Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.
53  Actis, C., Unkefer, D., and Lewis, J. Alternative Contracting Methods: Alternative Technical Concepts. Fed- eral Highway Administration, Washington, D.C., 2012 [Online]. http://www.fhwa.dot.gov/everydaycounts/ edctwo/2012/pdfs/edc_atc.pdf. [December 21, 2018]. Akintoye, A., Hardcastle, C., Beck, M., Chinyio, E., and Asenova, D. Achieving Best Value in Private Finance Initiative Project Procurement. Construction Management and Economics, (21)5, 2003, 461â470. Barutha, P. J. A Framework for Value for Money Assessment on PublicâPrivate Partnership Mega-Projects. PhD dissertation. Iowa State University, Ames, Ia., 2016. Colorado Department of Transportation (CDOT). 2018 Annual ReportâHigh Performance Transportation Enter- prise. Denver, CO, 2018. Cui, Q., and Ham, M. Case Studies of Handback Experience With PublicâPrivate Partnerships. Federal Highway Administration, Washington, D.C., 2017. Cui, Q., Ham, M., DeCorla-Souza, P., and Weaver, E. Review of Handback Experience with PublicâPrivate Partner ships. Transportation Research Record: Journal of the Transportation Research Board, No. 2672, 2018, pp. 65â76. DeCorla-Souza, P. Introduction to P3, Presentation, FHWA Office of Innovative Program Delivery. August 23, 2013. https://www.fhwa.dot.gov/ipd/pdfs/p3/intro_p3.pdf [April 21, 2019]. DeCorla-Souza, P. Development of a Transparent Framework for Pre-Procurement Evaluation of Publicâ Private Partnership Project Delivery Options. Transportation Research Record: Journal of the Transportation Research Board, No. 2672, 2018, pp. 1â12. DeCorla-Souza, P., and Lee, D. B. Evaluating the Potential Economic Efficiency of Project Delivery Options. Transportation Research Record: Journal of the Transportation Research Board, No. 2606, 2017, pp. 115â121. Design-Build Institute of America (DBIA). Design-Build Manual of Practice. Design-Build Institute of America, Washington, D.C., 2009, pp. 6â35. Federal Highway Administration (FHWA). Alternative Technical Concepts. Unpublished Presentation, Every Day Counts 2. U.S. Department of Transportation, 2012 [Online]. http://www.fhwa.dot.gov/accelerating/ presentations/atc/ [April 21, 2018]. Federal Highway Administration (FHWA). FHWA P3 Toolkit, 2019. https://www.fhwa.dot.gov/ipd/p3/toolkit/ [April 1, 2019]. Federal Highway Administration (FHWA). Model PublicâPrivate Partnerships Core Toll Concessions Contract Guide. Federal Highway Administration, Washington, D.C., 2014. Federal Highway Administration (FHWA). Tools and Technical Assistance for Evaluation of Alternative Con- tracting Methods. Draft Final Report Contract DTFH6113D00023L, 2019a, in press. Federal Highway Administration (FHWA). Information Source for Major Highway Projects (P3 database), finance initiative projects. Engineering, Construction and Architectural Management, 5(1), 2019b, 9â21. Florida Department of Transportation (FDOT). I-595 Corridor Roadway Improvements Project, Final Version for Execution. FDOT, Tallahassee, Fla., 2009. Gad, G. M., Adamtey, S. A., and Gransberg, D. D. Trends in Quality Management Approaches to Design-Build Transportation Projects. Transportation Research Record: Journal of the Transportation Research Board, No. 2504, 2015, pp. 87â92. Gransberg, D. D., and Barton, R. F. Analysis of Federal Design-Build Request for Proposals Evaluation Criteria. Journal of Management in Engineering, 23(2), 2007, 105â111. Gurgun, A. P., and Touran, A. PPP Experience in the International ArenaâCase of Turkey. Journal of Manage- ment in Engineering, 30(6), 2014, 24â31. Haskins, S., Gale, D., and Kelly, L. Creating and Optimizing New Forms of PublicâPrivate Partnerships in Seattle. Water Science and Technology: Water Supply, 2(4), 2002. pp. 211â218. References
54 Performance Metrics for PublicâPrivate Partnerships Lampley, P., Schwab, P., Perez, E., and Borello, J. I-595 Express Corridor Improvements Project, District 5. Unpublished Presentation, July 7, 2011. Li, B., Akintoye, A., Edwards, P. J., and Hardcastle, C. Critical success factors for PPP/PFI projects in the U.K. Construction Industry. Construction Management and Economics, 23(5), 2005, 459â471. Liu, J., Love, P. E. D., Smith, J., Regan, M., and Sutrisna, M. PublicâPrivate Partnerships: A Review of Theory and Practice of Performance Measurement. International Journal of Productivity and Performance Management, 63(4), 2014, 499â512. Medda, F. R., Carbonaro G., and Davis, S. L. PublicâPrivate Partnerships in Transportation: Some Insights from European Experience. IATSS Research, 36, 2012, 83â87. Minchin, R. E., Li, X., Issa, R. R., and Vargas, G. L. Comparison of Cost and Time Performance of Design-Build vs. Design-Bid-Build Delivery Systems in Florida. Journal of Construction Engineering and Management, 139(10), 2013, 112â123. Mladenovic, G., Vajdic, N., Wündsch, B., and Temeljotov-Salaj, A. Use of Key Performance Indicators for PPP Transport Projects to Meet Stakeholdersâ Performance Objectives. Built Environment Project and Asset Management, 3(2), 2013, 228â249. Molenaar, K. R., Gransberg, D. D., and Sillars, D. N. NCHRP Report 808: Guidebook on Alternative Quality Management Systems for Highway Construction. Transportation Research Board, Washington, D.C., 2015. National Council for PublicâPrivate Partnerships. Michiganâs Freeway Lighting Upgrade P3 Improves Efficiency and Safety. P3 Digest, 2017. Neely, A., Adams, C., and Crowe, P. The Performance Prism in Practice. Measuring Business Excellence, 5(2), 2001, 6â12. Neely, A., Gregory, M., and Platts, K. Performance Measurement System Design: A Literature Review and Research Agenda. International Journal of Operations and Production Management, 25(12), 2005, 1228â1263. Pennsylvania Department of Transportation (PennDOT). Rapid Bridge Replacement Project. Commonwealth of Pennsylvania, 2021. https://www.penndot.gov/ProjectAndPrograms/p3forpa/pages/rapid-bridge- replacement-project.aspx [March 3, 2021]. Perez, B., Giordano, R., Woodhouse, M., and Thompson, J. Report on Highway PublicâPrivate Partnership Concessions in the United States, Report FHWA-HIN-17-006, FHWA, Washington, D.C., 2016, p. 112. Raisbeck, P., Duffield, C. and Xu, M. Comparative Performance of PPPs and Traditional Procurement in Australia. Construction Management and Economics, 28(4), 2010, 345â359. Ramsey, D., and El Asmar, M. Cost and Schedule Performance Analysis of Transportation PublicâPrivate Partner ship Projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(1), 2020. Rossi, P. H., Lipsey, M. W., and Freeman, H. E., Evaluation: A Systematic Approach, 6th ed., Sage Publications, Thousand Oaks, Calif., 2004. Scott, S., III, Konrath, L., and Ferragut, T. SHRP 2 Report S2-R07-RR-1: Performance Specifications for Rapid Highway Renewal. Transportation Research Board of the National Academies, Washington, D.C., 2014. Shields, M. D. Glossary of Federal Acquisition Terms. Federal Acquisition Institute, Washington, D.C., December 1998, 12â14. Smith, N., dela Pena, P., Kussy, E., Sethi, S., Wheeler, P., Gifford, J., and Ybarra, S. PublicâPrivate Partnership (P3) Procurement: A Guide for Public Owners. FHWA-HIN-18-004 March 2019, 150. State of Minnesota. Glossary of Common Procurement Terms. Department of Administration, Materials Manage- ment Division, St. Paul, Min., 2011 [Online] http://www.mmd.admin.state.mn.us/mn06008.htm [July 16, 2019]. Tiong, R. L. K., Yeo, K. M., and McCarthy, S. C. Critical Success Factors in Winning BOT Projects. Journal of Construction Engineering and Management, 18(2), 1992, 217â228. Tran, D. Gransberg, D. D., and Harper, C. NCHRP Synthesis 518: Staffing for Alternative Contracting Methods. Transportation Research Board, Washington, D.C., 2018. VanMeter, D. D. Georgiaâs Path to Innovation. TR News, No. 316, JulyâAugust 2018. Virginia Department of Transportation (VDOT). P3 Risk Management Guidelines. Virginia Office of P3, Richmond, Va., 2015, p. 25. World Bank Group. Concessions, Build-Operate-Transfer (BOT) and Design-Build-Operate (DBO) Proj- ects, Legal Resource Center, 2018, https://ppp.worldbank.org/public-private-partnership/agreements/ concessions-bots-dbos [September 22, 2019]. Yuan, J., Chan, A. P. C., Xiong, W., and Skibniewski, M. J. Perception of Residual Value Risk in PublicâPrivate Partnership Projects: Critical Review. Journal of Management in Engineering, 31(3), 2015. Yuan, J., Zeng, A. Y., Skibniewski, M. J., and Li, Q. Selection of Performance Objectives and Key Performance Indicators in PublicâPrivate Partnership Projects to Achieve Value for Money. Construction Management and Economics, 27(3), 2009, 253â270.