Page 85
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 85
Page 86
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 86
Page 87
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 87
Page 88
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 88
Page 89
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 89
Page 90
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 90
Page 91
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 91
Page 92
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 92
Page 93
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 93
Page 94
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 94
Page 95
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 95
Page 96
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 96
Page 97
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 97
Page 98
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 98
Page 99
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 99
Page 100
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 100
Page 101
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 101
Page 102
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 102
Page 103
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 103
Page 104
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 104
Page 105
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 105
Page 106
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 106
Page 107
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 107
Page 108
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 108
Page 109
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 109
Page 110
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 110
Page 111
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 111
Page 112
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 112
Page 113
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 113
Page 114
Suggested Citation:"Appendix C - Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions." National Academies of Sciences, Engineering, and Medicine. 2020. Proposed AASHTO Guides for Bridge Preservation Actions. Washington, DC: The National Academies Press. doi: 10.17226/26013.
×
Page 114

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

85 Table 24 contains the context of actions, Table 25 contains performance of actions, and Table 26 contains cost of preservation actions. A P P E N D I X C Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions Component Activity Detail Info State DOT ID Average Age at Action Year GCR Approach Overlay Methacrylate hist CA 52 34.6 Deck 5.39 Approach Repair Mudjack hist OR 42.9 Deck 6.43 Approach Repair Mudjack hist CA 50 34.2 Deck 5.58 Approach Repair Pavement hist PA 40-RDPAVMT 38.9 Deck 6.07 Approach Repair Roadway hist CA 58 40.4 Deck 5.73 Approach Repair Slab hist CA 51 37.6 Deck 5.24 Approach Replace Slab hist CA 53 36.1 Deck 5.47 Approach Retrofit Relief joint hist PA 41-RDRLFJT 23.1 Deck 6.53 Bearing Clean hist CA 40 45.5 Super 6.07 Bearing Clean hist PA 8-C743102 38.9 Super 5.54 Bearing Paint hist WI 13.3 Super 6.67 Bearing Rehab hist CA 42 39.3 Super 6.26 Bearing Rehab Seat hist PA 45-D744503 38.5 Super 5.6 Bearing Rehab Steel hist PA 44-A744501 34.6 Super 5.78 Bearing Repair hist MI 515 41.1 Super 5.86 Bearing Repair hist OR 42.8 Super 6.27 Bearing Repair hist CA 41 42.6 Super 6.4 Bearing Repair Expansion hist PA 68-C744502 30.4 Super 5.99 Bearing Repair Lubricate hist PA 66-A743501 31.1 Super 6.13 Bearing Repair Miscellaneous hist WI 17.9 Super 7.2 Bearing Replace hist CA 43 32.2 Super 6.52 Bearing Replace hist MI 513 39 Super 5.65 Bearing Replace hist OR 42.4 Super 6 Bearing Replace hist WI 28 Super 6.83 Bridge Clean hist OH 6151 31.5 Deck 6.46 Bridge Clean hist OR 57.8 Deck 5.5 Bridge Clean Graffiti hist OH 6225 27.1 Substr 6.79 Bridge Clean Part hist OR 46.4 Super 6.25 Bridge Paint hist MI 133 32.6 Super 5.41 Bridge Paint hist NY 39.8 Super 6.5 Bridge Paint hist OH 6152 28.6 Super 6.68 Bridge Paint hist WI 23.4 Super 6.64 Bridge Paint Full hist OR 45 Super 5.71 Table 24. Context of actions. (continued on next page)

86 Proposed AASHTO Guides for Bridge Preservation Actions Bridge Paint Partial hist MI 233 34 Super 5.66 Bridge Paint Spot hist OR 50.9 Super 6.14 Bridge Paint Zone hist MI 433 39.5 Super 5.56 Bridge Paint Zone hist OR 42.2 Super 5.64 Bridge Reconstr hist MI 138 30.3 Super 5.21 Bridge Repair hist WI 29.2 Super 6.16 Bridge Repair Preventive hist WI 21.2 Super 7.24 Bridge Repair Spalls hist OH 6163 37.3 Deck 5.88 Bridge Replace hist MI 351 47.2 Super 4.49 Bridge Retrofit Betterment hist OH 6351 31.9 Super 6.56 Bridge Retrofit Widen hist WI 25.7 Super 6.38 Bridge Seal Concrete hist WI 21.2 Super 7.27 Channel Clean hist OH 6164 29.8 Channel 6.24 Channel Clean hist OR 47 Channel 4 Channel Clean Debris hist PA 3-ECREMVG 43 Channel 5.41 Channel Clean Deposit, remove hist PA 12-ECREMDP 44.1 Channel 5.26 Channel Repair hist OR 43.8 Channel 5.81 Channel Repair Scour hist WI 27.2 Channel 6 Channel Repair Scour hole hist PA 11-C745301 49.5 Channel 5.01 Channel Repair Scour protection hist MI 420 52.2 Channel 6 Channel Retrofit Protection hist OH 6160 37 Channel 6.14 Channel Retrofit Riprap hist WI 21.8 Channel 5.5 Channel Retrofit Slope Protect hist MI 508 39.5 Channel 6.15 Culvert Repair Barrel hist PA 48-C745203 71.3 Culvert 5.78 Culvert Replace Apron hist PA 63-B745202 31.2 Culvert 5.83 Culvert Replace Headwall hist PA 29-A745201 64.4 Culvert 5.73 Culvert Retrofit hist MI 127 31.8 Culvert 7 Culvert Retrofit Betterment hist OH 6343 36.8 Culvert 3 Deck Clean hist PA 23-A743101 34.2 Deck 6.14 Deck Clean Scupper hist PA 1-B743101 37.8 Deck 5.97 Deck Overlay hist CA 5 38.1 Deck 4.56 Deck Overlay hist MI 131 32.6 Deck 5.46 Deck Overlay hist NY 30.4 Deck 6.47 Deck Overlay hist OR 43.7 Deck Deck Overlay hist WI 26.1 Deck 5.61 Deck Overlay hist OR 41.1 Deck 6.39 Deck Overlay hist OR 44.5 Deck 5.72 Deck Overlay Bituminous hist WI 24.3 Deck 5.8 Deck Overlay Concrete hist IL 8048, B 34.4 Deck 5 Deck Overlay Epoxy hist OR 42.7 Deck 5.72 Deck Overlay Epoxy hist WI 17.1 Deck 6.81 Deck Overlay HMA hist MI 443 41.2 Deck 4.95 Deck Overlay Latex-modified hist IL 8022, C 34.4 Deck 5.73 Deck Overlay Microsilica concrete hist IL 8022, F 28.8 Deck 5.34 Deck Overlay Plasticized dense concrete hist IL 8022, E 31 Deck 6.2 Deck Overlay Polymer hist WI 25.2 Deck 6.64 Deck Overlay Resurface hist CA 4 40.1 Deck 5.04 Deck Overlay Shallow hist MI 417 48.4 Deck 5.17 Deck Overlay Thin epoxy hist MI 418 16.1 Deck 6.19 Deck Paint hist PA 80-A743401 28.6 Deck 6.4 Deck Rehab hist CA 3 38.7 Deck 4.95 Component Activity Detail Info State DOT ID Average Age at Action Year GCR Table 24. (Continued).

Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions 87 Deck Rehab hist NY 38.8 Deck 6.06 Deck Repair hist CA 9 32 Deck 5.87 Deck Repair hist MI 530 26.1 Deck 5.38 Deck Repair hist OH 6153 36.7 Deck 5.92 Deck Repair hist OR 50 Deck 6.2 Deck Repair hist WI 19.3 Deck 5.98 Deck Repair hist WI 28.5 Deck 5.91 Deck Repair Concrete hist PA 6-D744303 41.8 Deck 5.64 Deck Repair HMA hist PA 10-BITWRGS 53.2 Deck 5.37 Deck Repair Patch hist CA 1 41.4 Deck 5.27 Deck Repair Patch overlay hist MI 419 37.5 Deck 5.78 Deck Repair Pothole hist CA 2 42.4 Deck 5.31 Deck Replace hist CA 7 36.8 Deck 2.91 Deck Replace hist WI 35.5 Deck 4.85 Deck Replace + Railing hist WI 34 Deck 6 Deck Replace Full or partial hist MI 130 40 Deck 4.32 Deck Replace Grid hist PA 37-C744302 49.4 Deck 4.82 Deck Replace Median hist MI 122 14.8 Deck 4 Deck Replace Membrane hist OR 46.5 Deck 6.39 Deck Replace Timber hist OR 55 Deck 5.4 Deck Replace Timber hist PA 35-B744301 54.8 Deck 5.03 Deck Replace Widen hist WI 34.3 Deck 4.97 Deck Retrofit Overlay widen hist WI 25.7 Deck 5.75 Deck Seal hist NY 29.7 Deck 6.94 Deck Seal hist OR 29.8 Deck 5.93 Deck Seal hist OH 6161 30.3 Deck 6.58 Deck Seal Epoxy hist OR 20.1 Deck 5.5 Deck Seal Methacrylate hist CA 6 34.2 Deck 4.66 Drain Replace Downspout hist PA 14-C744402 62.3 Deck 5.73 Drain Replace Scupper hist PA 52-DRNGRAT 29.8 Deck 6.35 Drain Retrofit Extend scupper hist OH 6165 37 Deck 6.13 Drain Retrofit Scupper hist PA 31-B744401 65.5 Deck 5.39 Joint Rehab Comp seal hist PA 33-B744102 27.5 Deck 6.32 Joint Rehab Modular hist PA 53-C744102 29.7 Deck 5.93 Joint Rehab Other hist PA 9-E744102 31.4 Deck 6.13 Joint Repair hist CA 30 33.8 Deck 5.44 Joint Repair hist OH 6154 34 Deck 6.24 Joint Repair hist PA 4-A744101 33 Deck 6.07 Joint Repair hist WI 15.4 Deck 6.69 Joint Repair All hist OR 36.5 Deck 6.28 Joint Repair Compression hist OR 27.5 Deck 6.5 Joint Repair Modular hist OR 30.2 Deck 6.33 Joint Repair Plug hist OR 31 Deck 6.73 Joint Repair Pourable hist OR 38.6 Deck 6.1 Joint Repair Reseal hist PA 2-A743301 29.4 Deck 6.24 Joint Repair Seal hist OR 48.9 Deck 6.25 Joint Replace hist CA 32 41.8 Deck 5.83 Joint Replace hist OR 32.3 Deck 6.11 Joint Replace hist WI 22.3 Deck 6.75 Joint Replace Compression hist OR 40 Deck 5.6 Joint Replace Plug hist OR 44 Deck 6.25 Component Activity Detail Info State DOT ID Average Age at Action Year GCR Table 24. (Continued). (continued on next page)

88 Proposed AASHTO Guides for Bridge Preservation Actions Joint Replace Steel dam hist PA 20-D744102 42 Deck 5.69 Joint Replace Strip hist MI 430 34.1 Deck 5.63 Railing Paint hist WI 22.7 Deck 6.5 Railing Rehab hist CA 61 40.9 Deck 5.7 Railing Repair hist CA 60 41.2 Deck 5.9 Railing Repair hist MI 532 33.6 Deck 5.9 Railing Repair hist OH 6157 35.6 Deck 6.17 Railing Repair hist OR 41 Deck 7.25 Railing Repair hist WI 14.5 Deck 6.17 Railing Replace hist OR 45 Deck 5.89 Railing Replace hist WI 25.5 Deck 6.38 Railing Replace Thrie hist MI 132 27.4 Deck 5.24 Railing Retrofit hist CA 62 45.8 Deck 6.12 Substructure Clean Debris hist CA 27 43.2 Substr 6.6 Substructure Paint hist PA 5-B743401 28.4 Substr 6.49 Substructure Paint Full hist PA 79-D743201 63.2 Substr 4.64 Substructure Paint Spot hist PA 16-B743201 37.8 Substr 5.75 Substructure Rehab hist CA 23 39 Substr 6.16 Substructure Repair hist MI 537 37.3 Substr 5.46 Substructure Repair hist OH 6155 35.3 Substr 6.25 Substructure Repair hist OR 52.4 Substr 5.13 Substructure Repair hist WI 16.4 Substr 6.21 Substructure Repair Abutment hist PA 28-B744802 46 Substr 5.45 Substructure Repair Epoxy Inject hist CA 21 44.2 Substr 6.46 Substructure Repair Navigation protection hist CA 26 43.4 Substr 6.7 Substructure Repair Patch hist CA 20 39.6 Substr 6.39 Substructure Repair Pier hist PA 32-D744802 36.2 Substr 5.57 Substructure Repair Pile hist OR 58 Substr 4.86 Substructure Repair Repoint hist PA 19-F744804 57.8 Substr 5.02 Substructure Repair Timber hist OR 57.4 Substr 4.94 Substructure Repair Underwater hist MI 134 21.5 Substr Substructure Repair Wings miscellaneous hist WI 23.2 Substr 6.2 Substructure Replace hist CA 24 46.3 Substr 5.5 Substructure Replace hist OR 58.7 Substr 4.74 Substructure Replace hist WI 41.5 Substr 6 Substructure Replace Partial hist OR 58.2 Substr 4.9 Substructure Replace Timber hist OR 61.9 Substr 4.5 Substructure Replace Wingwall hist WI 28.3 Substr 6.41 Substructure Retrofit Pier crash wall hist WI 37.8 Substr 6.5 Substructure Seal hist OH 6162 30.3 Substr 6.59 Superstructure Clean hist OR 49.2 Super 5.93 Superstructure Clean Steel horizonal surface hist PA 34-D743102 37.5 Super 5.74 Superstructure Paint Full hist PA 65-C743201 50.7 Super 4.8 Superstructure Paint Spot hist PA 57-A743201 38.2 Super 5.72 Superstructure Rehab hist CA 11 40.2 Super 5.53 Superstructure Rehab Stringer RC hist PA 42-A744603 42.3 Super 5.44 Superstructure Repair hist OR 45.6 Super 5.87 Superstructure Repair hist WI 67.7 Super 5.39 Superstructure Repair Beam hist MI 554 35.1 Super 4.89 Superstructure Repair Beam end hist NY 46.6 Super 5.65 Superstructure Repair Epoxy inject hist CA 13 37.9 Super 6.64 Component Activity Detail Info State DOT ID Average Age at Action Year GCR Table 24. (Continued).

Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions 89 Superstructure Repair Fatigue hist OR 44.3 Super 5.85 Superstructure Repair Patch hist CA 10 38 Super 6.43 Superstructure Repair Pin/hanger hist MI 136 32.3 Super 5.25 Superstructure Replace hist CA 12 40.7 Super 5.48 Superstructure Replace hist MI 137 46.4 Super 4.46 Superstructure Replace hist OR 73 Super 5.25 Superstructure Replace hist WI 31.6 Super 5.36 Superstructure Replace Beam hist MI 556 39.1 Super Superstructure Replace Steel stringer hist PA 25-A744602 52.7 Super 4.59 Superstructure Replace Timber hist PA 60-B744601 52.5 Super 5.19 Superstructure Replace Timber stringer hist PA 62-A744601 33.1 Super 6.17 Superstructure Retrofit Strengthen hist CA 14 58 Super 5.4 GCR = general condition rating. GCRpre = general condition rating before preservation. hist = history. Component Activity Detail Info State DOT ID Average Age at Action Year GCR Table 24. (Continued). Component Activity Detail Info Type State DOT ID Average Values Det Rate GCR/Year Action Interval Year Service Life Year Approach Repair Mudjack hist CA 50 0.471 0.109 1.39 14.5 Approach Repair Pavement hist PA 40- RDPAVMT 0.172 0.129 0.111 5.28 Approach Repair Roadway hist CA 58 0.687 0.0268 10.2 Approach Repair Slab hist CA 51 0.941 0.05 2 11.8 Approach Replace Slab hist CA 53 0.997 0.0722 1.18 17.8 Approach Retrofit Relief joint hist PA 41- RDRLFJT 0.0921 0.0849 5.68 Approach Seal Methacrylate hist CA 52 0.517 0.0674 18.1 Bearing Clean hist CA 40 0.242 0.0485 15.1 Bearing Clean hist PA 8- C743102 0.12 0.148 3.71 Bearing Clean Lubricate hist PA 66- A743501 0 0.194 4.07 Bearing Paint hist WI 1.5 0.0492 6 49.3 Bearing Rehab hist CA 42 0.164 0.0431 3.5 23.6 Bearing Rehab Seat hist PA 45- D744503 0.1 0.175 2.88 Bearing Rehab Steel hist PA 44- A744501 0.189 0.159 4.39 Bearing Repair hist MI 515 0.308 Bearing Repair hist OR 0 0.25 2 Bearing Repair hist CA 41 0.2 Bearing Repair Expansion hist PA 68- C744502 0 0.171 4.19 Bearing Repair Miscellaneous hist WI 0 0.0598 63.9 Bearing Replace hist CA 43 0.196 0.0151 26 Bearing Replace hist MI 513 1.39 0.0649 10.5 41 Bearing Replace hist OR 1 Bearing Replace hist WI 0.121 0.0388 3.6 61.8 Bridge Clean hist OH 6151 0.17 0.0444 2.79 26.5 Table 25. Performance of actions. (continued on next page)

90 Proposed AASHTO Guides for Bridge Preservation Actions Component Activity Detail Info Type State DOT ID Average Values Det Rate GCR/Year Action Interval Year Service Life Year Bridge Clean hist OR 0 Bridge Clean Graffiti hist OH 6225 0.242 0.0551 1.69 20.1 Bridge Clean Partial hist OR 0 Bridge Paint hist MI 133 1.24 0.0568 17.2 43.7 Bridge Paint hist NY 1.17 0.156 9.75 19.5 Bridge Paint hist OH 6152 0.13 0.0438 2.41 32.2 Bridge Paint hist WI 0.569 0.0627 6.42 51.2 Bridge Paint Full hist OR 0.273 0.375 2 Bridge Paint Partial hist MI 233 0.572 0.0521 4.83 27.8 Bridge Paint Spot hist OR 0 -1 2 Bridge Paint Zone hist MI 433 0.754 0.0489 6.05 23.5 Bridge Paint Zone hist OR 0.5 Bridge Rehab hist MI 138 0.929 0.108 21.5 30.8 Bridge Remove Spalls hist OH 6163 0.114 0.0532 1.55 14.7 Bridge Repair hist WI 0.194 0.0767 1.25 28.7 Bridge Repair Preventive hist WI 0 Bridge Replace hist MI 351 3.24 0.089 30.4 41.7 Bridge Replace hist WI 0 0.0638 87.5 Bridge Retrofit Betterment hist OH 6351 0.427 0.0509 10 43.2 Bridge Retrofit Widen hist WI 0.696 0.0575 7.73 38.2 Bridge Seal Concrete hist WI 0.0357 0.0491 72.9 Channel Clean hist OH 6164 0.285 0.0616 3.7 25 Channel Clean Debris hist PA 3- ECREMVG 0.166 0.166 0.25 3.87 Channel Clean Deposit, remove hist PA 12- ECREMDP 0.177 0.151 3.68 Channel Repair hist OR 0.125 0.167 2 Channel Repair Scour hole hist PA 11- C745301 0.183 0.171 0.75 3.46 Channel Repair Scour protection hist MI 420 0.729 0.0486 12.5 33 Channel Retrofit Protection hist OH 6160 0.471 0.0594 4.42 11.7 Channel Retrofit Riprap hist WI 1.67 0.0333 70 56 Channel Retrofit Slope protect hist MI 508 0.588 0.0508 10.9 27.2 Culvert Repair Barrel hist PA 48- C745203 0.5 0.219 5.33 Culvert Replace Apron hist PA 63- B745202 1 0.5 5.2 Culvert Replace Headwall hist PA 29- A745201 0.1 0.0632 4.8 Culvert Retrofit hist MI 127 0 Culvert Retrofit Betterment hist OH 6343 3 0.0769 39 26 Deck Clean hist PA 23- A743101 0.213 0.119 0.773 5.47 Deck Clean Scupper hist PA 1- B743101 0.13 0.0913 4.47 Deck Coat hist PA 80- A743401 0 0.295 5.52 Deck Overlay hist CA 5 1.76 0.0571 6.31 11.3 Table 25. (Continued).

Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions 91 Component Activity Detail Info Type State DOT ID Average Values Det Rate GCR/Year Action Interval Year Service Life Year Deck Overlay hist MI 131 0.954 0.0599 12.9 30.4 Deck Overlay hist NY 0.315 0.0891 0.556 10.8 Deck Overlay hist OR 0.087 0.0588 6 Deck Overlay hist OR 0 0.0714 4 Deck Overlay hist WI 1.54 0.0851 13.7 34 Deck Overlay All hist OR 0.244 0.0357 6 Deck Overlay Bituminous hist MI 443 0.442 0.0536 7.51 27 Deck Overlay Bituminous hist WI 0.52 0.0462 10.7 38.7 Deck Overlay Concrete hist IL 8048, B 1 0.118 17 27.5 Deck Overlay Epoxy hist OR 0 Deck Overlay Epoxy hist WI 0.288 0.0999 2.36 18.2 Deck Overlay Latex- modified hist IL 8022, C 0.667 0.0705 9.78 25.4 Deck Overlay Microsilica concrete hist IL 8022, F 0.831 0.0762 9.76 25.2 Deck Overlay Plasticized dense concrete hist IL 8022, E 0.5 0.0459 44.2 Deck Overlay Polymer hist WI 0.892 0.05 1 4 Deck Overlay Resurface hist CA 4 1.35 0.0516 3.12 8.62 Deck Overlay Shallow hist MI 417 1.56 0.0588 6 8 Deck Overlay Thin epoxy hist MI 418 0.867 0.167 4.2 9.4 Deck Rehab hist CA 3 1.33 0.0527 10.2 16.3 Deck Rehab hist NY 0.312 0.204 1.86 8.61 Deck Repair hist CA 9 0.864 0.0427 12.4 24.8 Deck Repair hist MI 530 0.857 0.0906 17 39.1 Deck Repair hist OH 6153 0.161 0.0578 3.01 17.5 Deck Repair hist OR 0 0.167 2 Deck Repair hist WI 0.848 0.0453 23.8 59.7 Deck Repair hist WI 0.5 0.0564 3.11 17.8 Deck Repair Concrete hist PA 6- D744303 0.19 0.141 0.158 3.88 Deck Repair HMA surface hist PA 10- BITWRGS 0.0597 0.134 3.47 Deck Repair Patch hist CA 1 0.787 0.0677 2.25 8.71 Deck Repair Patch hist MI 419 0.462 0.05 3.95 24.3 Deck Repair Pothole hist CA 2 0.648 0.0436 2.64 13.3 Deck Replace hist CA 7 3.5 0.0588 16 19.5 Deck Replace hist WI 3.2 0.0917 30.1 48.1 Deck Replace + Railing hist WI 3 0.25 12 20 Deck Replace Full or partial hist MI 130 3.15 0.0922 36.2 38.9 Deck Replace Grid hist PA 37- C744302 0.365 0.201 1.89 Deck Replace Median hist MI 122 1 0.0476 42 Deck Replace Membrane hist OR 0.115 Deck Replace Timber hist OR 0 -1 2 Deck Replace Timber hist PA 35- B744301 0.2 0.395 2.38 Deck Replace Widen hist WI 3.36 0.121 24.2 31.6 Table 25. (Continued). (continued on next page)

92 Proposed AASHTO Guides for Bridge Preservation Actions Component Activity Detail Info Type State DOT ID Average Values Det Rate GCR/Year Action Interval Year Service Life Year Deck Retrofit Overlay, widen hist WI 1.75 0.0308 40 77 Deck Seal hist NY 0.0735 0.0731 14.2 Deck Seal hist OH 6161 0.131 0.0516 0.784 22.5 Deck Seal hist OR 0.0676 0.0179 1 Deck Seal Epoxy hist OR 0 Deck Seal Methacrylate hist CA 6 1.91 0.0224 11.5 16.7 Drain Replace Downspout hist PA 14- C744402 0.198 0.0901 4.85 Drain Replace Scupper hist PA 52- DRNGRAT 0 0.252 5.52 Drain Retrofit Extend scupper hist OH 6165 0.206 0.0396 2 21.3 Drain Retrofit Scupper hist PA 31- B744401 0.211 0.0957 3.24 Joint Rehab Comp seal hist PA 33- B744102 0.0714 0.0602 5.25 Joint Rehab Modular hist PA 53- C744102 0 Joint Rehab Other hist PA 9- E744102 0.0392 0.102 4.95 Joint Repair hist CA 30 1.06 0.0342 8.5 19.5 Joint Repair hist OH 6154 0.179 0.0483 2.88 20 Joint Repair hist OR 0.208 0.115 5 Joint Repair hist PA 4- A744101 0.0782 0.0884 5.06 Joint Repair hist WI 0.2 0.0368 5.14 57.1 Joint Repair Compression hist OR 0 Joint Repair Modular hist OR 0 0.333 9 Joint Repair Plug hist OR 0 Joint Repair Pourable hist OR 0 Joint Repair Reseal hist PA 2- A743301 0.185 0.103 0.5 5.12 Joint Repair Seal hist OR 0.5 Joint Replace hist CA 32 0.812 0.164 2.38 8.98 Joint Replace hist OR 0.0833 0.0556 6 Joint Replace hist WI 0.467 0.0429 4.87 39.4 Joint Replace Compression hist OR 0 Joint Replace Plug hist OR 0 Joint Replace Steel dam hist PA 20- D744102 0.155 0.0882 2.77 Joint Replace Strip hist MI 430 0.641 0.0536 7.29 24.6 Railing Paint hist WI 0 0.136 17.2 Railing Rehab hist CA 61 0.249 0.0455 3.14 20.4 Railing Repair hist CA 60 0.588 0.0607 4 19.4 Railing Repair hist MI 532 0.3 0.0699 3 39.5 Railing Repair hist OH 6157 0.219 0.0454 4.23 22.2 Railing Repair hist OR 0 Railing Repair hist WI 0.333 0.0854 4.75 40.6 Table 25. (Continued).

Detailed Information on the Context, Performance, and Cost of Bridge Preservation Actions 93 Component Activity Detail Info Type State DOT ID Average Values Det Rate GCR/Year Action Interval Year Service Life Year Railing Replace hist OR 0 0.333 0 3 Railing Replace hist WI 1.06 0.0664 4.5 42 Railing Replace Thrie hist MI 132 1.16 0.0766 14.1 32.6 Railing Retrofit hist CA 62 0.529 0.0613 3.44 20.2 Substructure Clean Debris hist CA 27 0.448 Substructure Coat hist PA 5- B743401 0.0333 0.158 5.44 Substructure Paint Full hist PA 79- D743201 0 Substructure Paint Spot hist PA 16- B743201 0 0.093 4 Substructure Rehab hist CA 23 0.508 0.0312 2.29 13.7 Substructure Repair hist MI 537 1.17 0.0466 14.8 28 Substructure Repair hist OH 6155 0.191 0.0337 3.48 24 Substructure Repair hist OR 0.25 0.167 3 Substructure Repair hist WI 0.211 0.0298 4.67 58.8 Substructure Repair Abutment hist PA 28- B744802 0.17 0.138 4.21 Substructure Repair Inject epoxy hist CA 21 0.273 0.0341 0.667 15 Substructure Repair Navigation protection hist CA 26 0.3 Substructure Repair Patch hist CA 20 0.133 0.0211 13.7 Substructure Repair Pier hist PA 32- D744802 0.266 0.15 4.23 Substructure Repair Pile hist OR 0 Substructure Repair Repoint hist PA 19- F744804 0.221 0.178 3.38 Substructure Repair Timber hist OR 0 Substructure Repair Underwater hist MI 134 0 Substructure Repair Wings miscellaneous hist WI 0.278 0.0186 6.33 29.3 Substructure Replace hist CA 24 0 Substructure Replace hist OR 0.56 0.0357 6 Substructure Replace hist WI 0.75 Substructure Replace Partial hist OR 0.308 0.0833 6 Substructure Replace Timber hist OR 0.667 Substructure Replace Wingwall hist WI 0.412 0.0286 8 32.7 Substructure Retrofit Pier crash wall hist WI 0.05 Substructure Seal hist OH 6162 0.112 0.0336 2.96 20.8 Superstructure Clean hist OR 0 Superstructure Clean Steel horizontal surface hist PA 34- D743102 0.16 0.146 5.21 Superstructure Paint Full hist PA 65- C743201 0 0.196 2.85 Superstructure Paint Spot hist PA 57- A743201 0.333 0.136 4.23 Superstructure Rehab hist CA 11 0.715 0.0342 9.33 26.9 Table 25. (Continued). (continued on next page)

94 Proposed AASHTO Guides for Bridge Preservation Actions Component Activity Detail Info Type State DOT ID Average Values Det Rate GCR/Year Action Interval Year Service Life Year Superstructure Rehab Stringer RC hist PA 42- A744603 0.151 0.168 4 Superstructure Repair hist OR 0.174 0.0435 3 Superstructure Repair hist WI 1.3 0.0353 11.6 55.9 Superstructure Repair Beam hist MI 554 1.22 0.0634 12.7 23.7 Superstructure Repair Beam End hist NY 0.0714 0.333 6.33 Superstructure Repair Epoxy inject hist CA 13 0.25 Superstructure Repair fatigue hist OR 0 Superstructure Repair Patch hist CA 10 0.364 Superstructure Repair Pin/hanger hist MI 136 1.26 0.0531 16.2 36.2 Superstructure Replace hist CA 12 1.12 0.0442 21.8 29.6 Superstructure Replace hist MI 137 3.18 0.0817 46.8 50.7 Superstructure Replace hist OR 0 Superstructure Replace hist WI 2.76 0.0901 26.7 51.2 Superstructure Replace Beam hist MI 556 0 Superstructure Replace Steel stringer hist PA 25- A744602 0.191 0.202 1.92 Superstructure Replace Timber hist PA 60- B744601 0 0.233 2.29 Superstructure Replace Timber stringer hist PA 62- A744601 0 0.297 3.85 Superstructure Retrofit Strengthen hist CA 14 1.4 Det Rate = deterioration rate. GCR = general condition rating. hist = history. Table 25. (Continued).

Component Activity Detail Info State DOT ID Unit Unit Cost $ Approach Overlay HMA advice CA 52 SF 1.30 Approach Overlay Methacrylate hist CA 52 Deck SF 1.53 Approach Overlay Polyester advice CA 52 SF 16.00 Approach Rehab RC advice NY 321 SF 199.00 Approach Repair Mudjack hist CA 50 Deck SF 0.25 Approach Repair Mudjack hist OR Deck SF 8.55 Approach Repair Mudjacking, >2 inch advice CT 8 CY 2,268.00 Approach Repair Mudjacking, 0 to 2-inch lift adv mod CT 8 SF 71.91 Approach Repair Mudjacking, 0 to 2-inch lift advice CT 8 SY 647.00 Approach Repair Pavement hist PA 40- RDPAVMT Deck SF 0.92 Approach Repair Pavement advice CA 58 Ea Loc 1,500.00 Approach Repair RC advice NY 321 SF 11.92 Approach Repair Roadway hist CA 58 Deck SF 0.77 Approach Repair Slab hist CA 51 Deck SF 0.387 Approach Replace advice CA 53 Ea Slab/Ln 2,500.00 Approach Replace PS advice NY 320 SF 96.98 Approach Replace RC advice NY 321 SF 104.00 Approach Replace Slab hist CA 53 Deck SF 4.35 Approach Retrofit Relief joint hist PA 41-RDRLFJT Deck SF 0.76 Approach Seal Methacrylate advice CA 52 SF 0.93 Bearing Clean hist PA 8-C743102 Deck SF 0.22 Bearing Clean hist CA 40 Deck SF 0.49 Bearing Clean Lubricate hist PA 66-A743501 Deck SF 0.91 Bearing Paint hist WI Deck SF 0.73 Bearing Rehab hist CA 42 Deck SF 0.62 Bearing Rehab advice VA EA 3,463.00 Bearing Rehab Elastomeric advice NY 310 EA 5,100.00 Bearing Rehab Fixed advice NY 313 EA 5,606.00 Bearing Rehab Movable advice NY 311 EA 4,423.00 Table 26. Cost of preservation actions, state DOTs. (continued on next page)

Component Activity Detail Info State DOT ID Unit Unit Cost $ Bearing Rehab Pot advice NY 314 EA 4,159.00 Bearing Rehab Seat hist PA 45-D744503 Deck SF 2.58 Bearing Rehab Steel hist PA 44-A744501 Deck SF 2.21 Bearing Repair hist OR Deck SF 0.86 Bearing Repair hist CA 41 Deck SF 2.91 Bearing Repair Bridge crew advice CA 41 Ea 2,500.00 Bearing Repair Disk advice NY 315 EA 10.67 Bearing Repair Elastomeric advice NY 310 EA 691.00 Bearing Repair Fixed advice NY 313 EA 1,482.00 Bearing Repair Maintenance contract advice CA 41 Ea 8,640.00 Bearing Repair Miscellaneous hist WI Deck SF 6.21 Bearing Repair Movable advice NY 311 EA 1,305.00 Bearing Repair Other advice NY 316 EA 167.00 Bearing Repair Pot advice NY 314 EA 621.00 Bearing Replace hist WI Deck SF 7.14 Bearing Replace hist CA 43 Deck SF 9.41 Bearing Replace advice CA 43 EA 3,000.00 Bearing Replace advice CA 43 EA 8,640.00 Bearing Replace Elastomeric advice NY 310 EA 3,452.00 Bearing Replace Fixed advice NY 313 EA 3,927.00 Bearing Replace Movable advice NY 311 EA 3,868.00 Bearing Replace Pot advice NY 314 EA 4,233.00 Bearing Reset Expansion hist PA 68-C744502 Deck SF 3.62 Bridge Clean hist OH 6151 Deck SF 0.04 Bridge Clean hist OR Deck SF 3.29 Bridge Clean hist OR Deck SF 5.70 Bridge Clean Bridge cleaning, Crew: Supervisor + two workers advice CT 12 Hour 195.00 Bridge Clean Concrete remove coating adv mod OH 512E74000 SF 1.21 Bridge Clean Concrete remove coating advice OH 512E74000 SY 10.87 Bridge Clean Excavation of sediment advice CT 14 Hour 203.00 Bridge Clean Graffiti hist OH 6225 Deck SF 0.036 Bridge Clean Partial hist OR Deck SF 0.30 Table 26. (Continued).

Component Activity Detail Info State DOT ID Unit Unit Cost $ Bridge Clean Steel surface prep advice OH 514E00052 SF 9.97 Bridge Clean Steel surface prep advice OH 514E00102 LS 192,452.00 Bridge Clean Vegetation advice CA RV Days 2,600.00 Bridge Inspect Paint advice OH 514E10000 EACH 298.00 Bridge Maintain Preventive hist WI Deck SF 0.60 Bridge Paint hist OH 6152 Deck SF 0.14 Bridge Paint hist WI Deck SF 16.80 Bridge Paint advice CA 99 Days 2,600.00 Bridge Paint advice OH 514E99000 LS 163,652.00 Bridge Paint Full advice CA 93 SF 35.00 Bridge Paint Full hist OR Deck SF 69.00 Bridge Paint Miscellaneous advice OH 514E27700 SF 17.15 Bridge Paint Miscellaneous advice OH 514E27710 FT 23.45 Bridge Paint Miscellaneous advice OH 514E27702 EACH 693.00 Bridge Paint Miscellaneous advice OH 514E27800 LS 52,251.00 Bridge Paint Spot hist OR Deck SF 0.388 Bridge Paint Spot advice CA 92 SF 13.00 Bridge Paint Spot advice CA 92 SF 15.00 Bridge Paint Spot advice CA 91 SF 80.00 Bridge Paint Steel advice OH 514E80110 LS 25,650.00 Bridge Paint Steel damaged advice OH 514E20001 SF 5,454.00 Bridge Paint Steel finish coat advice OH 514E00850 LB 0.17 Bridge Paint Steel finish coat advice OH 514E00068 SF 2.26 Bridge Paint Steel finish coat advice OH 514E00400 LS 19,817.00 Bridge Paint Steel intermediate coat advice OH 514E00800 LB 0.17 Bridge Paint Steel intermediate coat advice OH 514E00062 SF 3.21 Bridge Paint Steel intermediate coat advice OH 514E00302 LS 30,159.00 Bridge Paint Steel prime coat advice OH 514E00058 SF 3.73 Bridge Paint Steel prime coat advice OH 514E00202 LS 30,894.00 Bridge Paint Steel, shop advice OH 514E80100 SF 20.29 Bridge Paint Steel touch-up shop advice OH 514E80010 LB 32.88 Bridge Paint Zone hist OR Deck SF 45.40 Bridge Rehab Coating Steel advice NY 515 SF 36.45 (continued on next page)

Component Activity Detail Info State DOT ID Unit Unit Cost $ Bridge Remove Spalls hist OH 6163 Deck SF 0.09 Bridge Repair hist WI Deck SF 23.40 Bridge Repair 7a. Hot tar pourable sealant advice CT 7 Hour 225.00 Bridge Repair 7b. Self-leveling cold applied sealant advice CT 7 Hour 206.00 Bridge Repair Coating Steel advice NY 515 SF 3.23 Bridge Repair Concrete haunch removal, >1,000 LF advice CT 13 LF 47.05 Bridge Repair Concrete haunch removal, 0 to 50 LF advice CT 13 LF 185.00 Bridge Repair Concrete haunch removal, 250 to 1,000 LF advice CT 13 LF 55.45 Bridge Repair Concrete haunch removal, 50 to 250 LF advice CT 13 LF 92.45 Bridge Repair Concrete repairs, intricate or ornamental advice CT 2 Hour 188.00 Bridge Repair Concrete, complete-in-place: 0 to 25 CF advice CT 1 CF 589.00 Bridge Repair Concrete, complete-in-place: 100.01 to 200 CF advice CT 1 CF 364.00 Bridge Repair Concrete, complete-in-place: 25.01 to 100. CF advice CT 1 CF 438.00 Bridge Repair Concrete, complete-in-place: greater than 200.01 CF advice CT 1 CF 304.00 Bridge Repair Heavy carpentry, crew: supervisor + two workers advice CT 10 Hour 188.00 Bridge Repair Material for concrete repair, self-leveling cold applied sealant (902rc) advice CT 4 Kit 78.60 Bridge Repair Material for concrete repair, Class A concrete advice CT 4 CY 286.00 Bridge Repair Material for concrete repair, Class F concrete advice CT 4 CY 286.00 Bridge Repair Material for concrete repair, Class S concrete advice CT 4 CY 290.00 Bridge Repair Material for concrete repair, HMA S0.375 in. advice CT 4 Ton 281.00 Bridge Repair Material for concrete repair, HMA S0.50 In. advice CT 4 Ton 281.00 Bridge Repair Material for concrete repair, hot tar pourable sealant advice CT 4 LB 3.35 Bridge Repair Material for concrete repair, rapid set advice CT 4 CY 451.00 Bridge Repair Material for concrete repair, self-leveling cold applied sealant (888) advice CT 4 Tube 45.60 Bridge Repair Patch concrete adv mod OH 519E11710 SF 70.03 Bridge Repair Patch concrete advice OH 519E11600 SF 77.81 Bridge Repair Patch concrete advice OH 519E11720 FT 79.67 Bridge Repair Patch concrete advice OH 519E11100 SF 80.16 Bridge Repair Patch concrete advice OH 519E11710 SY 630.00 Bridge Repair Patch concrete advice OH 519E11900 CY 2,692.00 Bridge Repair Site preparation crew for bridge repair advice CT 16 Hour 223.00 Bridge Repair Steel advice OH 514E00504 MNHR 118.00 Table 26. (Continued).

Component Activity Detail Info State DOT ID Unit Unit Cost $ Bridge Repair Structural steel repair, crew: supervisor + two workers advice CT 9 Hour 217.00 Bridge Repair Traffic control for bridge repair, limited access advice CT 15 Hour 204.00 Bridge Repair Traffic control for bridge repair, non-limited access advice CT 15 Hour 179.00 Bridge Replace hist WI Deck SF 84.30 Bridge Replace Bridge concrete multispan advice MI Deck SF 536.00 Bridge Replace Bridge concrete multispan, over water advice MI Deck SF 686.00 Bridge Replace Bridge steel multispan advice MI Deck SF 596.00 Bridge Replace Bridge steel multispan, over water advice MI Deck SF 746.00 Bridge Replace Coating concrete advice NY 521 SF 3.40 Bridge Replace Coating steel advice NY 515 SF 31.25 Bridge Retrofit Betterment hist OH 6351 Deck SF 2.71 Bridge Retrofit Install sign advice CA 87 Ea 250.00 Bridge Retrofit Seismic advice CA 70 SF 5.11 Bridge Retrofit Seismic advice CA 70 SF 10.00 Bridge Retrofit Seismic advice CA 70 SF 15.00 Bridge Retrofit Seismic advice CA 70 SF 50.00 Bridge Retrofit Widen hist WI Deck SF 97.30 Bridge Seal Concrete hist WI Deck SF 1.70 Channel Clean hist OH 6164 Deck SF 0.323 Channel Clean hist OR Deck SF 18.8 Channel Clean Debris hist PA 3-ECREMVG Deck SF 0.50 Channel Clean Deposit, remove hist PA 12- ECREMDP Deck SF 0.96 Channel Clean Remove debris advice CA 27 Ea Loc 10,000.00 Channel Rehab Scour advice NY 800 LF 499.00 Channel Repair hist OR Deck SF 12.40 Channel Repair Scour hist WI Deck SF 21.90 Channel Repair Scour hole hist PA 11-C745301 Deck SF 1.35 Channel Replace Scour advice NY 800 LF 396.00 Channel Retrofit Protect advice OH 601E35000 CY 61.67 Channel Retrofit Protect advice OH 601E32100 CY 73.34 Channel Retrofit Protect advice OH 601E34200 CY 80.25 Channel Retrofit Protect advice OH 601E34000 CY 84.38 Channel Retrofit Protect advice OH 601E32200 CY 84.71 (continued on next page)

Component Activity Detail Info State DOT ID Unit Unit Cost $ Channel Retrofit Protect advice OH 601E34100 CY 89.19 Channel Retrofit Protect advice OH 601E32000 CY 89.81 Channel Retrofit Protect advice OH 601E34300 CY 90.03 Channel Retrofit Protect advice OH 601E32300 CY 107.00 Channel Retrofit Protect advice OH 601E34400 CY 162.00 Channel Retrofit Protect advice OH 601E35100 LS 3,259.00 Channel Retrofit Protect hist OH 6160 Deck SF 1.02 Channel Retrofit Riprap hist WI Deck SF 2.91 Culvert Rehab Apron advice NY 870 EA 187.00 Culvert Rehab Headwall advice NY 860 LF 59.06 Culvert Rehab RC advice NY 241 LF 14,921.00 Culvert Rehab Steel pipe advice NY 240 LF 9,525.00 Culvert Repair Barrel hist PA 48-C745203 Deck SF 12.00 Culvert Repair Headwall advice NY 860 LF 64.97 Culvert Repair Steel pipe advice NY 240 LF 491.00 Culvert Replace Apron hist PA 63-B745202 Deck SF 1.61 Culvert Replace Apron advice NY 870 EA 284.00 Culvert Replace Culvert, concrete precast, 3- or 4-sided advice MI Deck SF 496.00 Culvert Replace Headwall hist PA 29-A745201 Deck SF 5.14 Culvert Replace Headwall advice NY 860 LF 724.00 Culvert Replace RC advice NY 241 LF 9,586.00 Culvert Replace Steel pipe advice NY 240 LF 207.00 Culvert Retrofit Betterment hist OH 6343 Deck SF 3.11 Deck Clean hist PA 23-A743101 Deck SF 0.32 Deck Clean Clean milled deck adv mod CT 5B SF 2.69 Deck Clean Clean milled deck advice CT 5B SY 24.20 Deck Clean Remove wearing surface advice MI Deck SF 1.50 Deck Clean Remove wearing surface adv mod CT 5A SF 4.21 Deck Clean Remove wearing surface advice CT 5A SY 37.91 Deck Clean Scupper hist PA 1-B743101 Deck SF 0.27 Deck Overlay hist OR Deck SF 4.84 Table 26. (Continued).

Component Activity Detail Info State DOT ID Unit Unit Cost $ Deck Overlay hist CA 5 Deck SF 11.60 Deck Overlay hist WI Deck SF 15.20 Deck Overlay All hist OR Deck SF 7.85 Deck Overlay Bituminous hist WI Deck SF 9.00 Deck Overlay Deep overlay, hydrodemolition, joint replace advice MI SF 32.00 Deck Overlay Epoxy adv mod MI SF 3.78 Deck Overlay Epoxy hist OR Deck SF 6.01 Deck Overlay Epoxy hist WI Deck SF 9.82 Deck Overlay Healer/sealer adv mod MI SF 2.44 Deck Overlay HMA advice CA 05 SF 1.12 Deck Overlay HMA advice CA 05 SF 2.51 Deck Overlay HMA advice CA 04 SF 4.65 Deck Overlay HMA cap, no membrane advice MI SF 1.50 Deck Overlay HMA w/membrane advice MI SF 5.50 Deck Overlay HMA w/membrane advice CA 05 SF 10.00 Deck Overlay HMA w/membrane advice CA 04 SF 12.00 Deck Overlay HMA w/membrane advice CA 05 SF 12.00 Deck Overlay HMA w/membrane advice CA 04 SF 13.00 Deck Overlay Hydrodemolition adv mod OH 848E20000 SF 6.58 Deck Overlay Hydrodemolition advice OH 848E20000 SY 59.24 Deck Overlay Latex-modified concrete adv mod OH 847E10100 SF 11.22 Deck Overlay Latex-modified concrete advice VA SF 18.88 Deck Overlay Latex-modified concrete advice OH 847E10100 SY 101.00 Deck Overlay Latex-modified concrete advice OH 847E20100 CY 1,173.00 Deck Overlay Latex-modified concrete w/ hydrodemolition adv mod OH 848E10100 SF 9.09 Deck Overlay Latex-modified concrete w/ hydrodemolition advice OH 848E10100 SY 81.85 Deck Overlay Latex-modified concrete, material only advice OH 848E30100 CY 725.00 Deck Overlay Microsilica concrete adv mod OH 847E10000 SF 8.12 (continued on next page)

Component Activity Detail Info State DOT ID Unit Unit Cost $ Deck Overlay Microsilica concrete advice OH 847E10000 SY 73.07 Deck Overlay Microsilica concrete advice OH 847E20000 CY 238.00 Deck Overlay Microsilica concrete w/ hydrodemolition adv mod OH 848E10000 SF 5.08 Deck Overlay Microsilica concrete w/ hydrodemolition advice OH 848E10000 SY 45.73 Deck Overlay Microsilica concrete, material only advice OH 848E30000 CY 216.00 Deck Overlay Polyester advice CA 05 SF 8.37 Deck Overlay Polyester advice CA 05 SF 8.55 Deck Overlay Polyester advice CA 04 SF 16.00 Deck Overlay Polymer hist WI Deck SF 161.00 Deck Overlay Resurface hist CA 4 Deck SF 7.58 Deck Overlay Shallow overlay, hydrodemolition, joint replace advice MI SF 30.00 Deck Overlay Superplasticized dense concrete adv mod OH 847E10200 SF 8.40 Deck Overlay Superplasticized dense concrete advice OH 847E10200 SY 75.58 Deck Overlay Superplasticized dense concrete advice OH 847E20200 CY 385.00 Deck Overlay Superplasticized dense concrete w/ hydrodemolition adv mod OH 848E10200 SF 5.00 Deck Overlay Superplasticized dense concrete w/ hydrodemolition advice OH 848E10200 SY 45.00 Deck Overlay Superplasticized dense concrete, material only advice OH 848E30200 CY 167.00 Deck Overlay Water repellant treatment, penetrating adv mod MI SF 2.22 Deck Overlay Wearing surface, removal/replacement, complete-in-place, 500 Sy advice CT 3B SY 113.00 Deck Overlay Wearing surface, removal/replacement, complete-in-place, >500 Sy adv mod CT 3B SF 11.30 Deck Overlay Wearing surface, removal/replacement, complete-in-place, >500 SY advice CT 3B SY 102.00 Deck Overlay Wearing surface, removal/replacement, complete-in-place, 50 to 250 SY adv mod CT 3B SF 17.88 Deck Overlay Wearing surface, removal/replacement, complete-in-place, 50 to 250 SY advice CT 3B SY 161.00 Deck Overlay Wearing surface, removal/replacement, complete-in-place, 500 SY adv mod CT 3B SF 12.59 Table 26. (Continued).

Component Activity Detail Info State DOT ID Unit Unit Cost $ Deck Overlay Wearing surface, removal/replacement, complete-in-place, to 50 SY adv mod CT 3B SF 20.79 Deck Overlay Wearing surface, removal/replacement, complete-in-place, to 50 SY advice CT 3B SY 187.00 Deck Rehab hist CA 3 Deck SF 19.60 Deck Rehab Grid advice NY 28 SF 10.31 Deck Rehab Grid, filled advice NY 29 SF 0.08 Deck Rehab No shoring advice CA 03 SF 21.00 Deck Rehab Prestressed advice NY 13 SF 136.00 Deck Rehab Prestressed top flange advice NY 15 SF 38.38 Deck Rehab Reinforced concrete advice NY 12 SF 997.00 Deck Rehab Reinforced concrete top flange advice NY 16 SF 101.00 Deck Rehab Shoring advice CA 03 SF 74.00 Deck Rehab Sidewalk advice NY 810 SF 182.00 Deck Rehab Slab reinforced concrete advice NY 38 SF 832.00 Deck Rehab Wearing surface advice NY 510 SF 26.23 Deck Remove Pavement hist OR Deck SF 4.12 Deck Repair hist OH 6153 Deck SF 0.33 Deck Repair hist OR Deck SF 1.64 Deck Repair hist WI Deck SF 2.37 Deck Repair Adhesive anchoring of horizontal bars adv mod MI SF 53.33 Deck Repair Bituminous surface hist PA 10-BITWRGS Deck SF 2.69 Deck Repair Concrete hist PA 6-D744303 Deck SF 2.71 Deck Repair Concrete, Type C-L adv mod MI SF 8.64 Deck Repair Concrete grade D only adv mod MI SF 4.94 Deck Repair Concrete grade D only adv mod MI SF 9.88 Deck Repair Concrete Type A adv mod OH 519E12200 SF 67.56 Deck Repair Concrete Type A advice OH 519E12200 SY 608.00 (continued on next page)

Component Activity Detail Info State DOT ID Unit Unit Cost $ Deck Repair Concrete Type A, B, or C adv mod OH 519E12500 SF 48.32 Deck Repair Concrete Type A, B, or C advice OH 519E12500 SY 435.00 Deck Repair Concrete Type B adv mod OH 519E12300 SF 31.45 Deck Repair Concrete Type B advice OH 519E12300 SY 283.00 Deck Repair Concrete Type C adv mod OH 519E12304 SF 48.10 Deck Repair Concrete Type C advice OH 519E12304 SY 433.00 Deck Repair Crack sealer adv mod MI Deck SF 6.67 Deck Repair Deck, complete-in-place, 0 to 25 CF advice CT 3A CF 549.00 Deck Repair Deck, complete-in-place, 0 To 25 CF 8” thick adv mod CT 3A SF 366.00 Deck Repair Deck, complete-in-place, 100.01 to 200 CF advice CT 3A CF 238.00 Deck Repair Deck, complete-in-place, 100.01 to 200 CF 8” thick adv mod CT 3A SF 159.00 Deck Repair Deck, complete-in-place, 25.01 to 100 CF advice CT 3A CF 367.00 Deck Repair Deck, complete-in-place, 25.01 to 100 CF 8” thick adv mod CT 3A SF 245.00 Deck Repair Deck, complete-in-place, greater than 200.01 CF advice CT 3A CF 182.00 Deck Repair Deck, complete-in-place, greater than 200.01 CF 8” thick adv mod CT 3A SF 122.00 Deck Repair Full-depth patch advice MI Deck SF 80.00 Deck Repair Microsilica concrete adv mod OH 519E10000 SF 29.10 Deck Repair Microsilica concrete advice OH 519E10000 SY 262.00 Deck Repair Miscellaneous hist WI Deck SF 62.20 Deck Repair Miscellaneous advice CA 09 Ea Loc 2,500.00 Deck Repair Patch hist CA 1 Deck SF 0.47 Deck Repair Patch advice MI Deck SF 38.00 Deck Repair Patch adv mod OH 519E12510 SF 49.85 Deck Repair Patch advice OH 519E12510 SY 449.00 Deck Repair Patch concrete advice CA 01 Days 2,600.00 Table 26. (Continued).

Component Activity Detail Info State DOT ID Unit Unit Cost $ Deck Repair Patch deep adv mod MI Deck SF 8.65 Deck Repair Patch shallow adv mod MI Deck SF 4.32 Deck Repair Pavement hist OR Deck SF 4.59 Deck Repair Pothole hist CA 2 Deck SF 0.473 Deck Repair Potholes advice CA 02 Days 2,600.00 Deck Repair Reinforced concrete advice NY 12 SF 3.56 Deck Repair Reinforced concrete top flange advice NY 16 SF 1.24 Deck Repair Reinforcing steel, top mat, epoxy-coated bars adv mod MI Deck SF 9.00 Deck Repair Remove HMA for inspection advice CA 04 SF 2.32 Deck Repair Sidewalk advice NY 810 SF 23.27 Deck Repair Slab reinforced concrete advice NY 38 SF 2.35 Deck Repair Wearing surface advice NY 510 SF 0.50 Deck Replace hist WI Deck SF 58.70 Deck Replace hist CA 7 Deck SF 75.40 Deck Replace + Railing hist WI Deck SF 11.00 Deck Replace + Railing advice MI Deck SF 172.00 Deck Replace Grid hist PA 37-C744302 Deck SF 8.48 Deck Replace Grid advice NY 28 SF 2,894.00 Deck Replace Grid, filled advice NY 29 SF 289.00 Deck Replace Header at joint adv mod MI Deck SF 1.35 Deck Replace Membrane hist OR Deck SF 12.80 Deck Replace No shoring advice CA 07 SF 100.00 Deck Replace Overlay + joint hist WI Deck SF 17.40 Deck Replace Overlay + railing hist WI Deck SF 22.00 Deck Replace Prestressed advice NY 13 SF 134.00 Deck Replace Prestressed top flange advice NY 15 SF 3.40 Deck Replace Reinforced concrete advice NY 12 SF 74.85 Deck Replace Shoring advice CA 07 SF 109.00 Deck Replace Sidewalk advice NY 810 SF 35.83 (continued on next page)

Component Activity Detail Info State DOT ID Unit Unit Cost $ Deck Replace Slab reinforced concrete advice NY 38 SF 2,682.00 Deck Replace Timber advice NY 31 SF 4.05 Deck Replace Timber hist PA 35-B744301 Deck SF 5.62 Deck Replace Timber hist OR Deck SF 45.9 Deck Replace Wearing surface advice NY 510 SF 8.04 Deck Replace Widen hist WI Deck SF 116.00 Deck Retrofit Overlay, widen hist WI Deck SF 44.10 Deck Retrofit Remove wearing surface advice CA 04 SF 3.25 Deck Seal hist PA 80-A743401 Deck SF 1.66 Deck Seal hist OR Deck SF 1.82 Deck Seal hist OH 6161 Deck SF 0.14 Deck Seal Epoxy hist OR Deck SF 2.90 Deck Seal Gravity-fed resin adv mod OH 512E73500 SF 1.92 Deck Seal Gravity-fed resin advice OH 512E73500 SY 17.27 Deck Seal Healer/sealer adv mod MI Deck SF 2.44 Deck Seal HMWM adv mod OH 512E10300 SF 2.90 Deck Seal HMWM advice OH 512E10300 SY 26.09 Deck Seal advice CA 06 SF 1.12 Deck Seal Methacrylate advice CA 06 SF 1.21 Deck Seal Methacrylate hist CA 6 Deck SF 1.58 Deck Seal Methacrylate, remove HMA advice CA 04 SF 3.53 Deck Seal Soluble reactive silicate adv mod OH 512E10400 SF 0.84 Deck Seal Soluble reactive silicate advice OH 512E10400 SY 7.57 Drain Repair advice CT 6 Hour 257.00 Drain Repair advice CA DI Days 2,600.00 Drain Replace Downspout hist PA 14-C744402 Deck SF 1.47 Drain Replace Scupper hist PA 52- DRNGRAT Deck SF 1.52 Drain Retrofit Extend scupper hist OH 6165 Deck SF 0.06 Drain Retrofit Scupper hist PA 31-B744401 Deck SF 2.43 Table 26. (Continued).

Component Activity Detail Info State DOT ID Unit Unit Cost $ Joint Rehab advice VA LF 408.00 Joint Rehab AL, NS, RV, TR, WA, WF advice CA 31 LF 132.00 Joint Rehab Assembly advice NY 305 LF 65.78 Joint Rehab Comp Seal hist PA 33-B744102 Deck SF 0.78 Joint Rehab Compression advice NY 302 LF 209.00 Joint Rehab DL, MR advice CA 31 LF 311.00 Joint Rehab Modular hist PA 53-C744102 Deck SF 1.23 Joint Rehab Modular advice NY 303 LF 323 Joint Rehab OP advice CA 31 LF 16.00 Joint Rehab Other hist PA 9-E744102 Deck SF 1.37 Joint Rehab Other advice NY 306 LF 62.02 Joint Rehab Pourable advice NY 301 LF 26.57 Joint Rehab SF advice CA 31 LF 3,130.00 Joint Rehab SS advice CA 31 LF 509.00 Joint Rehab Strip seal advice NY 300 LF 203.00 Joint Repair hist OH 6154 Deck SF 0.23 Joint Repair hist CA 30 Deck SF 0.67 Joint Repair hist PA 4-A744101 Deck SF 2.42 Joint Repair hist WI Deck SF 4.19 Joint Repair AA, AL, BB, DL, MR, NS, OP, RV, SF, SS, TR, WA, WF advice CA 30 LF 25.00 Joint Repair All hist OR Deck SF 1.40 Joint Repair AP advice CA 30 LF 30.00 Joint Repair Compression hist OR Deck SF 1.30 Joint Repair Compression advice NY 302 LF 95.24 Joint Repair Construction reseal, hot poured rubber adv mod MI Deck SF 0.29 Joint Repair Modular hist OR Deck SF 1.13 Joint Repair Modular advice NY 303 LF 107.00 Joint Repair Other advice NY 306 LF 115.00 Joint Repair Plug hist OR Deck SF 1.87 Joint Repair Pourable hist OR Deck SF 0.407 Joint Repair Pourable advice NY 301 LF 141.00 Joint Repair Reseal hist PA 2-A743301 Deck SF 1.55 (continued on next page)

Component Activity Detail Info State DOT ID Unit Unit Cost $ Joint Repair Seal hist OR Deck SF 2.60 Joint Repair Strip seal advice NY 300 LF 190.00 Joint Replace hist OR Deck SF 0.63 Joint Replace hist CA 32 Deck SF 1.00 Joint Replace hist WI Deck SF 7.17 Joint Replace adv mod MI Deck SF 11.59 Joint Replace advice OH 516E14500 SF 15.08 Joint Replace AA, Bridge Crew advice CA 32 LF 30.00 Joint Replace AA, Maintenance Contract advice CA 32 LF 44.00 Joint Replace AL advice CA 32 LF 624.00 Joint Replace AP advice CA 32 LF 154.00 Joint Replace Assembly advice NY 305 LF 500.00 Joint Replace BB, Bridge Crew advice CA 32 LF 60.00 Joint Replace BB, Maintenance Contract advice CA 32 LF 73.00 Joint Replace Compression hist OR Deck SF 0.91 Joint Replace Compression advice NY 302 LF 321.00 Joint Replace Compression advice OH 516E10500 FT 497.00 Joint Replace Continuous seal advice OH 516E14110 FT 12.93 Joint Replace DL, MR advice CA 32 LF 1,649.00 Joint Replace Miscellaneous advice OH 516E14600 FT 431.00 Joint Replace Modular advice NY 303 LF 842.00 Joint Replace Modular advice OH 516E12400 FT 1,541.00 Joint Replace NS, RV, TR, WA, WF advice CA 32 LF 624.00 Joint Replace Other advice NY 306 LF 311.00 Joint Replace Plug hist OR Deck SF 1.83 Joint Replace Plug joint advice OH 846E00102 FT 144.00 Joint Replace Plug joint advice OH 516E31300 FT 161.00 Joint Replace Plug joint advice OH 846E00112 CF 678.00 Joint Replace Plug joint advice OH 516E31400 CY 7,320.00 Joint Replace Plug joint advice OH 846E00122 CY 7,962.00 Joint Replace Pourable advice NY 301 LF 284.00 Joint Replace Seal 1" preformed filler advice OH 516E13600 SF 9.11 Table 26. (Continued).

Component Activity Detail Info State DOT ID Unit Unit Cost $ Joint Replace Seal 1.5" preformed filler advice OH 516E13800 SF 8.86 Joint Replace Seal 1/2" preformed filler advice OH 516E13200 SF 8.41 Joint Replace Seal 1/4" preformed filler advice OH 516E13000 SF 10.24 Joint Replace Seal 2" preformed filler advice OH 516E13900 SF 9.61 Joint Replace Seal 3/4" preformed filler advice OH 516E13400 SF 7.00 Joint Replace Seal armorless advice OH 516E10010 FT 50.73 Joint Replace Seal compression advice OH 516E10000 FT 39.72 Joint Replace Seal compression, seal advice OH 516E10900 FT 72.05 Joint Replace Seal integral abutment advice OH 516E14014 FT 27.11 Joint Replace Seal poured polyurethane advice OH 516E14010 FT 51.65 Joint Replace Seal preformed filler advice OH 516E14000 SF 8.79 Joint Replace Seal semi-integral abutment advice OH 516E14020 FT 33.53 Joint Replace Seal strip, seal advice OH 516E01301 FT 80.73 Joint Replace SF advice CA 32 LF 3,161.00 Joint Replace SS advice CA 32 LF 521.00 Joint Replace Steel dam hist PA 20-D744102 Deck SF 1.29 Joint Replace Steel joint advice OH 516E12201 FT 785.00 Joint Replace Strip seal advice NY 300 LF 190.00 Joint Replace Strip seal advice OH 516E11210 FT 487.00 Joint Replace Strip seal advice OH 516E12301 FT 821.00 Joint Retrofit Eliminate advice VA LF 400.00 Joint Retrofit Horizontal extent advice OH 516E11900 FT 1,839.00 Joint Retrofit Vertical extent advice OH 516E11801 FT 255.00 Railing Paint hist WI Deck SF 1.46 Railing Paint Concrete surface coating adv mod MI SF 0.89 Railing Rehab hist CA 61 Deck SF 0.90 Railing Rehab Metal advice NY 330 LF 553.00 Railing Rehab Reinforced concrete advice NY 331 LF 92.06 Railing Repair hist OH 6157 Deck SF 0.20 Railing Repair hist CA 60 Deck SF 0.28 Railing Repair hist WI Deck SF 1.55 Railing Repair hist OR Deck SF 4.90 (continued on next page)

Component Activity Detail Info State DOT ID Unit Unit Cost $ Railing Repair advice CA 60 Days 2,600.00 Railing Repair Masonry advice NY 334 LF 1,036.00 Railing Repair Metal advice NY 330 LF 135.00 Railing Repair Miscellaneous advice CA 69 Days 2,600.00 Railing Repair Miscellaneous advice CA 69 Days 2,600.00 Railing Repair Miscellaneous advice CA 69 Days 5,200.00 Railing Repair Other advice NY 333 LF 124.00 Railing Repair Reinforced concrete advice NY 331 LF 221.00 Railing Replace hist WI Deck SF 17.30 Railing Replace hist OR Deck SF 42.40 Railing Replace Metal advice NY 330 LF 252.00 Railing Replace RC advice NY 331 LF 462.00 Railing Replace Remove and replace adv mod MI Deck SF 14.47 Railing Replace Timber advice NY 332 LF 205.00 Railing Retrofit hist CA 62 Deck SF 39.70 Railing Retrofit advice CA 62 LF 500.00 Railing Retrofit advice CA 62 LF 500.00 Railing Retrofit Thrie beam retrofit adv mod MI Deck SF 2.00 Substructure Clean Debris hist CA 27 Deck SF 2.44 Substructure Paint Full hist PA 79-D743201 Deck SF 0.41 Substructure Paint Spot hist PA 16-B743201 Deck SF 0.89 Substructure Rehab hist CA 23 Deck SF 14.00 Substructure Rehab Abutment seat advice NY 851 EA 607.00 Substructure Rehab Backwall advice NY 850 LF 375.00 Substructure Rehab Concrete abutment advice NY 215 LF 9,539.00 Substructure Rehab Masonry pier advice NY 213 LF 1,071.00 Substructure Rehab Pier seat advice NY 852 EA 2,505.00 Substructure Rehab Reinforced concrete cap advice NY 234 LF 978.00 Substructure Rehab Reinforced concrete column advice NY 205 EA 9,785.00 Substructure Rehab Reinforced concrete footing advice NY 220 LF 1,327.00 Substructure Rehab Reinforced concrete pier advice NY 210 LF 4,501.00 Table 26. (Continued).

Component Activity Detail Info State DOT ID Unit Unit Cost $ Substructure Rehab Steel column advice NY 202 EA 4,342.00 Substructure Rehab Wingwall advice NY 853 LF 839.00 Substructure Repair hist OH 6155 Deck SF 0.28 Substructure Repair hist WI Deck SF 3.25 Substructure Repair hist OR Deck SF 8.34 Substructure Repair Abutment hist PA 28-B744802 Deck SF 4.33 Substructure Repair Abutment seat advice NY 851 EA 3,205.00 Substructure Repair Backwall advice NY 850 LF 851.00 Substructure Repair Concrete advice VA SY 985.00 Substructure Repair Concrete abutment advice NY 215 LF 524.00 Substructure Repair Concrete underwater advice CT 11 Hour 285.00 Substructure Repair Epoxy inject hist CA 21 Deck SF 0.97 Substructure Repair Epoxy inject cracks advice CA 21 LF 76.00 Substructure Repair Navigation protection hist CA 26 Deck SF 1.19 Substructure Repair Other abutment advice NY 218 LF 1,943.00 Substructure Repair Patch hist CA 20 Deck SF 0.48 Substructure Repair Patch concrete advice CA 20 Days 2,600.00 Substructure Repair Pier hist PA 32-D744802 Deck SF 0.67 Substructure Repair Pier Seat advice NY 852 EA 158.00 Substructure Repair Pile hist OR Deck SF 5.18 Substructure Repair Reinforced concrete cap advice NY 234 LF 680.00 Substructure Repair Reinforced concrete column advice NY 205 EA 8,210.00 Substructure Repair Reinforced concrete pier advice NY 210 LF 84.01 Substructure Repair Repoint hist PA 19-F744804 Deck SF 2.64 Substructure Repair Scour advice CA 25 Ea Loc 2,600.00 Substructure Repair Timber hist OR Deck SF 13.40 Substructure Repair Wingwall advice NY 853 LF 925.00 Substructure Replace hist CA 24 Deck SF 2.36 Substructure Replace hist OR Deck SF 18.20 Substructure Replace Abutment seat advice NY 851 EA 883.00 Substructure Replace Backwall advice NY 850 LF 1,055.00 Substructure Replace Concrete abutment advice NY 215 LF 2,394.00 Substructure Replace Partial hist OR Deck SF 15.30 (continued on next page)

Component Activity Detail Info State DOT ID Unit Unit Cost $ Substructure Replace Pier seat advice NY 852 EA 3,547.00 Substructure Replace Reinforced concrete cap advice NY 234 LF 3,033.00 Substructure Replace Reinforced concrete column advice NY 205 EA 37,387.00 Substructure Replace Reinforced concrete pier advice NY 210 LF 1,519.00 Substructure Replace Timber hist OR Deck SF 13.70 Substructure Replace Wingwall hist WI Deck SF 8.13 Substructure Replace Wingwall advice NY 853 LF 2,545.00 Substructure Retrofit Pier crash wall hist WI Deck SF 8.02 Substructure Seal hist OH 6162 Deck SF 0.204 Substructure Seal hist PA 5-B743401 Deck SF 1.53 Superstructure Clean Steel horizontal surface hist PA 34-D743102 Deck SF 1.27 Superstructure Paint Full hist PA 65-C743201 Deck SF 16.60 Superstructure Paint Spot hist PA 57-A743201 Deck SF 4.13 Superstructure Paint Steel, clean and coat adv mod MI SF 41.04 Superstructure Paint Steel, partial clean and coat adv mod MI SF 82.08 Superstructure Rehab hist CA 11 Deck SF 17.20 Superstructure Rehab Beam end advice NY 831 EA 20,906.00 Superstructure Rehab Gusset plate advice NY 162 EA 429.00 Superstructure Rehab Masonry arch advice NY 145 LF 2,390.00 Superstructure Rehab Pin/Hanger advice NY 161 EA 150.00 Superstructure Rehab Prestressed box advice NY 104 LF 3,834.00 Superstructure Rehab Prestressed girder advice NY 109 LF 158.00 Superstructure Rehab Reinforced concrete arch advice NY 144 LF 1,487.00 Superstructure Rehab Reinforced concrete box advice NY 105 LF 6.46 Superstructure Rehab Reinforced concrete floorbeam advice NY 155 LF 138.00 Superstructure Rehab Secondary advice NY 830 EA 27,894.00 Superstructure Rehab Steel arch advice NY 141 LF 512.00 Superstructure Rehab Steel floorbeam advice NY 152 LF 12,871.00 Superstructure Rehab Steel girder advice NY 107 LF 4,512.00 Superstructure Rehab Steel stringer advice NY 113 LF 27,298.00 Superstructure Rehab Steel truss advice NY 120 LF 1,602.00 Table 26. (Continued).

Component Activity Detail Info State DOT ID Unit Unit Cost $ Superstructure Rehab Stringer reinforced concrete hist PA 42-A744603 Deck SF 16.50 Superstructure Rehab Timber floorbeam advice NY 156 LF 2,145.00 Superstructure Rehab Timber stringer advice NY 117 LF 516.00 Superstructure Repair hist OR Deck SF 4.09 Superstructure Repair hist WI Deck SF 7.30 Superstructure Repair Beam end advice NY 831 EA 2,779.00 Superstructure Repair Concrete advice VA SY 985.00 Superstructure Repair Epoxy inject hist CA 13 Deck SF 1.14 Superstructure Repair Epoxy inject cracks advice CA 13 LF 152.00 Superstructure Repair Fatigue hist OR Deck SF 0.89 Superstructure Repair Patch hist CA 10 Deck SF 0.47 Superstructure Repair Patch concrete advice CA 10 Days 2,600.00 Superstructure Repair Prestressed box advice NY 104 LF 6.23 Superstructure Repair Reinforced concrete arch advice NY 144 LF 1,073.00 Superstructure Repair Reinforced concrete girder advice NY 110 LF 87.89 Superstructure Repair Secondary advice NY 830 EA 2,122.00 Superstructure Repair Steel arch advice NY 141 LF 41.73 Superstructure Repair Steel beam advice VA LF 1,637.00 Superstructure Repair Steel floorbeam advice NY 152 LF 1,192.00 Superstructure Repair Steel girder advice NY 107 LF 71.56 Superstructure Repair Steel stringer advice NY 113 LF 4,550.00 Superstructure Repair Steel truss advice NY 120 LF 94.81 Superstructure Repair Timber truss advice NY 135 LF 11,185.00 Superstructure Replace hist OR Deck SF 14.60 Superstructure Replace hist CA 12 Deck SF 54.60 Superstructure Replace hist WI Deck SF 93.40 Superstructure Replace Beam end advice NY 831 EA 8,848.00 Superstructure Replace Concrete advice MI Deck SF 302.00 Superstructure Replace Concrete over water advice MI Deck SF 382.00 Superstructure Replace Gusset plate advice NY 162 EA 2,087.00 Superstructure Replace Pin and hanger adv mod MI Deck SF 10.16 Superstructure Replace Prestressed box advice NY 104 LF 1,196.00 (continued on next page)

Component Activity Detail Info State DOT ID Unit Unit Cost $ Superstructure Replace Prestressed girder advice NY 109 LF 1,901.00 Superstructure Replace Reinforced concrete arch advice NY 144 LF 1,084.00 Superstructure Replace Reinforced concrete girder advice NY 110 LF 1,274.00 Superstructure Replace Secondary advice NY 830 EA 17,156.00 Superstructure Replace Steel advice MI Deck SF 382.00 Superstructure Replace Steel floorbeam advice NY 152 LF 5,447.00 Superstructure Replace Steel girder advice NY 107 LF 5,749.00 Superstructure Replace Steel over water advice MI Deck SF 462.00 Superstructure Replace Steel stringer hist PA 25-A744602 Deck SF 21.90 Superstructure Replace Steel stringer advice NY 113 LF 2,233.00 Superstructure Replace Steel truss advice NY 120 LF 3,324.00 Superstructure Replace Timber hist PA 60-B744601 Deck SF 3.80 Superstructure Replace Timber stringer hist PA 62-A744601 Deck SF 1.88 Superstructure Retrofit Strengthen hist CA 14 Deck SF 28.60 Superstructure Seal Water repellent treatment, concrete fascia beam adv mod MI Deck SF 7.60 adv mod = modified advice. CF = cubic foot. CY = cubic yard. EA = each. Ea Loc = each location. FT = foot. hist = history. Kit = one kit. LB = pound. LF = linear foot. LS = lump sum. SF = square foot. SY = square yard. Table 26. (Continued).

Next: Appendix D - Bridge Guide »
Proposed AASHTO Guides for Bridge Preservation Actions Get This Book
×
 Proposed AASHTO Guides for Bridge Preservation Actions
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

Many transportation departments have significant practical experience with bridge preservation and have developed conclusions regarding the effectiveness of bridge preservation actions based on those experiences. However, limited efforts have been made to identify, measure, evaluate, and document the short- and long-term performance of specific bridge preservation actions.

The TRB National Cooperative Highway Research Program's NCHRP Research Report 950: Proposed AASHTO Guides for Bridge Preservation Actions presents the development of two AASHTO guides for bridge preservation, including a general guide to preservation of highway bridges and a guide to preservation of highway bridge decks.

Supplementary to the report is Appendix B: Summaries of Information from State DOTs.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!