Click for next page ( 23


The National Academies | 500 Fifth St. N.W. | Washington, D.C. 20001
Copyright © National Academy of Sciences. All rights reserved.
Terms of Use and Privacy Statement



Below are the first 10 and last 10 pages of uncorrected machine-read text (when available) of this chapter, followed by the top 30 algorithmically extracted key phrases from the chapter as a whole.
Intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text on the opening pages of each chapter. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

Do not use for reproduction, copying, pasting, or reading; exclusively for search engines.

OCR for page 22
22 GLOSSARY Administrative Modification of the Transportation of a project or a major change in project cost, project/ Improvement Program: A minor revision to a long- project phase initiation dates, or design concept or scope range statewide or metropolitan transportation plan, (e.g., changing project termini or the number of through Transportation Improvement Program (TIP), or State- traffic lanes). Changes to projects included only for illus- wide Transportation Improvement Program (STIP) that trative purposes do not require an amendment. It requires includes minor changes to project/project phase costs, public review and comment, redemonstration of fiscal funding sources of previously included projects, and proj- constraint, or a conformity determination (for metropoli- ect/project phase initiation dates. It does not require pub- tan transportation plans and TIPs involving "nonexempt" lic review and comment, redemonstration of fiscal projects in nonattainment and maintenance areas). In the constraint, or a conformity determination (in nonattain- context of a long-range statewide transportation plan, it is ment and maintenance areas). approved by the state in accordance with its public involvement process. Amendment of the Transportation Improvement Pro- gram: A revision to a long-range statewide or metropoli- TIP Revision: In the context of this report, a revision inclu- tan transportation plan, TIP, or STIP that involves a major sive of all adjustments to the Transportation Improve- change to a project included in a metropolitan transporta- ment Program, regardless of magnitude. tion plan, TIP, or STIP, including the addition or deletion