00 ,0 00 $5 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 74

55 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) A- 36 C om m an d- Le ve l D ec is io n M ak in g fo r T ra ns it Em er ge nc y M an ag er s En gi ne er in g & C om pu te r Si m ul at io ns 11 /1 /2 01 0 6/ 30 /2 02 0 S. P ar ke r $6 85 ,5 51 R . L yo ns R . C he n $4 35 ,0 00 $2 25 ,8 29 (N C H R P) $1 55 ,0 00 $2 20 ,0 00 (N C H R P) $3 60 ,0 00 (N C H R P) $5 0, 00 0 (T C R P) In iti al R es ea rc h Pu bl is he d as W eb -O nl y D oc um en t 6 0; Ad di tio na l R es ea rc h in Pr og re ss A- 37 Pa ra tra ns it Em er ge nc y O pe ra tio ns a nd Pr ep ar ed ne ss H an db oo k BC G T ra ns po rta tio n G ro up 11 /4 /2 01 0 6/ 30 /2 01 2 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 60 A- 38 G ui de bo ok o n Pe de st ria n C ro ss in gs o f P ub lic T ra ns it R ai l S er vi ce s Te xa s A& M Tr an sp or ta tio n In st itu te 2/ 1/ 20 13 11 /3 0/ 20 14 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 75 a nd W eb -O nl y D oc um en t 6 3 A- 39 Im pr ov in g Tr an sp or ta tio n N et w or k Ef fic ie nc y Th ro ug h Im pl em en ta tio n of Tr an si t-S up po rti ve R oa dw ay S tra te gi es Ki ttl es on & As so ci at es 1/ 31 /2 01 3 10 /3 1/ 20 15 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 83 a nd W eb -O nl y D oc um en t 6 6 A- 40 M an ua l t o Im pr ov e R ai l Tr an si t S af et y at Pl at fo rm /T ra in a nd Pl at fo rm /G ui de w ay In te rfa ce s O re go n St at e U ni ve rs ity 12 /2 0/ 20 13 5/ 31 /2 01 6 $2 74 ,4 31 P. C en to la nz i $2 75 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 89 A- 41 Im pr ov in g th e R es ilie nc y of Tr an si t S ys te m s Th re at en ed b y N at ur al D is as te rs Lo ui s Be rg er G ro up , In c. 2/ 24 /2 01 5 5/ 31 /2 01 7 $3 49 ,9 61 N . C hu ng A. S ch ild ge $3 50 ,0 00 C om pl et ed - Pu bl is he d as W eb -O nl y D oc um en t 7 0 A- 42 M in ut es M at te r: A G ui de to Bu s Tr an si t S er vi ce R el ia bi lit y Pa rs on s Br in ck er ho ff 1/ 4/ 20 16 12 /3 1/ 20 18 S. P ar ke r $2 50 ,0 00 E. P ap et ti $2 50 ,0 00 C om pl et ed - Pu bl ic at io n Pe nd in g A- 43 R ec en t D ec lin e in P ub lic Tr an sp or ta tio n R id er sh ip : An al ys is , C au se s, R es po ns es G eo rg ia T ec h R es ea rc h C or po ra tio n 1/ 17 /2 01 9 7/ 16 /2 02 0 D . S ch w ag er $4 00 ,0 00 R . B ar tle tt M . B al te s R es ea rc h in P ro gr es s

56 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) A- 44 M iti ga tio n St ra te gi es fo r D et er rin g Tr es pa ss in g on Tr an si t R ai l R ig ht s of W ay 3/ 25 /2 01 9 11 /2 5/ 20 19 M . G ar ci a- C ol be rg $2 50 ,0 00 G . G oo d S. S ch us te r $2 50 ,0 00 R es ea ch in P ro gr es s A- 45 M ea su rin g an d M an ag in g Fa re E va si on S. P ar ke r $1 50 ,0 00 M . K an e $1 50 ,0 00 R es ea rc h in P ro gr es s A- 46 Fe rry T ra ns it O pe ra tio ns an d C ap ac ity G ui de bo ok L. G ol ds te in $0 $1 00 ,0 00 In D ev el op m en t B : SE R VI C E C O N FI G U R A TI O N B- 01 Tr an si t O pe ra tio ns fo r In di vi du al s w ith D is ab ilit ie s EG &G D yn at re nd 6/ 1/ 19 93 3/ 31 /1 99 7 $3 44 ,9 69 $2 00 ,0 00 $1 45 ,0 00 C om pl et ed - Pu bl is he d as R R D 1 , R ep or t 9 , a nd W eb D oc um en t 2 B- 01 A D em on st ra tio n of Pa ra tra ns it/ Fi xe d- R ou te Fe ed er S er vi ce fo r A D A C om pl ia nc e $2 40 ,0 00 $2 40 ,0 00 FT A D em on st ra tio n - C an ce lle d B- 02 A H an db oo k: In te gr at in g M ar ke t R es ea rc h in to Tr an si t M an ag em en t N or th w es t R es ea rc h G ro up 7/ 1/ 19 93 1/ 31 /1 99 6 $3 39 ,3 68 $6 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 3 7 an d W eb D oc um en t 3 B- 03 W or kb oo k fo r E st im at in g D em an d fo r R ur al Pa ss en ge r T ra ns po rta tio n SG A ss oc ia te s, In c. 6/ 1/ 19 93 2/ 28 /1 99 5 $1 99 ,6 85 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 3 B- 04 Tr an sp or ta tio n D em an d M an ag em en t ( TD M ) St ra te gi es C O M SI S C or p 6/ 15 /1 99 3 3/ 31 /1 99 6 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 1 8 an d W eb D oc um en t 22 B- 05 G ui de bo ok fo r A ttr ac tin g Pa ra tra ns it Pa tro ns to Fi xe d- R ou te S er vi ce s Bi on et ic s C or p, Ke tro n D iv is io n 2/ 22 /1 99 4 3/ 21 /1 99 6 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 2 4 B- 06 G ui de lin es fo r E nh an ci ng Su bu rb an M ob ilit y U si ng Pu bl ic T ra ns po rta tio n U rb itr an A ss oc 12 /1 /1 99 4 12 /3 1/ 19 96 $2 74 ,9 93 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 5 5

57 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) B- 07 St ra te gi es to A ss is t L oc al Tr an sp or ta tio n Ag en ci es in Be co m in g M ob ilit y M an ag er s C ra in & A ss oc 10 /3 /1 99 4 8/ 31 /1 99 7 $2 99 ,9 52 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 2 1 B- 08 A G ui de bo ok fo r M ar ke tin g Tr an si t S er vi ce s to Bu si ne ss M ul tis ys te m s 1/ 15 /1 99 6 7/ 31 /1 99 8 $1 49 ,9 85 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 5 1 an d W eb D oc um en t 8 B- 09 A H an db oo k: U si ng M ar ke t Se gm en ta tio n to In cr ea se Tr an si t R id er sh ip N or th w es t R es ea rc h G ro up 5/ 1/ 19 96 5/ 15 /1 99 8 $2 49 ,9 99 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 3 6 B- 10 Th e R ol e of P as se ng er Am en iti es a nd V eh ic le C ha ra ct er is tic s in B ui ld in g Tr an si t R id er sh ip : Am en iti es fo r T ra ns it H an db oo k an d th e Tr an si t D es ig n G am e W or kb oo k Pr oj ec t f or P ub lic Sp ac es 2/ 1/ 19 96 11 /3 0/ 19 98 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 4 6 B- 11 A H an db oo k fo r M ea su rin g C us to m er S at is fa ct io n an d Se rv ic e Q ua lit y M .O .R . P AC E 1/ 2/ 19 96 4/ 15 /1 99 8 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 4 7 B- 12 U pd at in g th e Tr av el er R es po ns e to Tr an sp or ta tio n Sy st em C ha ng es H an db oo k R ic ha rd H . P ra tt C on su lta nt , I nc . 2/ 1/ 19 97 11 /5 /1 99 9 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as W eb D oc um en t 1 2 B- 12 A B- 12 B B- 12 C C on tin ui ng U pd at e of th e Tr av el er R es po ns e to Tr an sp or ta tio n Sy st em s C ha ng es H an db oo k R ic ha rd H . P ra tt As so c 11 /5 /1 99 9 12 /3 1/ 20 12 $3 00 ,0 00 $3 00 ,0 00 $7 5, 00 0 $8 1, 60 0 C om pl et ed - Pu bl is he d as R ep or t 9 5 se rie s B- 13 A H an db oo k of P ro ve n M ar ke tin g St ra te gi es fo r Pu bl ic T ra ns it Te xa s A& M R es ea rc h Fo un da tio n 1/ 6/ 19 97 10 /6 /1 99 8 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 5 0 B- 14 An al yz in g th e C os ts o f O pe ra tin g Sm al l T ra ns it Ve hi cl es KF H G ro up 8/ 1/ 19 97 4/ 6/ 20 00 $1 49 ,5 03 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 6 1

58 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) B- 15 C ha ra ct er is tic s of U rb an Tr av el D em an d C am br id ge Sy st em at ic s 8/ 18 /1 99 7 9/ 30 /2 00 1 $2 49 ,9 98 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 7 3 B- 16 Th e R ol e of th e Pr iv at e- fo r- H ire V eh ic le In du st ry in Pu bl ic T ra ns it N or th C ar ol in a St at e U . 3/ 9/ 19 98 7/ 30 /2 00 1 $2 49 ,9 90 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 7 5 an d C R P- C D -1 6 B- 17 G ui de bo ok fo r S el ec tin g Ap pr op ria te T ec hn ol og y Sy st em s fo r S m al l U rb an an d R ur al P ub lic Tr an sp or ta tio n O pe ra to rs N or th C ar ol in a St at e U . 4/ 20 /1 99 8 7/ 30 /2 00 1 $1 99 ,9 05 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 7 6 an d W eb D oc um en t 2 0 B- 18 Im pr ov in g Pu bl ic Tr an sp or ta tio n Ac ce ss to La rg e Ai rp or ts Le ig h Fi sh er As so ci at es 12 /1 4/ 19 98 6/ 13 /2 00 0 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 6 2 B- 18 A St ra te gi es fo r I m pr ov in g Pu bl ic T ra ns po rta tio n Ac ce ss to L ar ge A irp or ts Le ig h Fi sh er As so ci at es 6/ 20 /2 00 0 5/ 17 /2 00 2 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 8 3 B- 19 Im pr ov in g Pu bl ic T ra ns it O pt io ns fo r O ld er P er so ns W es ta t, In c. 10 /4 /1 99 9 4/ 12 /2 00 2 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 8 2 B- 20 B- 20 A En ha nc in g th e Vi si bi lit y an d Im ag e of T ra ns it in th e U ni te d St at es a nd C an ad a W irt hl in W or ld w id e 7/ 15 /1 99 9 9/ 1/ 20 00 $3 10 ,0 00 $2 50 ,0 00 $6 0, 00 0 C om pl et ed - Pu bl is he d as R ep or t 6 3 B- 21 Ef fe ct iv e Ap pr oa ch es to M ee tin g R ur al In te rc ity B us Tr an sp or ta tio n N ee ds KF H G ro up 9/ 27 /1 99 9 11 /1 6/ 20 01 $9 9, 95 7 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 7 9 B- 22 N ew P ar ad ig m s fo r R ur al an d Sm al l U rb an T ra ns it Se rv ic e D el iv er y U ni ve rs ity o f A riz on a 5/ 31 /2 00 0 3/ 31 /2 00 2 $8 2, 00 0 $8 2, 00 0 C om pl et ed - Se e Pr oj ec t B -2 2A B- 22 A C as e St ud ie s in N ew Pa ra di gm s fo r R ur al a nd Sm al l U rb an T ra ns it Se rv ic e D el iv er y KF H G ro up 6/ 30 /2 00 3 1/ 31 /2 00 4 $1 7, 99 5 $1 8, 00 0 C om pl et ed - Pu bl is he d as R ep or t 9 9 B- 23 R es ou rc e R eq ui re m en ts Fo r D em an d- R es po ns iv e Tr an sp or ta tio n Se rv ic es N or th w es te rn U ni ve rs ity 11 /1 /2 00 0 10 /1 /2 00 3 $2 49 ,9 71 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 9 8

59 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) B- 24 To ol ki t f or R ur al C om m un ity C oo rd in at ed Tr an sp or ta tio n Se rv ic es W es ta t, In c. 8/ 20 /2 00 1 12 /1 5/ 20 03 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 01 B- 25 G ui de bo ok fo r E va lu at in g, Se le ct in g, a nd Im pl em en tin g Su rb ur ba n Tr an si t S er vi ce s U rb itr an A ss oc ia te s, In c. 11 /1 /2 00 3 5/ 1/ 20 06 $2 99 ,9 77 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 16 a nd W eb -O nl y D oc um en t 3 4 B- 26 C ar -S ha rin g: W he re a nd H ow It S uc ce ed s N el so n\ N yg aa rd 10 /1 0/ 20 03 10 /9 /2 00 5 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 08 B- 27 C os t B en ef it An al ys is o f Pr ov id in g N on -E m er ge nc y M ed ic al T ra ns po rta tio n Al ta ru m 12 /3 0/ 20 03 11 /1 /2 00 5 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R R D 7 5 an d W eb -O nl y D oc um en t 2 9 B- 28 Im pr ov in g AD A C om pl em en ta ry Pa ra tra ns it D em an d Es tim at io n N el so n\ N yg aa rd 8/ 24 /2 00 4 3/ 31 /2 00 7 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 19 B- 28 A Im pr ov in g AD A Pa ra tra ns it D em an d Es tim at io n: R eg io na l M od el in g N el so n/ N yg aa rd 5/ 15 /2 00 8 4/ 30 /2 01 2 $3 30 ,0 00 $3 30 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 58 B- 29 Le ve ra gi ng IT S D at a fo r Tr an si t M ar ke t R es ea rc h: A Pr ac tio ne r's G ui de bo ok Po rtl an d St at e U ni ve rs ity 2/ 3/ 20 05 11 /3 0/ 20 07 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 26 B- 30 To ol ki t f or In te gr at in g N on - D ed ic at ed V eh ic le s in Pa ra tra ns it Se rv ic e N el so n\ N yg aa rd 9/ 1/ 20 04 10 /1 /2 00 7 $2 49 ,9 21 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 21 B- 31 G ui de bo ok fo r M ea su rin g, As se ss in g, a nd Im pr ov in g Pe rfo rm an ce o f D em an d- R es po ns e Tr an sp or ta tio n KF H G ro up 9/ 8/ 20 05 9/ 15 /2 00 7 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 24 B- 31 A G ui de bo ok fo r R ur al D em an d- R es po ns e Tr an sp or ta tio n: M ea su rin g, As se ss in g, a nd Im pr ov in g Pe rfo rm an ce KF H G ro up 9/ 30 /2 00 7 8/ 31 /2 00 9 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 36

60 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) B- 32 U nd er st an di ng H ow to M ot iv at e C om m un iti es to Su pp or t a nd R id e Pu bl ic Tr an sp or ta tio n SR BI 9/ 29 /2 00 5 10 /3 0/ 20 07 $3 24 ,5 42 $3 00 ,0 00 $2 5, 00 0 (C U TA ) C om pl et ed - Pu bl is he d as R ep or t 1 22 B- 33 Pr ac tic al M ea su re s to In cr ea se T ra ns it In du st ry Ad ve rti si ng R ev en ue s D en ne en & C om pa ny 3/ 19 /2 00 7 2/ 15 /2 00 9 $2 85 ,0 00 $2 85 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 33 B- 34 R es ou rc e G ui de fo r C om m in gl in g AD A an d N on -A D A Pa ra tra ns it R id er s Tr an Sy st em s, In c. 8/ 30 /2 00 6 9/ 30 /2 01 0 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 43 B- 35 A G ui de fo r P la nn in g an d O pe ra tin g Fl ex ib le P ub lic Tr an sp or ta tio n Se rv ic es D M P G ro up 8/ 16 /2 00 7 3/ 30 /2 01 0 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 40 B- 36 M et ho ds fo r F or ec as tin g D em an d an d Q ua nt ify in g N ee d fo r R ur al P as se ng er Tr an sp or ta tio n: F in al W or kb oo k Va ne ss e H an ge n Br us tli n, In c. 12 /4 /2 00 7 9/ 30 /2 01 2 $5 99 ,1 80 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 61 a nd W eb -O nl y D oc um en t 5 8 B- 37 Es tim at io n of D em an d fo r R ur al In te rc ity B us S er vi ce s KF H G ro up , I nc . 12 /1 1/ 20 07 3/ 31 /2 01 1 $1 99 ,4 11 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 47 B- 38 G ui de lin es fo r P ro vi di ng Ac ce ss to P ub lic Tr an sp or ta tio n St at io ns Ki ttl es on & A ss oc 9/ 17 /2 00 8 10 /1 /2 01 1 $4 89 ,2 88 $5 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 53 ; L ite ra tu re R ev ie w P ub lis he d as W eb - O nl y D oc um en t 4 4 B- 39 Au di en ce M ea su re m en t f or Tr an si t A dv er tis in g Pe op le C ou nt 12 /1 /2 00 9 5/ 1/ 20 12 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - Pu bl is he d as W eb -O nl y D oc um en t 5 7 B- 40 St ra te gy G ui de to E na bl e an d Pr om ot e th e U se o f Fi xe d- R ou te T ra ns it by Pe op le w ith D is ab ilit ie s Tr an Sy st em s 9/ 30 /2 01 1 1/ 30 /2 01 4 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 63 B- 41 Tr av el T ra in in g fo r O ld er Ad ul ts : A H an db oo k W es ta t, In c. 11 /4 /2 01 1 1/ 31 /2 01 4 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 68 , P ar ts I an d II

61 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) B- 42 C om m un ity T oo ls to Im pr ov e Tr an sp or ta tio n O pt io ns fo r V et er an s, M ilit ar y Se rv ic e M em be rs , an d Th ei r F am ilie s KF H G ro up 4/ 13 /2 01 2 2/ 1/ 20 14 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 64 B- 43 U se o f W eb -B as ed R id er Fe ed ba ck to Im pr ov e Pu bl ic T ra ns it Se rv ic es G eo rg ia T ec h R es ea rc h C or po ra tio n 1/ 11 /2 01 3 4/ 1/ 20 15 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 79 B- 44 Im pa ct o f t he T re nd To w ar d Se pa ra te St at ew id e M ed ic ai d Tr an sp or ta tio n Br ok er ag es on H um an S er vi ce Tr an sp or ta tio n Te xa s A& M Tr an sp or ta tio n In st itu te 1/ 10 /2 01 4 3/ 31 /2 01 8 $3 00 ,0 00 R . O ps te lte n $3 00 ,0 00 C om pl et ed - Pu bl is he d as TC R P R ep or t 2 02 B- 45 Tr an sp or ta tio n to D ia ly si s C en te rs : H ea lth /T ra ns po rta tio n Po lic y In te rs ec tio n KF H G ro up , I nc . 12 /3 /2 01 6 10 /3 0/ 20 18 D . S ch w ag er $3 50 ,0 00 D . N el so n $3 50 ,0 00 C om pl et ed - Pu bl is he d as TC R P R ep or t 2 03 B- 46 Ta ct ile W al ki ng S ur fa ce In di ca to rs to A id W ay fin di ng fo r V is ua lly Im pa ire d Tr av el er s in M ul tim od al T ra ve l U ni ve rs ity o f N or th C ar ol in a - C ha pe l H ill 2/ 26 /2 01 9 8/ 25 /2 02 1 S. P ar ke r P Bu tle r L. L itt le $2 15 ,7 40 $3 84 ,2 60 (N C H R P) R es ea rc h in P ro gr es s B- 47 Im pa ct o f T ra ns fo rm at io na l Te ch no lo gi es o n U nd er se rv ed P op ul at io ns S. P ar ke r $6 50 ,0 00 B. G ra ve s M . V el tri $2 50 ,0 00 $4 50 ,0 00 (N C H R P) R es ea rc h in P ro gr es s B- 48 As se ss m en t o f T ra ns it Ag en cy -S po ns or ed Al te rn at iv e Se rv ic es O ffe re d to A D A Pa ra tra ns it C us to m er s: T he In te rs ec tio n of R eg ul at io n an d Pr og ra m O bj ec tiv es M . G ar ci a- C ol be rg $0 $3 50 ,0 00 In D ev el op m en t B- 49 D es ig n G ui de fo r R ur al D ev ia te d Fi xe d R ou te T ra ns it Sy st em s D . S ch w ag er $0 $1 00 ,0 00 In D ev el op m en t

62 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) C : EN G IN EE R IN G O F VE H IC LE S A N D E Q U IP M EN T C -0 1 Pe rs on al M ob ilit y Ai d Se cu re m en t a nd Pa ss en ge r R es tra in t o n Tr an si t V eh ic le s C le ve la nd C lin ic Fo un da tio n 7/ 15 /1 99 3 1/ 13 /1 99 6 $2 99 ,9 71 $3 00 ,0 00 C om pl et ed - N ot P ub lis he d C -0 2 Ap pl ic ab ilit y of L ow -F lo or Li gh t R ai l V eh ic le s in N or th Am er ic a Bo oz -A lle n & H am ilt on 6/ 8/ 19 93 1/ 31 /1 99 5 $1 98 ,4 97 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 2 C -0 3 W he el /R ai l N oi se C on tro l M an ua l W ils on , I hr ig & A ss oc 3/ 1/ 19 94 10 /1 5/ 19 96 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 1 9 an d R ep or t 2 3 C -0 3A W he el a nd R ai l V ib ra tio n Ab so rb er T es tin g an d D em on st ra tio n W ils on , I hr ig & A ss oc 9/ 1/ 19 97 10 /3 1/ 20 00 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 6 7 C -0 4 Pr oc ur em en t S pe ci fic at io n G ui de lin es fo r M as s Tr an si t V eh ic le W in do w s G la zi ng U o f D ay to n 9/ 26 /1 99 4 3/ 25 /1 99 6 $1 99 ,8 75 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 9 a nd R ep or t 1 5 C -0 5 Im pa ct o f R ad io F re qu en cy R ef ar m in g on T ra ns it C om m un ic at io ns Ar th ur D L itt le 9/ 26 /1 99 4 12 /3 1/ 19 95 $1 42 ,1 51 $1 25 ,0 00 $1 7, 15 1 C om pl et ed - Pu bl is he d as R ep or t 1 1 C -0 6 Im pr ov ed M et ho ds fo r In cr ea si ng W he el /R ai l Ad he si on in th e Pr es en ce of N at ur al C on ta m in an ts Tr an er gy C or p 12 /1 /1 99 4 8/ 15 /1 99 6 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R R D 1 7 C -0 6A D em on st ra tio n of Im pr ov ed M et ho ds fo r I nc re as in g W he el /R ai l A dh es io n in th e Pr es en ce o f N at ur al C on ta m in an ts Vi nc en t T er ril l 11 /1 /1 99 7 6/ 30 /1 99 8 $1 8, 82 0 $2 62 ,0 00 Sc op in g St ud y C om pl et ed . D em on st ra tio n Pr oj ec t C an ce lle d. C -0 7 Te ch no lo gy A ss es sm en t o f R ef ue lin g- C on ne ct io n D ev ic es fo r C N G , L N G , an d Pr op an e SA IC 3/ 15 /1 99 6 9/ 14 /1 99 7 $1 49 ,9 89 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R R D 2 5

63 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) C -0 8 Ev al ua tin g Fu el C ho ic es fo r T ra ns it Bu s O pe ra tio ns AR C AD IS G er ag ht y & M ille r, In c. 4/ 1/ 19 96 3/ 15 /1 99 8 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 3 8 C -0 9 Pa ra tra ns it Ve hi cl e Sp ec ifi ca tio ns a nd R el at ed Sp ec ia l M ai nt en an ce R eq ui re m en ts Bi on et ic s C or p, Ke tro n D iv is io n 2/ 1/ 19 96 10 /3 1/ 19 99 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pa ra SP EC So ftw ar e D ev el op ed C -1 0A U nd er st an di ng a nd Ap pl yi ng A dv an ce d O n- Bo ar d Bu s El ec tro ni cs Jo hn J . S ch ia vo ne , Te ch ni ca l & C or po ra te C om m un ic at io ns 6/ 16 /1 99 7 10 /1 5/ 19 98 $1 70 ,0 00 $1 70 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 4 3 C -1 0B H yb rid E le ct ric T ra ns it Bu se s: S ta tu s, B en ef its , an d Is su es N or th ea st A lte rn at iv e Ve hi cl e C on so rti um 6/ 15 /1 99 9 2/ 15 /2 00 0 $4 4, 58 5 $4 5, 00 0 C om pl et ed - Pu bl is he d as R ep or t 5 9 C -1 0C N ew D es ig ns a nd O pe ra tin g Ex pe rie nc es w ith L ow -F lo or T ra ns it Bu se s R ol la nd K in g 7/ 1/ 19 97 4/ 30 /1 99 8 $3 5, 00 0 $3 5, 00 0 C om pl et ed - Pu bl is he d as R ep or t 4 1 C -1 1 Al te rn at iv e- Fu el T ra ns it Bu s H az ar d As se ss m en t M od el SA IC 12 /1 /1 99 7 12 /3 1/ 20 00 $2 99 ,9 21 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 3 9 an d C R P- C D -4 C -1 2 St an da rd T ec hn ic al Sp ec ifi ca tio ns fo r 3 5/ 40 - Fo ot L ow -F lo or a nd C N G Tr an si t B us es Am er ic an P ub lic Tr an sp or ta tio n As so ci at io n 9/ 1/ 19 98 6/ 30 /2 00 1 $2 69 ,0 00 $2 69 ,0 00 C om pl et ed - Sp ec ifi ca tio ns pu bl is he d by A PT A C -1 3 30 -F oo t T ra ns it Bu s Te ch ni ca l S pe ci fic at io n Am er ic an P ub lic Tr an sp or ta tio n As so ci at io n 9/ 14 /2 00 0 6/ 30 /2 00 2 $9 2, 00 0 $9 2, 00 0 C om pl et ed - Sp ec ifi ca tio ns pu bl is he d by A PT A C -1 4 Te ch ni ca l A ss is ta nc e fo r D ev el op m en t o f T ra ns it Bu s St an da rd s Am er ic an P ub lic Tr an sp or ta tio n As so ci at io n 10 /1 /2 00 1 9/ 30 /2 00 8 $1 ,2 75 ,0 00 $1 25 ,0 00 (0 1) $2 50 ,0 00 (0 2) $2 50 ,0 00 (0 3) $2 50 ,0 00 (0 4) $2 50 ,0 00 (0 5) $1 50 ,0 00 (0 6) C om pl et ed - St an da rd s pu bl is he d by A PT A

64 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) C -1 5 As se ss m en t o f H yb rid - El ec tri c Tr an si t B us Te ch no lo gy W es t V irg in ia U ni ve rs ity 12 /2 0/ 20 04 7/ 31 /2 00 9 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 32 C -1 6 C en te r T ru ck P er fo rm an ce of L ow -F lo or L ig ht R ai l Ve hi cl es In te rfl ee t Te ch no lo gy , I nc . 10 /1 9/ 20 04 4/ 18 /2 00 6 $2 49 ,1 70 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 14 C -1 7 D ev el op m en t o f C ra sh En er gy M an ag em en t Pe rfo rm an ce R eq ui re m en ts fo r L ig ht - R ai l V eh ic le s Ap pl ie d R es ea rc h As so ci at es , I nc . 9/ 22 /2 00 5 3/ 31 /2 00 8 $2 99 ,9 90 $3 00 ,0 00 C om pl et ed - Pu bl is he d as W eb -O nl y D oc um en t 4 0 C -1 8 St ra te gi c Pl an fo r M ee tin g Tr an si t I nd us try W ire le ss C om m un ic at io n N ee ds Sc ie nc e Ap pl ic at io ns In te rn at io na l C or p. 10 /2 2/ 20 08 10 /3 1/ 20 12 $2 72 ,9 72 $2 25 ,0 00 $ 4 8, 00 0 $ 5 0, 00 0 C om pl et ed - R es ou rc es to AP TA C -1 9 G ui de bo ok fo r E va lu at in g Fu el C ho ic es fo r P os t-2 01 0 Tr an si t B us P ro cu re m en ts Sc ie nc e Ap pl ic at io ns In te rn at io na l C or po ra tio n 11 /1 5/ 20 07 12 /3 1/ 20 10 $3 00 ,0 00 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 46 C -2 0 U se o f M ob ilit y D ev ic es o n Pa ra tra ns it Ve hi cl es a nd Bu se s O re go n St at e U ni ve rs ity 11 /4 /2 01 1 12 /3 1/ 20 13 $3 99 ,1 57 $4 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 71 C -2 1 Po si tiv e Tr ai n C on tro l (P TC ) R ad io S pe ct ru m Pl an ni ng fo r P as se ng er C om m ut er R ai l O pe ra to rs in th e U ni te d St at es C an ce lle d C -2 2 Bu s O pe ra to r W or ks ta tio n D es ig n fo r I m pr ov in g O cc up at io na l H ea lth a nd Sa fe ty Vi rg in ia T ec h 1/ 15 /2 01 4 3/ 1/ 20 16 $2 75 ,0 00 $2 75 ,0 00 C om pl et ed - Pu bl is he d as TC R P R ep or t 1 85 C -2 3 As se ss in g an d M iti ga tin g El ec tri ca l F ire s on T ra ns it Ve hi cl es TR C E ng in ee rin g Se rv ic es 1/ 5/ 20 17 12 /3 1/ 20 19 S. P ar ke r $3 00 ,0 00 E. M ad is on $1 50 ,0 00 $1 50 ,0 00 R es ea rc h in P ro gr es s C -2 4 Tr ac tio n Po w er C ab le s: R ep la ce m en t G ui de lin es Ea st er n M ic hi ga n U ni ve rs ity 4/ 15 /2 01 9 10 /1 5/ 20 20 S. P ar ke r $2 50 ,0 00 M . S m ith $2 50 ,0 00 R es ea rc h in P ro gr es s

65 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) C -2 5 Bu s D riv er S ec ur ity B ar rie r D es ig n – Th e C ha lle ng es a nd So lu tio ns S. P ar ke r $0 $3 50 ,0 00 In D ev el op m en t D : EN G IN EE R IN G O F FI XE D F A C IL IT IE S D -0 1 R ai l C or ru ga tio n M iti ga tio n in T ra ns it As so c of A m er ic an R ai lro ad s 8/ 22 /1 99 4 11 /3 0/ 19 97 $2 70 ,0 00 $5 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 2 6 D -0 2 D er ai lm en t o f T ra ns it Ve hi cl es in S pe ci al Tr ac kw or k Ze ta -T ec h As so c 4/ 1/ 19 94 6/ 30 /1 99 6 $3 99 ,9 56 $4 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 1 5 D -0 3 Tu nn el T ra ck R ec on st ru ct io n M et ho ds U si ng P re ca st C on cr et e Sy st em s Lo ui s Be rg er & A ss oc 6/ 1/ 19 94 12 /3 1/ 19 94 $3 0, 89 5 $4 50 ,0 00 Te rm in at ed D -0 3A Tu nn el T ra ck R ec on st ru ct io n M et ho ds U si ng P re ca st C on cr et e Sy st em s Th om as D ye r 9/ 1/ 19 95 12 /3 1/ 19 96 $3 9, 92 1 $3 9, 92 1 C om pl et ed - N ot P ub lis he d D -0 4 R ed uc in g th e Vi su al Im pa ct o f O ve rh ea d C on ta ct S ys te m s U rb itr an A ss oc 12 /1 5/ 19 93 5/ 31 /1 99 5 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 7 D -0 5 Pe rfo rm an ce o f D ire ct - Fi xa tio n Tr ac k St ru ct ur e: D es ig n G ui de lin es a nd So ftw ar e Ba tte lle M em or ia l I ns t 2/ 23 /1 99 5 6/ 22 /1 99 9 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as C R P- C D -3 D -0 6 Tr ac k D es ig n H an db oo k fo r L ig ht R ai l T ra ns it Pa rs on s Br in ck er ho ff, Q ua de , & D ou gl as 1/ 2/ 19 96 8/ 30 /1 99 9 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 5 7

66 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) D -0 7 Jo in t R ai l-R el at ed R es ea rc h w ith th e As so ci at io n of A m er ic an R ai lro ad s/ TT C I Tr an sp or ta tio n Te ch no lo gy C en te r, In c. 10 /2 8/ 19 99 12 /3 1/ 20 18 S. P ar ke r $1 ,7 76 ,8 96 T. W illi am s $2 50 ,0 00 (9 9) $2 00 ,0 00 (0 0) $1 50 ,0 00 (0 2) $1 50 ,0 00 (0 3) $ 5 0, 00 0 (0 4) $1 50 ,0 00 (0 5) $1 50 ,0 00 (0 7) $2 00 ,0 00 (0 9) $4 76 ,8 96 (1 1) $2 50 ,0 00 (1 5) C on tin ui ng P ro je ct - Se e D -7 Ta bl e D -0 8 Im pr ov in g Pe de st ria n Sa fe ty a t U ns ig na liz ed R oa dw ay C ro ss in gs Te xa s Tr an sp or ta tio n In st itu te 10 /1 /2 00 2 3/ 6/ 20 06 $5 50 ,0 00 $2 75 ,0 00 (T C R P) $2 75 ,0 00 (N C H R P) C om pl et ed - Pu bl is he d as R ep or t 1 12 a nd W eb -O nl y D oc um en t 3 0 D -0 9 Tr an si t V eh ic le s an d Fa ci lit ie s on S tre et s an d H ig hw ay s Pa rs on s Br in ck er ho ff, Q ua de , & D ou gl as 11 /1 /2 00 2 6/ 30 /2 00 7 $3 49 ,9 69 $3 50 ,0 00 C om pl et ed - Pu bl is he d by AA SH TO D -1 0 Au di bl e Si gn al s fo r Pe de st ria n Sa fe ty in L ig ht R ai l T ra ns it En vi ro nm en ts Ko rv e En gi ne er in g 10 /3 /2 00 3 1/ 31 /2 00 7 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 8 4 an d W eb -O nl y D oc um en t 3 5 D -1 1 D es ig n, O pe ra tio n, a nd Sa fe ty o f A t-G ra de C ro ss in gs o f E xc lu si ve Bu sw ay s BM I - S G 9/ 29 /2 00 4 2/ 15 /2 00 7 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 17 a nd W eb -O nl y D oc um en t 3 6 D -1 2 G ro un d- Bo rn e N oi se a nd Vi br at io n in B ui ld in gs C au se d by R ai l T ra ns it Ac en te ch , I nc . 9/ 16 /2 00 5 12 /3 1/ 20 09 $4 24 ,8 67 $4 25 ,0 00 C om pl et ed - Pu bl is he d as W eb -O nl y D oc um en t 4 8 D -1 3 A G ui de fo r I m pl em en tin g Bu s- on -S ho ul de r ( BO S) Sy st em s W ilb ur S m ith As so ci at es , I nc . 9/ 15 /2 00 6 4/ 30 /2 01 1 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 51 D -1 4 Tr ac k D es ig n H an db oo k fo r L ig ht R ai l T ra ns it, Se co nd E di tio n PB A m er ic as , I nc . 9/ 24 /2 00 9 11 /3 0/ 20 11 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 55

67 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) D -1 5 Ef fe ct iv e Pr ac tic es fo r t he Pr ot ec tio n of Tr an sp or ta tio n In fra st ru ct ur e fro m C yb er In ci de nt s C ou nt er m ea su re s As se ss m en t a nd Se cu rit y Ex pe rts , L LC 5/ 2/ 20 13 12 /3 1/ 20 15 $3 00 ,0 00 $1 50 ,0 00 (T C R P) $1 50 ,0 00 (N C H R P) C om pl et ed - Pu bl is he d as W eb -O nl y D oc um en t 6 7 D -1 6 Im pr ov in g th e Sa fe ty a nd Su st ai na bi lit y of S tra y C ur re nt C on tro l o f D C - Po w er ed R ai l T ra ns it Sy st em s C or rp ro C om pa ni es , In c. 2/ 16 /2 01 2 8/ 31 /2 01 8 S. P ar ke r $3 49 ,9 21 R . C he n $3 50 ,0 00 C om pl et ed - Pu bl ic at io n Pe nd in g D -1 7 D et ec tin g an d M iti ga tin g Lo w -L ev el D C L ea ka ge an d Fa ul t C ur re nt s in Tr an si t U ni ve rs ity o f A kr on 10 /2 4/ 20 14 9/ 30 /2 01 7 S. P ar ke r $2 50 ,0 00 T. W illi am s $2 50 ,0 00 C om pl et ed - Pu bl ic at io n Pe nd in g D -1 8 A Tr an si t A ge nc y G ui de to Ev al ua tin g Se co nd ar y Tr ai n D et ec tio n/ Pr ot ec tio n Sy st em s in C om m un ic at io ns -B as ed Tr ai n C on tro l ( C BT C ) Sy st em s C H 2M H ill 2/ 5/ 20 16 7/ 3/ 20 17 $1 97 ,6 24 P. C en to la nz i $2 00 ,0 00 C om pl et ed - Pu bl is he d as W eb -O nl y D oc um en t 7 1 D -1 9 Ph as e II TC R P Pr oj ec t D - 17 - D et ec tin g an d m iti ga tin g lo w le ve l d c fa ul t c ur re nt s in tr an si t s ys te m s th us el im in at in g el ec tri ca l f ire s in tu nn el s an d rig ht s- of -w ay S. P ar ke r $0 $2 50 ,0 00 In D ev el op m en t E : M A IN TE N A N C E E- 01 Le ve ra gi ng In fo rm at io n fo r Be tte r T ra ns it M ai nt en an ce R AN D C or p 9/ 1/ 19 93 11 /3 0/ 19 95 $3 49 ,8 90 $3 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R R D 1 3 E- 02 Ar tif ic ia l I nt el lig en ce Te ch no lo gy fo r T ra ns it R ai lc ar D ia gn os tic s AN ST EC 5/ 17 /1 99 3 6/ 16 /1 99 4 $1 49 ,5 97 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1

68 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) E- 02 A D em on st ra tio n of A rti fic ia l In te llig en ce T ec hn ol og y fo r R ai lc ar D ia gn os tic s AN ST EC 2/ 27 /1 99 7 10 /3 1/ 19 98 $1 99 ,9 47 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 4 4 E- 03 A D es k G ui de fo r I nv en to ry M an ag er s in th e Tr an si t In du st ry Kl ic k, K en t, & Al le n, In c. 12 /1 /1 99 3 7/ 31 /1 99 5 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R R D 2 8 an d W eb D oc um en t 4 E- 03 A R ev is ed In ve nt or y M an ag em en t D es k G ui de D ra yc ot t C on su lti ng 10 /1 /1 99 7 3/ 31 /2 00 0 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R R D 4 0 an d W eb D oc um en t 17 E- 04 G ui de lin es fo r t he D ev el op m en t o f P ub lic Tr an sp or ta tio n Fa ci lit ie s an d Eq ui pm en t M an ag em en t S ys te m s Pa rs on s Br in ck er ho ff, Q ua de , & D ou gl as 6/ 10 /1 99 4 9/ 30 /1 99 5 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 5 E- 05 G ui de bo ok fo r D ev el op in g an d Sh ar in g Tr an si t B us M ai nt en an ce P ra ct ic es Tr an si t R es ou rc e C en te r 9/ 26 /2 00 3 7/ 15 /2 00 5 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 09 E- 06 Tr an si t B us M ec ha ni cs : Bu ild in g fo r S uc ce ss - Th e AS E Tr an si t B us M ai nt en an ce C er tif ic at io n Te st S er ie s N at io na l I ns tit ut e fo r Au to m ot iv e Se rv ic e Ex ce lle nc e (A SE ) 8/ 1/ 20 04 6/ 30 /2 01 2 $8 45 ,6 08 $4 50 ,0 00 (0 4) $3 00 ,0 00 (0 5) $3 00 ,0 00 (0 7) $2 75 ,0 00 (0 8) C om pl et ed - 8 AS E Tr an si t Bu s Te st s N ow O ffe re d E- 07 Es ta bl is hi ng a N at io na l Tr an si t I nd us try R ai l Ve hi cl e Te ch ni ci an Q ua lif ic at io n Pr og ra m : Bu ild in g fo r S uc ce ss Tr an sp or ta tio n Le ar ni ng C en te r 7/ 18 /2 00 8 3/ 1/ 20 14 $1 ,9 00 ,0 00 $4 00 ,0 00 (0 8) $4 00 ,0 00 (0 9) $4 00 ,0 00 (1 0) $2 00 ,0 00 (1 1) $5 00 ,0 00 (1 2) C om pl et ed - Pu bl is he d as R ep or t 1 70 E- 08 Ex te nd in g an d D ee pe ni ng N at io na l T ra ns it Tr ai ni ng St an da rd s Tr an sp or ta tio n Le ar ni ng C en te r (T LC ) 7/ 14 /2 00 8 10 /1 3/ 20 09 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - R es ul ts U se d by TL C

69 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) E- 09 St at e of G oo d R ep ai r: Pr io rit iz in g th e R eh ab ilit at io n an d R ep la ce m en t o f E xi st in g C ap ita l A ss et s an d Ev al ua tin g th e Im pl ic at io ns fo r T ra ns it Sp y Po nd P ar tn er s 10 /6 /2 01 0 3/ 31 /2 01 2 $1 50 ,0 00 $1 50 ,0 00 (1 0) C om pl et ed - Pu bl is he d as R ep or t 1 57 E- 09 A G ui da nc e fo r D ev el op in g a Tr an si t A ss et M an ag em en t Pl an Sp y Po nd P ar tn er s 9/ 25 /2 01 2 6/ 30 /2 01 4 $3 50 ,0 00 $3 50 ,0 00 (1 2) C om pl et ed - Pu bl is he d as R ep or t 1 72 E- 10 M ai nt en an ce T ec hn ic ia n St af fin g Le ve ls fo r M od er n Pu bl ic T ra ns it Fl ee ts ED SI C on su lti ng 1/ 23 /2 01 3 7/ 30 /2 01 5 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 84 E- 11 Th e R el at io ns hi p Be tw ee n Tr an si t A ss et C on di tio n an d Se rv ic e Q ua lit y Sp y Po nd P ar tn er s 11 /5 /2 01 5 3/ 30 /2 01 8 $3 50 ,0 00 M . S ch illi ng M . S m ith $3 50 ,0 00 C om pl et ed - Pu bl is he d as TC R P R ep or t 1 98 E- 12 G ui da nc e fo r C al cu la tin g th e R et ur n on In ve st m en t in T ra ns it St at e of G oo d R ep ai r Sp y Po nd P ar tn er s 10 /2 1/ 20 16 10 /2 0/ 20 18 D . S ch w ag er $3 00 ,0 00 E. H u $3 00 ,0 00 C om pl et ed - Pu bl is he d as TC R P R es ea rc h R ep or t 2 06 F : H U M A N R ES O U R C ES F- 01 Fi tn es s- fo r-D ut y Te st in g in th e Tr an si t W or kp la ce Ba tte lle M em or ia l I ns t 6/ 1/ 19 93 10 /3 1/ 19 96 $4 74 ,3 50 $3 00 ,0 00 $5 00 ,0 00 C om pl et ed - N ot P ub lis he d F- 02 In no va tiv e La bo r- M an ag em en t P ra ct ic es M er ce r M an ag em en t C on su lt 7/ 15 /1 99 3 10 /3 1/ 19 94 $1 99 ,9 35 $2 50 ,0 00 C om pl et ed - N ot P ub lis he d F- 03 A Q ua lit y Jo ur ne y: A T Q M R oa dm ap fo r P ub lic Tr an sp or ta tio n M ac D or m an & A ss oc 5/ 10 /1 99 3 11 /1 0/ 19 95 $5 00 ,0 00 $5 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 3 a nd R ep or t 8 F- 04 Bu s O pe ra to r W or ks ta tio n Ev al ua tio n an d D es ig n G ui de lin es Pe nn S ta te U 5/ 1/ 19 94 2/ 28 /1 99 7 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 2 5 an d W eb D oc um en t 1

70 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) F- 05 C lo si ng th e Kn ow le dg e G ap fo r T ra ns it Ve hi cl e M ai nt en an ce E m pl oy ee s- - A Sy st em s Ap pr oa ch R AN D C or p 10 /1 0/ 19 94 9/ 9/ 19 96 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 2 9 F- 06 G ui de lin es fo r t he E ffe ct iv e U se o f U ni fo rm ed T ra ns it Po lic e/ Se cu rit y Pe rs on ne l In te ra ct iv e El em en ts 12 /1 2/ 19 94 5/ 29 /1 99 7 $3 99 ,4 90 $4 00 ,0 00 C om pl et ed - Pu bl is he d as W eb D oc um en t 1 5 F- 06 A G ui de lin es fo r C ol le ct in g, An al yz in g, a nd R ep or tin g Tr an si t C rim e D at a Te ch no lo gy & M an ag em en t Sy st em s, In c. 4/ 1/ 19 98 3/ 31 /2 00 0 $1 50 ,0 00 $1 75 ,0 00 C om pl et ed - Pu bl is he d as R R D 4 1 F- 07 Pa rt- Ti m e Tr an si t O pe ra to rs : T he T re nd s an d Im pa ct s C ha rle s R iv er A ss oc 10 /1 5/ 19 97 10 /3 1/ 20 00 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 6 8 F- 09 M an ag in g Tr an si t's W or kf or ce in th e N ew M ille nn iu m M cG lo th in D av is , I nc . 2/ 1/ 20 00 1/ 30 /2 00 2 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 7 7 F- 10 To ol bo x fo r T ra ns it O pe ra to r F at ig ue Fo st er -M ille r, In c. 10 /1 5/ 20 00 6/ 30 /2 00 2 $2 99 ,8 28 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 8 1 F- 11 Po si tio ni ng th e Pu bl ic Tr an sp or ta tio n O pe ra tin g Ag en cy a s an E m pl oy er o f C ho ic e W at so n W ya tt W or ld w id e 9/ 12 /2 00 2 10 /1 5/ 20 03 $2 99 ,7 05 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 03 F- 12 Em pl oy ee C om pe ns at io n G ui de lin es fo r T ra ns it Pr ov id er s in R ur al a nd Sm al l U rb an A re as KF H G ro up 9/ 27 /2 00 5 3/ 3/ 20 08 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 27 F- 13 Ve hi cl e O pe ra to r R ec ru itm en t, R et en tio n an d Pe rfo rm an ce in A D A C om pl em en ta ry Pa ra tra ns it O pe ra tio ns Tr an Sy st em s 9/ 4/ 20 07 1/ 30 /2 01 0 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 42

71 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) F- 14 G ui de bo ok fo r R ec ru iti ng , D ev el op in g, a nd R et ai ni ng Tr an si t M an ag er s fo r F ix ed - R ou te a nd P ar at ra ns it Sy st em s IC F, In c. 9/ 12 /2 00 8 2/ 26 /2 01 0 $2 49 ,9 98 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 39 F- 15 A Pr ac tic al G ui de fo r R ec ru iti ng M in or iti es fo r C hi ef E xe cu tiv e O ffi ce rs a t Pu bl ic T ra ns po rta tio n Ag en ci es G en er at or G ro up , LL C 12 /5 /2 00 8 3/ 30 /2 01 1 $2 49 ,9 45 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 48 F- 16 Bu ild in g a Su st ai na bl e W or kf or ce in th e Pu bl ic Tr an sp or ta tio n In du st ry - A Sy st em s Ap pr oa ch Tr an sp or ta tio n Le ar ni ng C en te r 9/ 29 /2 01 0 3/ 28 /2 01 1 $1 49 ,2 78 $1 50 ,0 00 C om pl et ed - R es ul ts to F -1 6A F- 16 A Bu ild in g a Su st ai na bl e W or kf or ce in th e Pu bl ic Tr an sp or ta tio n In du st ry - A Sy st em s Ap pr oa ch IC F, In c. 9/ 30 /2 01 1 4/ 30 /2 01 3 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 62 F- 17 D ev el op in g Be st P ra ct ic e G ui de lin es fo r I m pr ov in g Bu s O pe ra to r H ea lth a nd R et en tio n Tr an sp or ta tio n Le ar ni ng C en te r 10 /1 3/ 20 11 11 /3 0/ 20 13 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 69 F- 18 Po lic in g an d Se cu rit y Pr ac tic es fo r S m al l- an d M ed iu m -S iz ed T ra ns it Sy st em s C ou nt er m ea su re s As se ss m en t a nd Se cu rit y Ex pe rts , L LC 9/ 30 /2 01 1 11 /1 3/ 20 14 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 80 F- 19 A N at io na l T ra in in g an d C er tif ic at io n Pr og ra m fo r Tr an si t V eh ic le M ai nt en an ce In st ru ct or s Tr an sp or ta tio n Le ar ni ng C en te r 1/ 21 /2 01 3 10 /3 1/ 20 14 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 78 F- 20 La bo r- M an ag em en t Pa rtn er sh ip s in P ub lic Tr an sp or ta tio n AE C O M T ec hn ic al Se rv ic es , I nc . 11 /1 2/ 20 12 8/ 15 /2 01 5 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 81 , V ol um es 1 a nd 2 F- 21 To ol s an d St ra te gi es fo r El im in at in g As sa ul ts Ag ai ns t T ra ns it O pe ra to rs C ou nt er m ea su re s As se ss m en t & Se cu rit y Ex pe rts , L LC 12 /1 3/ 20 13 7/ 30 /2 01 7 $3 00 ,0 00 J. P ow el l $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 93 .

72 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) F- 22 Id en tif yi ng B es t P ra ct ic es an d Sh ar in g R es ou rc es fo r Tr an si t T ec hn ic al T ra in in g IC F, In c. 10 /2 8/ 20 15 3/ 30 /2 01 8 $3 00 ,0 00 B. J ac ks on $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 99 , V ol . 1 F- 23 Kn ow le dg e M an ag em en t R es ou rc e to S up po rt St ra te gi c W or kf or ce D ev el op m en t f or T ra ns it Ag en ci es IC F, In c. 11 /3 /2 01 5 8/ 30 /2 01 7 $3 00 ,0 00 T. D ex te r $3 00 ,0 00 R es ea rc h C om pl et ed . Pu bl is he d as T C R P R ep or t 19 4 F- 24 O ve rc om in g Ba rri er s to Im pl em en tin g Be st a nd In no va tiv e Tr ai ni ng Pr ac tic es fo r P ub lic Tr an sp or ta tio n' s Fr on tli ne W or kf or ce IC F, In c. 10 /2 8/ 20 15 3/ 30 /2 01 8 $3 00 ,0 00 B. J ac ks on $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 99 , V ol . 2 F- 25 Im pr ov in g th e Sa fe ty , H ea lth , a nd P ro du ct iv ity o f Tr an si t O pe ra to rs T hr ou gh Ad eq ua te R es tro om R es ea rc h Fo un da tio n of C ity U ni ve rs ity o f N ew Yo rk 2/ 2/ 20 17 1/ 25 /2 01 9 G . C hi sh ol m $3 00 ,0 00 H . J en se n $3 00 ,0 00 R es ea rc h in P ro gr es s F- 26 Im pr ov in g th e H ea lth a nd Sa fe ty o f t he T ra ns it W or kf or ce w ith C or re sp on di ng Im pa ct s on th e Bo tto m -L in e: M ed ic al Q ua lif ic at io n, H ea lth C ar e an d U se o f R x/ O TC Ec on om et ric a In c. 11 /1 5/ 20 17 1/ 17 /2 02 0 L. G ol ds te in $2 50 ,0 00 K. B la ck s $2 50 ,0 00 R es ea ch in P ro gr es s F- 27 Ev al ua tio n of N on -P un iti ve Em pl oy ee S af et y R ep or tin g to Im pr ov e Tr an si t S af et y U SF C U TR 1/ 8/ 20 19 1/ 7/ 20 20 D . S ch w ag er $1 00 ,0 00 N . S ob hi C . L aM ac ch ia $1 00 ,0 00 R es ea rc h in P ro gr es s F- 28 Pr ac tit io ne r's G ui de to B us O pe ra to r W or kf or ce M an ag em en t D . S ch w ag er $0 $1 00 ,0 00 + $1 00 ,0 00 (J - 11 )= 2 00 ,0 00 In D ev el op m en t

73 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) G : A D M IN IS TR A TI O N G -0 1 In fo rm at io n Te ch no lo gi es -- St at e- of -th e- Ar t Ap pl ic at io ns fo r T ra ns it Pr op er tie s C as tle R oc k C on su lt 12 /1 /1 99 3 5/ 31 /1 99 5 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - N ot P ub lis he d G -0 2 Ba r C od in g in T ra ns it O pe ra tio ns a nd M ai nt en an ce Te le ph on ic s C or p 11 /1 5/ 19 93 9/ 14 /1 99 5 $1 49 ,9 99 $1 50 ,0 00 C om pl et ed - Pu bl is he d as W eb D oc um en t 1 0 G -0 3 Tr an si t R is k M an ag er fo r Bu s Sy st em s R is k M an ag em en t C en te r 10 /1 /1 99 4 5/ 31 /1 99 6 $1 92 ,9 64 $1 95 ,0 00 C om pl et ed - Pu bl is he d as R R D s 11 a nd 1 2; R is k M an ag er S of tw ar e D ev el op ed G -0 4 D ev el op in g St an da rd s fo r Sy st em a nd S ub sy st em In te rfa ce s in E le ct ric R ai l Pa ss en ge r V eh ic le s Th om as J M cG ea n 1/ 15 /1 99 6 10 /1 /1 99 7 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - Pr oj ec t C on tin ue d as G -0 4A G -0 4A G -0 4B D ev el op in g St an da rd s fo r Sy st em a nd S ub sy st em In te rfa ce s in E le ct ric R ai l Pa ss en ge r V eh ic le s - Ex te ns io n Th om as J M cG ea n 9/ 1/ 19 97 2/ 28 /2 00 2 $7 55 ,1 48 $2 75 ,0 00 $3 25 ,0 00 $3 00 ,0 00 $3 20 ,0 00 C om pl et ed - Pu bl is he d as R R D 4 4 G -0 4C D ev el op in g St an da rd s fo r Sy st em a nd S ub sy st em In te rfa ce s in E le ct ric R ai l Pa ss en ge r V eh ic le s - Tr an si tio n to A PT A Am er ic an P ub lic Tr an sp or ta tio n As so ci at io n 4/ 1/ 20 02 7/ 31 /2 00 3 $7 5, 00 0 $7 5, 00 0 C om pl et ed - AP TA St an da rd s Pu bl is he d G -0 5 M an ag em en t T oo lk it fo r Sm al l U rb an a nd R ur al Pu bl ic T ra ns po rta tio n Sy st em s KF H G ro up 2/ 1/ 19 97 3/ 31 /1 99 9 $2 49 ,8 96 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 5 4 G -0 6 A G ui de bo ok fo r D ev el op in g a Tr an si t Pe rfo rm an ce - M ea su re m en t S ys te m Ki ttl es on & As so ci at es 6/ 28 /2 00 1 11 /2 8/ 20 02 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 8 8 an d R R D 5 6

74 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) G -0 7 M an ag in g C ap ita l C os ts o f M aj or F ed er al ly F un de d Pu bl ic T ra ns po rta tio n Pr oj ec ts Bo oz , A lle n & H am ilt on 9/ 10 /2 00 3 12 /1 /2 00 5 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 7 8 an d W eb -O nl y D oc um en t 3 1 G -0 8 A G ui de bo ok fo r t he Ev al ua tio n of P ro je ct D el iv er y M et ho ds N or th ea st er n U ni ve rs ity 10 /1 /2 00 6 10 /3 1/ 20 08 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 31 a nd W eb -O nl y D oc um en t 4 1 G -0 9 Sh ar in g th e C os ts o f H um an S er vi ce s Tr an sp or ta tio n W es ta t 10 /1 5/ 20 06 9/ 30 /2 01 0 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 44 G -1 0 Es tim at in g So ft C os ts fo r M aj or P ub lic Tr an sp or ta tio n Fi xe d G ui de w ay P ro je ct s AE C O M C on su lt 8/ 24 /2 00 7 12 /1 /2 00 9 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 38 G -1 1 A M et ho do lo gy fo r Pe rfo rm an ce M ea su re m en t an d Pe er C om pa ris on in th e Pu bl ic T ra ns po rta tio n In du st ry Ki ttl es on & A ss oc 11 /1 /2 00 7 3/ 1/ 20 10 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 41 G -1 2 Fu el P ur ch as in g St ra te gi es fo r P ub lic T ra ns it Ag en ci es Sc ie nc e Ap pl ic at io ns In te rn at io na l C or po ra tio n 12 /1 1/ 20 09 3/ 2/ 20 12 $2 99 ,9 97 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 56 G -1 3 D ev el op in g an IT S Te ch no lo gy W eb P or ta l f or Tr an si t S ys te m L ea de rs C on se ns us S ys te m s Te ch no lo gi es C or p. 11 /1 5/ 20 11 12 /3 1/ 20 15 $9 9, 99 3 $1 00 ,0 00 C om pl et ed - R es ul ts to A PT A G -1 4 C on tra ct in g C om m ut er R ai l Se rv ic es Te xa s A& M Tr an sp or ta tio n In st itu te 2/ 18 /2 01 5 5/ 31 /2 01 8 $3 00 ,0 00 S. M ai a $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 2 00 G -1 5 Pu bl ic T ra ns po rta tio n R es ou rc e fo r S m al l- an d M ed iu m -S iz ed P 3 In iti at iv es Pa rs on s Br in ck er ho ff 9/ 25 /2 01 5 1/ 24 /2 01 7 $1 50 ,0 00 T. Y ed in ak $1 50 ,0 00 C om pl et ed - Pu bl is he d as TC R P R ep or t 1 91 G -1 6 D ev el op m en t o f Tr an sa ct io na l D at a Sp ec ifi ca tio ns fo r D em an d- R es po ns iv e Tr an sp or ta tio n D em an d Tr an s So lu tio n 11 /1 6/ 20 16 8/ 31 /2 01 9 D . S ch w ag er $2 50 ,0 00 M . O m ay $2 50 ,0 00 C om pl et ed -- Pu bl ic at io n pe nd in g

75 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) G -1 7 As se ss in g Li fe cy cl e an d H um an C os ts o f B us O pe ra to r W or ks ta tio n D es ig n an d C om po ne nt s Pe nn sy lv an ia S ta te U ni ve rs ity 7/ 17 /2 01 8 7/ 16 /2 02 0 S. P ar ke r $2 50 ,0 00 S. P er ei ra D . S pr at lin g $2 50 ,0 00 R es ea rc h in P ro gr es s G -1 8 Im pr ov in g Ac ce ss a nd M an ag em en t o f T ra ns it IT S D at a L. G ol ds te in $0 G . T or ng A. V al le $3 50 ,0 00 In D ev el op m en t H : PO LI C Y A N D P LA N N IN G H -0 1 Tr an si t a nd U rb an F or m Pa rs on s Br in ck er ho ff, Q ua de , & D ou gl as 6/ 10 /1 99 3 3/ 31 /1 99 6 $6 00 ,0 00 $6 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 7 a nd R ep or t 1 6 H -0 2 M ea su rin g an d Va lu in g Tr an si t B en ef its a nd D is be ne fit s C am br id ge Sy st em at ic s 5/ 26 /1 99 3 5/ 31 /1 99 6 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 2 0 H -0 3 St ra te gi es to A ttr ac t A ut o U se rs to P ub lic Tr an sp or ta tio n Po rtl an d St at e U 5/ 2/ 19 94 10 /3 1/ 19 96 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 4 0 H -0 4A Bu ild in g Tr an si t R id er sh ip : An E xp lo ra tio n of T ra ns it' s M ar ke t S ha re a nd th e Pu bl ic P ol ic ie s th at In flu en ce It C ha rle s R iv er A ss oc 10 /1 7/ 19 94 10 /1 6/ 19 97 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 2 7 H -0 4B Tr an si t M ar ke ts o f t he Fu tu re - Th e C ha lle ng e of C ha ng e U o f A riz on a 2/ 1/ 19 95 4/ 30 /1 99 7 $2 49 ,9 95 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 2 8 H -0 4C In st itu tio na l B ar rie rs to In te rm od al T ra ns po rta tio n Po lic ie s an d Pl an ni ng in M et ro po lit an A re as C ra in & A ss oc 10 /3 /1 99 4 6/ 30 /1 99 6 $2 49 ,9 98 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 4 H -0 4D Th e R ol e of T ra ns it in C re at in g Li va bl e M et ro po lit an C om m un iti es Pr oj ec t f or P ub lic Sp ac es 10 /3 /1 99 4 7/ 31 /1 99 7 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 2 2

76 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) H -0 4D (2 ) Tr an si t-F rie nd ly S tre et s: D es ig n an d Tr af fic M an ag em en t S tra te gi es to Su pp or t L iv ab le C om m un iti es Pr oj ec t f or P ub lic Sp ac es 7/ 1/ 19 96 7/ 31 /1 99 7 $7 5, 00 0 $7 5, 00 0 C om pl et ed - Pu bl is he d as R ep or t 3 3 H -0 4E Su st ai na bl e Tr an sp or ta tio n TR B St ud ie s an d In fo rm at io n Se rv ic es D iv is io n 5/ 1/ 19 94 12 /3 1/ 19 96 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as TR B Sp ec ia l R ep or t 2 51 H -0 5 R es ea rc h Ag en da fo r In cr ea si ng T ra ns it R id er sh ip N /A 11 /1 8/ 19 94 11 /1 9/ 19 94 $5 4, 82 8 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 6 H -0 6 C oo rd in at ed In te rm od al Tr an sp or ta tio n Pr ic in g an d Fu nd in g St ra te gi es M ul tis ys te m s 12 /1 /1 99 4 6/ 30 /1 99 7 $1 50 ,0 00 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R R D 1 4 H -0 7 Fu nd in g St ra te gi es fo r Pu bl ic T ra ns po rta tio n Pr ic e W at er ho us e 2/ 15 /1 99 6 12 /3 1/ 19 97 $1 99 ,8 36 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 3 1 H -0 8 U si ng P ub lic Tr an sp or ta tio n to R ed uc e th e Ec on om ic , S oc ia l, an d H um an C os ts o f P er so na l Im m ob ilit y C ra in & A ss oc 2/ 12 /1 99 6 6/ 30 /1 99 9 $2 99 ,9 96 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 4 9; C as e St ud ie s Pu bl is he d as W eb D oc um en t 7 H -0 9 Ec on om ic Im pa ct A na ly si s of T ra ns it In ve st m en ts : G ui de bo ok fo r P ra ct iti on er s C am br id ge Sy st em at ic s 1/ 2/ 19 96 12 /1 /1 99 7 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 3 5 H -1 0 C os ts o f S pr aw l-- 20 00 R ut ge rs U C en te r f or U rb an P ol ic y R es ea rc h 4/ 1/ 19 96 4/ 30 /2 00 1 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - In te rim R ep or t Pu bl is he d as R ep or t 3 9; Fi na l R ep or t P ub lis he d as R ep or t 7 4 H -1 1 As se ss m en t o f t he Ec on om ic Im pa ct s of R ur al Pu bl ic T ra ns po rta tio n Ec os om et ric s 1/ 15 /1 99 6 10 /1 4/ 19 97 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 3 4

77 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) H -1 2 In te gr at ed U rb an M od el s fo r S im ul at io n of T ra ns it an d La nd -U se P ol ic ie s: G ui de lin es fo r Im pl em en ta tio n an d U se U o f T or on to 6/ 1/ 19 97 9/ 30 /1 99 8 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 4 8 an d W eb D oc um en t 9 H -1 3A C on se qu en ce s of th e In te rs ta te H ig hw ay S ys te m fo r T ra ns it Pa rs on s Br in ck er ho ff, Q ua de , & D ou gl as 5/ 31 /1 99 6 12 /3 1/ 19 97 $1 25 ,0 00 $1 25 ,0 00 C om pl et ed - In te rim R ep or t Pu bl is he d as R R D 2 1; F in al R ep or t P ub lis he d as R ep or t 42 H -1 3B Tr en ds in S in gl e- O cc up an t Ve hi cl e an d Ve hi cl e M ile s of T ra ve l G ro w th in th e U .S . C ha rle s R iv er A ss oc 4/ 16 /1 99 6 10 /1 6/ 19 97 $1 25 ,0 00 $1 25 ,0 00 C om pl et ed - Pu bl is he d as R R D 3 0 an d W eb D oc um en t 5 H -1 4 M ak in g Tr an si t W or k: In si gh t f ro m W es te rn Eu ro pe , C an ad a, a nd th e U ni te d St at es TR B St ud ie s an d In fo rm at io n Se rv ic es 3/ 10 /1 99 7 12 /3 0/ 20 00 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - Pu bl is he d as TR B Sp ec ia l R ep or t 2 57 H -1 5 Pr oj ec ts to S up po rt "M ob ilit y fo r t he 2 1s t C en tu ry " N /A $1 50 ,0 00 C om pl et ed - W or ks ho p C on du ct ed A pr il 19 97 H -1 5A G ui de bo ok fo r D ev el op in g W el fa re -to -W or k Tr an sp or ta tio n Se rv ic es M ul tis ys te m s 5/ 11 /1 99 8 6/ 30 /2 00 0 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 6 4 an d W eb D oc um en t 1 6 H -1 6 A N at io na l T ra ns it In du st ry La bo r-M an ag em en t C oo pe ra tio n Pr og ra m : N ew Pa ra di gm s fo r L ab or - M an ag em en t R el at io ns in th e Tr an si t I nd us try o f t he 21 st C en tu ry C or ne ll U ni ve rs ity 8/ 6/ 19 98 1/ 31 /2 00 2 $7 5, 00 0 $1 50 ,0 00 C om pl et ed - Th re e W or ks ho ps C on du ct ed H -1 7 N ew F or m s of La bo r/M an ag em en t C oo pe ra tio n: A S er ie s of M ee tin gs L ea di ng to a D em on st ra tio n of In no va tiv e W or ki ng As si gn m en ts $1 50 ,0 00 C an ce lle d

78 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) H -1 9 H -1 9A Es tim at in g th e Be ne fit s an d C os ts o f P ub lic T ra ns it Pr oj ec ts : A G ui de bo ok fo r Pr ac tit io ne rs Pa rs on s, Br in ck er ho ff, Q ua de , & D ou gl as 3/ 23 /1 99 9 10 /3 1/ 20 01 $2 50 ,0 00 $2 00 ,0 00 $5 0, 00 0 C om pl et ed - Pu bl is he d as R ep or t 7 8 H -2 0 U si ng G eo gr ap hi c In fo rm at io n Sy st em s (G IS ) fo r W el fa re to W or k Tr an sp or ta tio n Pl an ni ng an d Se rv ic e D el iv er y M ul tis ys te m s 10 /1 9/ 19 98 2/ 15 /2 00 0 $1 24 ,9 70 $1 25 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 6 0 an d W eb D oc um en t 1 4 H -2 1 Tr av el M at te rs : M iti ga tin g C lim at e C ha ng e w ith Su st ai na bl e Su rfa ce Tr an sp or ta tio n C en te r f or N ei gh bo rh oo d Te ch no lo gy 6/ 7/ 20 01 3/ 7/ 20 03 $1 74 ,9 53 $1 75 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 9 3 H -2 1A Tr av el M at te rs : M iti ga tin g C lim at e C ha ng e w ith Su st ai na bl e Su rfa ce Tr an sp or ta tio n C en te r f or N ei gh bo rh oo d Te ch no lo gy 6/ 7/ 20 03 10 /1 /2 00 4 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - Pu bl is he d as W eb D oc um en t 2 6 H -2 2A Ev al ua tio n of th e N at io na l Tr an si t D at ab as e FT A Pr oj ec t w ith KP M G P ea t M ar w ic k 2/ 1/ 20 00 5/ 31 /2 00 1 $9 00 ,0 00 C om pl et ed - FT A R ep or t Pr ep ar ed H -2 2B Ev al ua tio n of th e N at io na l Tr an si t D at ab as e- TR B C om m itt ee TR B D iv is io n B 8/ 1/ 20 00 4/ 30 /2 00 1 $1 00 ,0 00 C om pl et ed - Le tte r R ep or ts Pr ep ar ed H -2 2C Im pl em en ta tio n of th e R ed es ig ne d N at io na l Tr an si t D at ab as e FT A Pr oj ec t $1 ,5 00 ,0 00 FT A Pr oj ec t - C om pl et ed H -2 3 As se ss m en t o f t he B en ef its of N ew T ra ns it In ve st m en ts vs . I nv es tm en ts in E xi st in g In fra st ru ct ur e FT A Pr oj ec t $2 00 ,0 00 FT A Pr oj ec t - C om pl et ed H -2 4 Pu bl ic T ra ns it Bo ar d G ov er na nc e G ui de bo ok Si m on & S im on R es ea rc h an d As so c. 10 /1 1/ 20 00 7/ 15 /2 00 2 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 8 5 an d W eb D oc 2 1 H -2 4A Pu bl ic T ra ns po rta tio n Bo ar d Ef fe ct iv en es s: A Se lf- As se ss m en t H an db oo k AE C O M C on su lti ng Tr an sp or ta tio n G ro up 1/ 13 /2 00 3 6/ 13 /2 00 4 $1 75 ,0 00 $1 75 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 04 a nd W eb D oc um en t 2 4

79 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) H -2 5 St ra te gi es fo r I nc re as in g th e Ef fe ct iv en es s of C om m ut er B en ef its Pr og ra m s IC F C on su lti ng , I nc . 10 /1 3/ 20 00 11 /1 5/ 20 02 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 8 7 H -2 5A An al yz in g th e Ef fe ct iv en es s of C om m ut er Be ne fit P ro gr am s IC F C on su lti ng , I nc . 4/ 8/ 20 03 6/ 30 /2 00 5 $1 60 ,0 00 $1 60 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 07 a nd W eb -O nl y D oc um en t 2 7 H -2 6 Ec on om ic B en ef its o f C oo rd in at in g H um an Se rv ic e Tr an sp or ta tio n an d Tr an si t S er vi ce s W es ta t 10 /1 5/ 20 00 4/ 15 /2 00 3 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 9 1 H -2 7 Tr an si t-O rie nt ed D ev el op m en t i n Am er ic a: Ex pe rie nc es , C ha lle ng es , an d Pr os pe ct s U C - Be rk el ey 9/ 1/ 20 01 1/ 30 /2 00 4 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 02 H -2 7A Ef fe ct s of T O D o n H ou si ng , P ar ki ng a nd Tr av el Pa rs on s Br in ck er ho ff Q ua de & D ou gl as 10 /1 /2 00 4 4/ 30 /2 00 8 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 28 H -2 8 U se o f A rc hi ve d AV L- AP C D at a to Im pr ov e Tr an si t Pe rfo rm an ce a nd M an ag em en t N or th ea st er n U ni ve rs ity 8/ 1/ 20 01 4/ 30 /2 00 6 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - In te rim R ep or t Pu bl is he d as W eb D oc um en t 23 ; F in al R ep or t P ub lis he d as R ep or t 1 13 H -2 9 Fr om H an ds ha ke to C om pa ct : G ui da nc e to Fo st er C ol la bo ra tiv e, M ul tim od al D ec is io n M ak in g Tr an sM an ag em en t, In c. 8/ 1/ 20 01 10 /2 8/ 20 04 $3 50 ,0 00 $2 00 ,0 00 (T C R P) $1 50 ,0 00 (N C H R P) C om pl et ed - Pu bl is he d as R ep or t 1 06 H -3 0 H -3 0A St ra te gi es to In cr ea se C oo rd in at io n of Tr an sp or ta tio n Se rv ic es fo r th e Tr an sp or ta tio n D is ad va nt ag ed Tr an Sy st em s 7/ 16 /2 00 2 10 /9 /2 00 4 $2 00 ,0 00 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 05

80 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) H -3 1 U nd er st an di ng H ow In di vi du al s M ak e Tr av el an d Lo ca tio n D ec is io ns : Im pl ic at io ns fo r P ub lic Tr an sp or ta tio n Tr an Sy st em s 10 /2 2/ 20 03 8/ 31 /2 00 7 $3 50 ,0 00 $3 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 23 H -3 2 El em en ts N ee de d to C re at e H ig h R id er sh ip Tr an si t S ys te m s Tr an Sy st em s 11 /4 /2 00 4 10 /3 0/ 20 06 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 11 H -3 3A St at e an d N at io na l T ra ns it In ve st m en t A na ly si s: Q ui ck - R es po ns e An al ys es fo r SA FE TE A- LU C om m is si on C am br id ge Sy st em at ic s 2/ 21 /2 00 6 12 /3 0/ 20 06 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - R es ul ts to A PT A H -3 3B St at e an d N at io na l T ra ns it In ve st m en t A na ly si s: Ad di tio na l A na ly se s fo r AA SH TO B ot to m L in e R ep or t a nd R el at ed A PT A R ep or ts C am br id ge Sy st em at ic s 10 /1 6/ 20 07 10 /1 5/ 20 08 $1 00 ,0 00 $1 00 ,0 00 C om pl et ed - R es ul ts to AA SH TO a nd A PT A H -3 4 Lo ca l a nd R eg io na l Fu nd in g M ec ha ni sm s fo r Pu bl ic T ra ns po rta tio n C am br id ge Sy st em at ic s 8/ 8/ 20 06 9/ 15 /2 00 8 $2 50 ,0 00 $2 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 29 H -3 5 Th e R ol e of T ra ns it in Em er ge nc y Ev ac ua tio n N AS /T R B 11 /1 /2 00 6 7/ 31 /2 00 8 $6 5, 00 0 $6 5, 00 0 C om pl et ed - Pu bl is he d as TR B Sp ec ia l R ep or t 2 94 H -3 6 R ei nv en tin g th e U rb an In te rs ta te : A N ew Pa ra di gm fo r M ul tim od al C or rid or s D ow lin g As so ci at es 10 /2 6/ 20 07 11 /1 /2 01 0 $3 49 ,9 84 $4 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 45 H -3 7 C ha ra ct er is tic s of P re m iu m Tr an si t S er vi ce s Th at Af fe ct C ho ic e of M od e R SG , I nc . 12 /2 8/ 20 07 12 /3 0/ 20 13 $7 74 ,9 45 $3 75 ,0 00 $4 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 66 H -3 8 D ev el op in g, E nh an ci ng an d Su st ai ni ng T rib al Tr an si t S er vi ce s: A G ui de bo ok LS C T ra ns po rta tio n C on su lta nt s, In c. 9/ 30 /2 00 8 12 /3 1/ 20 11 $3 99 ,3 66 $4 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 54 a nd W eb -O nl y D oc um en t 5 4

81 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) H -3 9 M et ho do lo gy fo r D et er m in in g th e Ec on om ic D ev el op m en t I m pa ct s of Tr an si t P ro je ct s R ut ge rs U ni ve rs ity 11 /1 1/ 20 08 6/ 23 /2 01 2 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - Pu bl is he d as W eb -O nl y D oc um en t 5 6 H -4 0 G ui de lin es fo r F er ry Tr an sp or ta tio n Se rv ic es Ar up 10 /3 0/ 20 08 11 /3 0/ 20 11 $1 99 ,2 86 $2 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 52 H -4 1 As se ss in g an d C om pa rin g En vi ro nm en ta l Pe rfo rm an ce o f M aj or Tr an si t P ro je ct s C am br id ge Sy st em at ic s, In c. 12 /2 4/ 20 09 3/ 1/ 20 12 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - Pu bl is he d as R es ea rc h R es ul ts D ig es t 1 05 an d W eb -O nl y D oc um en t 5 5 H -4 2 M ak in g Ef fe ct iv e Fi xe d - G ui de w ay T ra ns it In ve st m en ts : I nd ic at or s of Su cc es s U ni ve rs ity o f C al ifo rn ia - Be rk el ey 11 /1 9/ 20 10 1/ 15 /2 01 4 $5 00 ,0 00 $4 00 ,0 00 $1 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 67 H -4 3 Tr an sf or m in g Pu bl ic Tr an sp or ta tio n In st itu tio na l an d Bu si ne ss M od el s H ig h St re et C on su lti ng G ro up 10 /1 /2 01 0 10 /3 1/ 20 12 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 59 H -4 4 D ev el op in g Pa rtn er sh ip s Be tw ee n Tr an sp or ta tio n Ag en ci es a nd th e D is ab ilit y an d U nd er re pr es en te d C om m un iti es Si m on & S im on R es ea rc h As so ci at es 9/ 21 /2 01 0 9/ 30 /2 01 2 $7 4, 95 5 $7 5, 00 0 C om pl et ed - Pu bl is he d as R es ea rc h R es ul ts D ig es t 1 07 H -4 5 Li va bl e Tr an si t C or rid or s: M et ho ds , M et ric s, a nd St ra te gi es C FA C on su lta nt s 1/ 20 /2 01 2 6/ 1/ 20 16 $4 00 ,0 00 A. L ou i $4 00 ,0 00 C om pl et ed - Pu bl is he d as TC R P R ep or t 1 87 H -4 6 Q ua nt ify in g Tr an si t's Im pa ct o n G H G E m is si on s an d En er gy U se -T he L an d U se C om po ne nt IC F, In c. 10 /1 1/ 20 11 12 /1 /2 01 4 $4 00 ,0 00 $4 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 76 H -4 7 Li nk in g Tr an si t A ge nc ie s an d La nd U se D ec is io n- M ak in g: G ui de bo ok fo r Tr an si t A ge nc ie s Pa rs on s Br in ck er ho ff 1/ 25 /2 01 2 10 /2 4/ 20 15 $3 00 ,0 00 $3 00 ,0 00 C om pl et ed - Pu bl is he d as TC R P R ep or t 1 82 H -4 8 Va lu e C ap tu re fo r Fi na nc in g Tr an si t C an ce lle d

82 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) H -4 9 Im pr ov in g Tr an si t In te gr at io n Am on g M ul tip le Tr an si t P ro vi de rs N el so n/ N yg aa rd 1/ 2/ 20 13 10 /1 /2 01 4 $2 99 ,7 83 $3 00 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 73 , V ol um es I an d II H -5 0 Lo ca l E co no m ic D ev el op m en t M ea su re m en t T oo l f or Tr an si t Ec on om ic R es ea rc h D ev el op m en t G ro up 2/ 11 /2 01 5 4/ 1/ 20 16 $1 50 ,0 00 $1 50 ,0 00 C om pl et ed - Pu bl is he d as R ep or t 1 86 H -5 1 U nd er st an di ng C ha ng es in D em og ra ph ic s, Pr ef er en ce s an d M ar ke ts fo r t he T ra ns it In du st ry R es ou rc e Sy st em s G ro up , I nc . 10 /2 3/ 20 15 4/ 30 /2 01 8 $3 50 ,0 00 P. M az ur ek J. R ya n $3 50 ,0 00 C om pl et ed -P ub lis he d as TC R P R ep or t 2 01 H -5 2 D ec is io n- M ak in g To ol bo x to P la n an d M an ag e Pa rk - an d- R id e Fa ci lit ie s fo r Pu bl ic T ra ns po rta tio n Te xa s A& M En gi ne er in g Ex pe rim en t S ta tio n 2/ 1/ 20 15 1/ 11 /2 01 7 $3 00 ,0 00 K. C er ve nk a $3 00 ,0 00 C om pl et ed - Pu bl is he d as TC R P R ep or t 1 92 H -5 3 To ol s fo r a S us ta in ab le Tr an si t A ge nc y IC F In te rn at io na l, In c 10 /2 3/ 20 15 3/ 30 /2 01 8 $3 00 ,0 00 A. Q ua gl ia ta $3 00 ,0 00 C om pl et ed - Pu bl is he d as TC R P R ep or t 1 97 H -5 4 G ui de to E qu ity A na ly si s in R eg io na l T ra ns po rta tio n Pl an ni ng P ro ce ss es IC F In te rn at io na l, In c 12 /1 4/ 20 16 8/ 31 /2 01 9 G . C hi sh ol m $2 00 ,0 00 K. C er ve nk a $3 00 ,0 00 C om pl et ed -- Pu bl ic at io n pe nd in g H -5 5 G ui de bo ok fo r I nt eg ra tin g Tr an sp or ta tio n an d H ea lth C ar e Pr ov id er s KF H G ro up 10 /1 6/ 20 17 12 /3 1/ 20 19 D . S ch w ag er $2 00 ,0 00 D . N el so n J. L yn ch $2 00 ,0 00 R es ea rc h in P ro gr es s H -5 6 R ei nv en tin g Tr an si t N et w or ks fo r a N ew M ob ilit y Fu tu re Fo ur sq ua re In te gr at ed Tr an sp or ta tio n Pl an ni ng In c 1/ 8/ 20 19 7/ 7/ 20 20 D . S ch w ag er $3 00 ,0 00 M . O m ay K. W oo d R es ea rc h in P ro gr es s H -5 7 G ui de to J oi nt D ev el op m en t f or P ub lic Tr an sp or ta tio n Ag en ci es AE C O M 12 /3 /2 01 8 6/ 2/ 20 20 L. G ol ds te in $4 00 ,0 00 D .S ch ne d J. C ro ck er R es ea rc h in P ro gr es s H -5 8 Tr an si t P rio rit iz at io n Sc or in g M et ho do lo gy in M et ro po lit an P la nn in g O rg an iz at io n Pr og ra m m in g D . S ch w ag er $0 C . W ar d $1 00 ,0 00 In D ev el op m en t

83 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) J : S PE C IA L PR O JE C TS J- 01 D is se m in at io n an d Im pl em en ta tio n of T C R P R es ea rc h Fi nd in gs Am er ic an P ub lic Tr an sp or ta tio n As so c 2/ 15 /1 99 3 G . C hi sh ol m F. H al l $4 00 ,0 00 (9 2) $6 00 ,0 00 (9 4) $2 50 ,0 00 (9 5) $4 50 ,0 00 (9 6) $6 96 ,0 00 (9 7) $5 96 ,0 00 (9 8) $6 66 ,6 00 (9 9) $6 96 ,6 05 (0 0) $6 91 ,6 00 (0 1) $7 00 ,0 00 (0 2) $6 96 ,0 00 (0 3) $7 00 ,0 00 (0 4) $7 36 ,0 00 (0 5) $7 50 ,0 00 (0 6) $7 75 ,0 00 (0 7) $7 50 ,4 00 (0 8) $7 56 ,0 00 (0 9) $6 95 ,0 00 (1 0) $7 20 ,7 00 (1 1) $4 04 ,6 00 (1 2) $3 13 ,6 50 (1 3) $3 08 ,2 19 (1 4) $4 20 ,0 00 (1 5) $5 00 ,0 00 (1 6) $4 50 ,0 00 (1 7) $4 39 ,2 60 (1 8) $4 14 ,8 41 (1 9) $3 93 ,6 00 (2 0) C on tin ui ng P ro je ct J- 02 TC R P St ra te gi c Pl an ni ng Pr oc es s an d St ra te gi c Pl an Va rio us 10 /2 8/ 19 92 12 /3 1/ 19 96 $5 0, 00 0 $5 0, 00 0 C om pl et ed

84 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) J- 03 In te rn at io na l T ra ns it St ud ie s Pr og ra m Va rio us 2/ 1/ 19 94 G . C hi sh ol m F. H al l $2 50 ,0 00 (9 2) $2 50 ,0 00 (9 4) $2 50 ,0 00 (9 5) $3 25 ,0 00 (9 6) $3 25 ,0 00 (9 7) $2 00 ,0 00 (9 8) $4 50 ,0 00 (9 9) $3 25 ,0 00 (0 0) $3 25 ,0 00 (0 1) $3 25 ,0 00 (0 2) $3 25 ,0 00 (0 3) $3 25 ,0 00 (0 4) $3 25 ,0 00 (0 5) $3 25 ,0 00 (0 6) $4 50 ,0 00 (0 7) $4 25 ,0 00 (0 8) $5 00 ,0 00 (0 9) $5 00 ,0 00 (1 0) $5 00 ,0 00 (1 1) Pr oj ec t o n H ol d; Pu bl ic at io ns - R R D s 20 , 2 2, 27 , 3 1, 3 3, 3 6, 4 2, 4 7, 4 9, 5 3, 54 , 5 8, 6 2, 6 4, 6 6, 6 8, 7 0, 71 , 7 7, 8 1, 8 5, 8 7, 8 8, 8 9, 92 , 9 5, 9 6, 1 01 ,1 02 , a nd 1 03

85 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) J- 04 In no va tio ns D es er vi ng Ex pl or at or y An al ys is --T he Tr an si t I D EA P ro gr am Tr an sp or ta tio n R es ea rc h Bo ar d 12 /1 /1 99 2 V. B as em er a- Fi tz pa tri ck R . O ps te lte n $5 00 ,0 00 (9 2) $5 00 ,0 00 (9 4) $4 00 ,0 00 (9 5) $4 00 ,0 00 (9 6) $5 00 ,0 00 (9 7) $5 00 ,0 00 (9 9) $5 00 ,0 00 (0 0) $5 00 ,0 00 (0 1) $2 00 ,0 00 (0 2) $5 00 ,0 00 (0 3) $5 00 ,0 00 (0 4) $5 00 ,0 00 (0 5) $5 00 ,0 00 (0 6) $5 00 ,0 00 (0 7) $5 60 ,0 00 (0 8) $5 60 ,0 00 (0 9) $5 60 ,0 00 (1 0) $5 60 ,0 00 (1 1) $4 60 ,0 00 (1 2) $3 00 ,0 00 (1 3) $3 00 ,0 00 (1 4) $5 60 ,0 00 (1 5) $3 60 ,0 00 (1 6) $5 85 ,0 00 (1 7) $4 25 ,0 00 (1 8) $2 00 ,0 00 (1 9) $2 05 ,0 00 (2 0) C on tin ui ng P ro je ct ; S ee J -4 Ta bl e J- 04 A Pl an s fo r T ra ck in g ID EA an d D ev el op in g Tr an si t ID EA M ar ke tin g an d C om m un ic at io ns Ea st er n R es ea rc h G ro up 7/ 1/ 20 19 11 /3 0/ 20 19 V. B as em er a- Fi tz pa tri ck $4 0, 00 0 R . O ps te lte n $4 0, 00 0 R es ea rc h in P ro gr es s

86 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) J- 05 Le ga l A sp ec ts o f T ra ns it an d In te rm od al Tr an sp or ta tio n Pr og ra m s Tr an sp or ta tio n R es ea rc h Bo ar d 3/ 1/ 19 93 G . C hi sh ol m B. G ra ve s $1 50 ,0 00 (9 2) $1 75 ,0 00 (9 4) $3 00 ,0 00 (9 5) $1 50 ,0 00 (9 6) $1 75 ,0 00 (9 7) $3 00 ,0 00 (9 9) $1 20 ,0 00 (0 0) $1 50 ,0 00 (0 1) $1 50 ,0 00 (0 2) $1 00 ,0 00 (0 3) $2 5, 00 0 ( 04 ) $1 50 ,0 00 (0 5) $2 50 ,0 00 (0 6) $2 50 ,0 00 (0 7) $2 50 ,0 00 (0 8) $2 50 ,0 00 (0 9) $2 50 ,0 00 (1 0) $3 00 ,0 00 (1 1) $2 00 ,0 00 (1 2) $1 50 ,0 00 (1 3) $2 50 ,0 00 (1 4) $2 50 ,0 00 (1 5) $1 25 ,0 00 (1 6) $2 50 ,0 00 (1 7) $2 00 ,0 00 (1 8) $1 50 ,0 00 (1 9) $1 50 ,0 00 (2 0) C on tin ui ng P ro je ct ; S ee J -5 Ta bl e - P ub lis he d as R R D 5 0

87 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) J- 06 TC R P Q ui ck R es po ns e fo r Sp ec ia l N ee ds Va rio us 1/ 1/ 19 94 To b e de te rm in ed $1 00 ,0 00 (9 3) $ 5 0, 00 0 (9 4) $3 29 ,1 39 (9 5) $1 00 ,0 00 (9 6) $1 75 ,0 00 (9 7) $1 25 ,0 00 (9 8) $5 35 ,8 87 (9 9) $3 35 ,0 00 (0 0) $ 7 5, 00 0 (0 1) $2 00 ,0 00 (0 2) $1 50 ,0 00 (0 3) $5 00 ,0 00 (0 4) $1 50 ,0 00 (0 5) $3 00 ,0 00 (0 6) $1 50 ,0 00 (0 7) $ 7 5, 00 0 (0 8) $2 50 ,0 00 (0 9) $2 05 ,0 00 (1 0) $1 50 ,0 00 (1 1) $1 00 ,0 00 (1 3) $1 00 ,0 00 (1 5) $ 5 0, 00 0 (1 6) C on tin ui ng P ro je ct ; S ee J -6 Ta bl e

88 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) J- 07 Sy nt he si s of In fo rm at io n R el at ed to T ra ns it Pr ac tic es Tr an sp or ta tio n R es ea rc h Bo ar d 12 /1 /1 99 2 G . C hi sh ol m F. H al l $1 ,8 00 ,0 00 (9 2- 94 ) $3 75 ,0 00 (9 5) $3 75 ,0 00 (9 6) $4 00 ,0 00 (9 7) $2 00 ,0 00 (9 8) $4 00 ,0 00 (9 9) $4 00 ,0 00 (0 0) $4 00 ,0 00 (0 1) $3 75 ,0 00 (0 2) $4 00 ,0 00 (0 3) $5 00 ,0 00 (0 4) $6 00 ,0 00 (0 5) $6 00 ,0 00 (0 6) $6 00 ,0 00 (0 7) $6 00 ,0 00 (0 8) $7 00 ,0 00 (0 9) $7 55 ,0 00 (1 0) $7 50 ,0 00 (1 1) $6 50 ,0 00 (1 2) $3 50 ,0 00 (1 3) $5 50 ,0 00 (1 4) $6 50 ,0 00 (1 5) $7 50 ,0 00 (1 6) $8 57 ,0 00 (1 7) $8 70 ,0 00 (1 8) $3 15 ,0 00 (1 9) $3 15 ,0 00 (2 0) C on tin ui ng P ro je ct ; S ee J -7 Ta bl e; P ub lic at io ns - R R D s 2, 8 , 3 7, 4 8, 6 3, 6 7, 7 3, 8 0, 86 , 9 1, 9 8, 1 04 , 1 08 , 1 10 , 11 1, a nd 1 13 J- 08 N ew P ar ad ig m s fo r P ub lic Tr an si t $1 71 ,0 00 (9 6) C om pl et ed J- 08 A N ew P ar ad ig m s fo r P ub lic Tr an sp or ta tio n: A S co pi ng St ud y En o Tr an sp or ta tio n Fo un da tio n 2/ 25 /1 99 7 2/ 24 /1 99 8 $1 54 ,0 00 $1 54 ,0 00 (9 6) C om pl et ed - Fu tu re S ea rc h H el d M ay 1 99 7; P ub lis he d as R R D 2 4 J- 08 B/ C N ew P ar ad ig m s fo r L oc al Pu bl ic T ra ns po rta tio n O rg an iz at io ns C am br id ge Sy st em at ic s 5/ 11 /1 99 8 9/ 30 /2 00 3 $3 23 ,2 83 $3 25 ,0 00 (9 7) $4 00 ,0 00 (9 9) C om pl et ed - Ta sk 1 Pu bl is he d as R ep or t 5 3; Ta sk 5 P ub lis he d as R ep or t 58 ; P ha se II I I ss ue P ap er Pu bl is he d as R R D 5 5; F in al R ep or t P ub lis he d as R ep or t 97

89 N o. Ti tle C on tra ct or C on tra ct Am ou nt En d D at e St ar t D at e FT A Li ai so n( s) St af f O ffi ce r Al lo ca tio n St at us TA B LE 5 (c on tin ue d) J- 09 e- Tr an si t: El ec tro ni c Bu si ne ss S tra te gi es fo r Pu bl ic T ra ns po rta tio n $4 00 ,0 00 (0 0) $1 75 ,0 00 (0 2) $2 10 ,0 00 (0 3) $1 00 ,0 00 (0 4) $1 00 ,0 00 (0 5) $1 00 ,0 00 (0 6) C om pl et ed - Se e J- 9 Ta bl e J- 10 Pu bl ic T ra ns po rta tio n Se cu rit y R es ea rc h $2 ,0 00 ,0 00 (0 2) $ 4 00 ,0 00 (0 3) $ 3 50 ,0 00 (0 4) C om pl et ed - Se e J- 10 T ab le J- 11 Q ui ck R es po ns e R es ea rc h on L on g- Te rm S tra te gi c Is su es D . S ch w ag er $3 00 ,0 00 (0 7) $3 00 ,0 00 (0 8) $3 00 ,0 00 (0 9) $ 7 5, 00 0 (1 0) $2 50 ,0 00 (1 1) $2 00 ,0 00 (1 3) $2 25 ,0 00 (1 5) $1 00 ,0 00 (1 6) $4 00 ,0 00 (1 7) $4 00 ,0 00 (1 8) $3 00 ,0 00 (1 9) $3 00 ,0 00 (2 0) C on tin ui ng P ro je ct - Se e J- 11 T ab le

Next: Summary of TCRP Project D-7 Status »
TCRP Annual Report of Progress 2019 Get This Book
×
 TCRP Annual Report of Progress 2019
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s Transit Cooperative Research Program (TCRP) has released its annual report, which provides background and an overview of the program, status of each of TCRP’s projects, and a summary of some of the program's accomplishments for the year.

In FY 2019, TCRP produced 11 publications, including 5 research reports and 6 syntheses, bringing the total to more than 699 publications since the inception of the program. In the period from August 1992 (when the first TCRP grant was received) through December 2019, approximately 803 study activities have been authorized and more than 699 publications have been issued.

TCRP focuses on issues significant to the public transportation industry, with emphasis on developing near-term research solutions to a variety of transit problems involving facilities, vehicles, equipment, service concepts, operations, policy, planning, human resources, maintenance, and administrative practices.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!