National Academies Press: OpenBook
« Previous: Chapter 8 - Guidebook Implementation
Page 38
Suggested Citation:"References and Bibliography." National Academies of Sciences, Engineering, and Medicine. 2020. Guidebooks for Post-Award Contract Administration for Highway Projects Delivered Using Alternative Contracting Methods, Volume 1: Design–Build Delivery. Washington, DC: The National Academies Press. doi: 10.17226/25686.
×
Page 38
Page 39
Suggested Citation:"References and Bibliography." National Academies of Sciences, Engineering, and Medicine. 2020. Guidebooks for Post-Award Contract Administration for Highway Projects Delivered Using Alternative Contracting Methods, Volume 1: Design–Build Delivery. Washington, DC: The National Academies Press. doi: 10.17226/25686.
×
Page 39
Page 40
Suggested Citation:"References and Bibliography." National Academies of Sciences, Engineering, and Medicine. 2020. Guidebooks for Post-Award Contract Administration for Highway Projects Delivered Using Alternative Contracting Methods, Volume 1: Design–Build Delivery. Washington, DC: The National Academies Press. doi: 10.17226/25686.
×
Page 40

Below is the uncorrected machine-read text of this chapter, intended to provide our own search engines and external engines with highly rich, chapter-representative searchable text of each book. Because it is UNCORRECTED material, please consider the following text as a useful but insufficient proxy for the authoritative book pages.

    32    Table 6.1 Summary of D-B construction phase tools Contract administration phase Project complexity Project size Tools for D-B contract administration A lig nm en t D es ig n C on st ru ct io n Cl os eo ut N on -c om pl ex M od er at el y co m pl ex C om pl ex ≤ $1 0 M $1 0 M - $5 0 M > $5 0M Phase 3: Administer Construction of D-B Project 8 D-B specific partnering           9 Continuity of team members           10 FHWA involvement overview           11 Permit commitment database           20 Public announcement          21 Delegation of authority          22 Contractor controlled QC testing        23 Contractor involvement in establishing QC standards        24 Incentive/disincentive program for superior quality        25 Real-time electronic quality management information        26 Dual CEI roles        27 Witness and hold points        28 Payment checklist          = Recommended;  = Consider Case-by-Case;  = Not Recommended 6.4 Summary The construction phase of a project is a joint effort between the agency and the design-builder. The tools introduced in this chapter are ones that agencies can use to administer construction. About half of the tools for this phase were used in one or more of the earlier project phases. Therefore, the project team should already be familiar with using these tools. This allows for continuity between the D-B project phases.

    33    The agency should introduce the team to any new tools that will be implemented in the construction phase, especially the quality-related tools. The primary goal of these tools is to help project participants communicate, document, plan, and execute construction efficiently. The list of tools presented in this chapter may inspire agencies to develop new tools or adapt some of these tools based on the needs of a particular project or the organizational structure of their agency. The descriptions in Appendix A elaborate on the tools and their applicability by project complexity and size.

    34    Chapter 7. Closeout Phase Administration 7.1 Introduction The purpose of this chapter is to introduce the closeout phase and present tools that facilitate administering D-B project closeout. This chapter addresses:  D-B Closeout/Process Overview.  Closeout Phase Contract Administration Tools. Due to the typically larger size of D-B projects and the possible use of multiple construction packages, the closeout phase may be spread out over a longer period of time compared to a traditional D-B-B project. This chapter describes tools to help agencies complete closeout activities in a timely and efficient manner. 7.2 D-B Contract Administration Process The final phase of D-B contract administration is closeout. This phase ensures the project scope is complete and all activities are well documented. In general, the D-B closeout process is similar to the D-B-B closeout process. There are only a few differences for D-B closeout. For example, the engineers may provide less detail in some of their designs because they only needed to design for one builder’s interpretation. So, in some cases, as- built plans may need additional detail to comply with agency requirements for record drawings. As previously stated, the volume of closeout activities is also generally larger than D-B-B due to the possible use of multiple construction packages and the larger scale of the D-B projects. Key activities in the closeout phase include:  Conduct Final Inspection o Perform Inspection o Review Punchlist Work  Review Final Turnover Documentation o Review As-Built Plans o Review Contractor Turnover Documentation o Review Contractor Payments  Review Invoice for Final Payment  Review Corrective Action Completion  Execute Contractor Release  Conduct Contractor Evaluation and Lessons Learned  Execute Warranties

Next: Glossary »
Guidebooks for Post-Award Contract Administration for Highway Projects Delivered Using Alternative Contracting Methods, Volume 1: Design–Build Delivery Get This Book
×
 Guidebooks for Post-Award Contract Administration for Highway Projects Delivered Using Alternative Contracting Methods, Volume 1: Design–Build Delivery
MyNAP members save 10% online.
Login or Register to save!
Download Free PDF

The transportation industry has a need for contract administration guidance.

The TRB National Cooperative Highway Research Program's NCHRP Research Report 939: Guidebooks for Post-Award Contract Administration for Highway Projects Delivered Using Alternative Contracting Methods, Volume 1: Design–Build Delivery provides a practitioner’s guide for construction administration on Design–Build (D-B) projects. Whether an agency is using the D-B contracting method for the first time or has significant experience with the method, this Guidebook provides useful strategies and tools to support D-B project administration. Highway agency personnel are the audience for the Guidebook.

Volume 2, on construction manager–general contractor delivery, and Vol. 3, a research overview, are also available.

READ FREE ONLINE

  1. ×

    Welcome to OpenBook!

    You're looking at OpenBook, NAP.edu's online reading room since 1999. Based on feedback from you, our users, we've made some improvements that make it easier than ever to read thousands of publications on our website.

    Do you want to take a quick tour of the OpenBook's features?

    No Thanks Take a Tour »
  2. ×

    Show this book's table of contents, where you can jump to any chapter by name.

    « Back Next »
  3. ×

    ...or use these buttons to go back to the previous chapter or skip to the next one.

    « Back Next »
  4. ×

    Jump up to the previous page or down to the next one. Also, you can type in a page number and press Enter to go directly to that page in the book.

    « Back Next »
  5. ×

    To search the entire text of this book, type in your search term here and press Enter.

    « Back Next »
  6. ×

    Share a link to this book page on your preferred social network or via email.

    « Back Next »
  7. ×

    View our suggested citation for this chapter.

    « Back Next »
  8. ×

    Ready to take your reading offline? Click here to buy this book in print or download it as a free PDF, if available.

    « Back Next »
Stay Connected!