Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

The erection of steel bridges, depending on the complexity of the structure, may pose critical issues for owners. Given such complexity, plus the great variety of practices being used today, there are often concerns with the integrity, speed, safety, quality, delays, and claims related to steel bridge erection. The number of curved structures and structures with complex geometry that are being constructed adds considerably to the type of steel erection issues that owners, designers, fabricators, erectors, and contractors are faced with at one time or another. A com- pilation of the methods employed by agencies or firms involved in all phases of a project, from design through construction, may be informative and may minimize these difficulties. This synthesis reports the results of and analyzes questionnaires, telephone conversations, specification reviews, and research reports solicited from states, Canadian provinces, fabrica- tors, and erector and contractors. A total of 111 questionnaires were distributed, with responses received from 30 states, 2 provinces, 15 fabricators, and 4 erector/contractors. The report concentrates on girder bridges—both I-girders and box girders. The erection of steel girder bridges is both craft and science. Erection practices are based on experience, rules of thumb, and intuition. Successful erection demands both an effective implementation of these practices, the craft, and a design that has appropriately considered principles of stability, the science. This synthesis addresses the craft. Most of the common problems that occur during erection can be prevented by taking the following measures: • Verifying horizontal and vertical alignment before and during erection; • Installing enough crossframes to maintain geometry and girder stability during erection; • Properly using temporary falsework or additional cranes; and • Rigorously following pinning, bolting, and tightening procedures. It is important to recognize that many erection problems can be attributed to a lack of understanding of girder behavior during erection. Therefore, when dealing with the erection problems, it is important to ask the question, “Is corrective action needed?” Furthermore, establishing acceptable tolerances of deviation from the intended vertical or horizontal align- ment of the superstructure would aid owners in knowing whether a true concern exists and save valuable construction time, while precluding frustration on the part of fabricators and erectors. Although erection problems were reported by all parties, the findings do not suggest that the problems are endemic. Rigorous erection analyses, including the prediction and reporting of intermediate deflections (deflections before the final erected condition), which could antic- ipate the reported problems, are not made before erection. Before more rigorous incremental analysis is routinely instituted, the issue to be considered is whether the potential field costs to solve unanticipated problems exceed any proposed rigorous pre-erection analysis costs. SUMMARY STEEL BRIDGE ERECTION PRACTICES

Next: Chapter One - Introduction »
Steel Bridge Erection Practices Get This Book
×
 Steel Bridge Erection Practices
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

TRB’s National Cooperative Highway Research Program (NCHRP) Synthesis 345: Steel Bridge Erection Practices examines steel bridge erection practices for I-girder, tub-girder, and box-girder bridges; particularly curved, skewed, and staged structures. The report focuses on the impact of design and analysis practices on erection; methods used to predict erection deflections as a function of bridge type and complexity; shop-assembly practices and alternate methods of ensuring properly assembled geometry; stability issues; field connection practices; examples of structures in which erection practices have caused problems; owner requirements for erection procedures, implementation of requirements, and the impact of procedures on the quality of erection; and current and proposed research.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!